You are on page 1of 24

MAJD INVESTMENT COMPANY

VOLUMN - IV

BILL OF QUANTITIES

Project : MLC New Office Fit out Works


Location : First Floor Almajdouie Tower - Dammam
Project # : PM/MLC/C/274/21

MAJD INVESTMENT COMPANY


PROJECTS MANAGEMENT ( MAJD-PM)
P.O. Box 336 DAMMAM 31411
DAMMAM
SAUDI ARABIA
Project : MLC New Office Fit out Works
Location : First Floor Almajdouie Tower - Dammam

General Important Notes:

The B.O.Q, Drawings & specifications are one unit and complete each other. The
1 price in the B.O.Q. should cover all the requirements to complete the items as per
the B.O.Q. drawings, specification and Engineer instruction.

The price is Lump sum and quantities in the B.O.Q. are approximated. The price
2
should cover the real quantities, ( if there is any difference) to complete the works.

All B.O.Q. items should been priced. If some items found non-priced, they will
3
considered as “Included”.

The client has the right to modify the scope of works. This modification by adding /
4
cancelling some items (± 20%) of the original items with the same prices.

The contract is lump sum contract but the client has the right to cancel some
5
items. That cancellation must be before the implementation of the items.

The Bidders must check the site, before the pricing to clarify the site
6
conditions.

The contractor shall submit the shop drawings, as built drawings, manuals &
7
guarantee letters.

8 The contractor shall add if they found missed items BOQ


MAJD INVESTMENT COMPANY
Project : MLC New Office Fit out Works
Location : First Floor Almajdouie Tower - Dammam

COMPOSITE SUMMARY

ITEM DESCRIPTION Total Amount ( SR )

DIV. 01 Demolishing Works

DIV. 02 Block Masonry & Plaster

DIV. 03 Gypsum Board Walls Partition

DIV. 04 False Ceiling

DIV. 05 Glazing Works ( All tempered Glass )

DIV. 06 Glass Windows

DIV. 07 Floor Finishing

DIV. 08 Walls Finishing

DIV. 09 Wood Works

DIV. 10 Metal Works

DIV. 11 Marble Works

DIV. 12 Window Curtains

DIV. 13 vinyl sticker

DIV. 14 Deep Cleaning

DIV. 15 Mechanical Works

DIV. 16 Electrical Works

DIV. 17 Furniture

DIV. 18 Additional Items ( missed in BOQ )

Total ( SR )

VAT 15%

Total with VAT


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 01 Demolishing Works
Demolish, Clearing and transfer to general dump area (
approved by municipality ) for all type of materials such as
existing flooring, walls, ceiling, doors & windows, ...etc. All
complete as per drawings, specifications and Engineer L.S. 1
instruction. ( Offices & toilets only tiles on wall & flooring and
ceiling ) used able material handing over to Tower
management team

TOTAL PRICE FOR DIVISION- 01


DIV - 02 Block Masonry & Plaster
2.1 Providing and laying first class machine made hollow
block masonry work as per approved sample. The work
includes required accessories. complete all as per
specifications, drawings and as per Engineer instruction .

Masonry works: Walls & planters and bench seating M2 78


2.2 Providing and laying cement and plaster (1 : 4 ) to walls ( new
and old & columns making edges and corners including cost of
fixing steel net mesh between R.C. members and block
masonry works, preparation of surface before plastering
M2 324
finishing scaffolding curing etc. complete all as per
specifications, drawings and as per Engineer instruction .

2.3 Concrete works for planters and bench seating with 5 cm toe
kick Using Ordinary Portland Cement, including all necessary
form-work, reinforcement, contraction, isolation and
M3 2.70
construction joints, additives, etc, in accordance with
specifications and drawings.

TOTAL PRICE FOR DIVISION- 02

DIV - 03 Gypsum Board Walls Partition

Supply and install the gypsum board with SOUND INSULATION


wall partitions with sound insulation and using the galvanized
stud, runner and 12.5mm Gypsum board sheet both side M2 390
complete all as per drawing, specification and Engineer
instruction.

TOTAL PRICE FOR DIVISION- 03


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV - 04 False Ceiling
4.1 Supply and install 12 mm gypsum board for ceiling , water and
fire resistant included the ( approved ) Paint matt finish.
Complete in all respect as per approved sample, shop drawing, M2 922
specification and Engineer instruction.

4.2 Supply and install ceiling suspended wire mesh panels , white
paint matt finish.
Mesh ceiling grid: 170cm by 120cm
Mesh size:2.5cm by 5cm. Complete in all respect as per M2 842
approved sample, shop drawing, specification and Engineer
instruction.

TOTAL PRICE FOR DIVISION- 04

DIV - 05 Glazing Works ( All tempered Glass )

Supply and install 12mm tempered Clear Glass with Black


5.1 Powder Coating framed ( approved sample )for partitions, M2 529
Height 295 cm.

Supply and install 12mm tempered Clear Glass with Black


5.2 Powder Coating framed ( approved sample ) for partitions M2 115
Height 215 cm.

Supply and install 12mm tempered Clear Glass with Black


5.3 Powder Coating framed ( approved sample ) for partitions with M2 80
35 mm profiles and trims, ( meeting & huddle )

Supply and install 12mm tempered Glass with Black Powder


5.4 Coating framed ( approved sample ) for partitions, FROSTED M2 62
glass wall partitions,

Supply and install frame-less CURVED 12mm tempered glass.


5.5 Height 90 cm for main lobby circle. M2 17.53
As per approved drawings, specs and engineer instructions

Supply and install Door Type D3 - Single leaf Frameless Glass


Swing door with frosted design and including all hardware and
5.6 NO 1
accessories.
Dimension: 80cm x 295 cm
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
Supply and install Door Type D5 - Double leaf Frameless Glass
5.7 door including all hardware and accessories. NO 1
Dimension: 140cm x 295 cm
Supply and install Door Type D6 - Curved Sliding glass door
with smart access gadget (mentioned in electrical) including all
5.8 NO 1
hardware and accessories.
Dimension: 95 x 295 cm
Supply and install Door Type D6 - Sliding glass door with smart
access gadget (mentioned in electrical) including all hardware
5.9 NO 1
and accessories.
Dimension: 100 x 295 cm
Supply and install Door Type D7 - Sliding glass door with smart
access gadget (mentioned in electrical) including all hardware
5.10 NO 3
and accessories.
Dimension: 80 x 295 cm
Supply and install Door Type D10 - Sliding glass door including
5.11 all hardware and accessories. NO 2
Dimension: 130 x 295 cm

Supply and install Door Type D11 - Swing Glass door with Black
5.12 Powder Coating framed including all hardware and accessories. NO 2
Dimension: 80 x 295 cm

Supply and install wooden framed painted semi glossy lacquer


5.13 finish vanity mirror for CEO toilet. No 1
Dimension 180 X 60 cm
TOTAL PRICE FOR DIVISION- 05
DIV - 06 Glass Windows
Supply and install Windows Fixed glass 8mm Black Powder
Coating framed window
6
Typical height 60 cm. Width varies as per type. Types from W1
till W8

6.1 W1 ( size as per drawings ) No 1

6.2 W2 ( size as per drawings ) No 1

6.3 W3 ( size as per drawings ) No 1

6.4 W4 ( size as per drawings ) No 1

6.5 W5 ( size as per drawings ) No 1

6.6 W6 ( size as per drawings ) No 1

6.7 W7 ( size as per drawings ) No 1

6.8 W8 ( size as per drawings ) No 1

TOTAL PRICE FOR DIVISION- 06


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV - 07 Floor Finishing

Supply and install below all type of flooring included all


accessories as required. All floor sample need client approval
on it before implement.

Plain concrete class 21 screed (compressive strength 21 Mpa at


28 days) with Portland cement type I, including fiber
7.1 reinforcement, mechanical floating and leveling and top M2 1600
finishing should be smooth and fare face leveling. ( 5cm min.
thickness )

Supply and install engineered parquet flooring type 1 with 10


7.2 M2 382
cm skirting. Color light natural oak

Supply and install engineered parquet flooring type 2 with 10


7.3 M2 124
cm skirting. Color antique oak

Supply and apply micro-cemented flooring 2 to 3mm, matt


7.4 M2 914
finish. ( MICROCEMENT )

Supply and install terrazzo tiles with 10 cm high skirting


7.5 M2 9
Size 45 x 45 cm

Supply and install Nylon Carpet tiles, size 50 cm x 50 cm. Gray


7.6 M2 96
color with 10 cm high skirting

Supply and install ceramic tile flooring for CEO toilet (Tile size
7.7 M2 2
45 x 45 cm )

Supply and install black painted semi glossy lacquer finish


7.8 LM 762
skirting for micro-cemented flooring finish

Supply and install aluminum floor transition strip between


7.9 LM 9.6
micro-cemented flooring and carpet tiles and or terrazzo tiles

Supply and install wooden floor transition strip between


7.10 LM 35.2
engineered wood flooring and micro-cemented flooring

TOTAL PRICE FOR DIVISION- 07


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV - 08 Walls Finishing

Supply and install the below all works as per design, sizes
and approved shop and sample of material drawings by
Engineer.

Supply and install ceramic wall tiles. Dark greige color. Size 90 x
8.1 m2 19.6
60 cm ( For CEO toilet )

Supply and install ceramic wall tiles. Dark green subway tiles.
8.2 m2 10
Height up to 120 cm from finish floor level. female restrooms

Supply and install ceramic black dado tiles to finish green


8.3 m2 8.1
subway tile edge in female restrooms

Supply and apply plaster and black paint semi glossy finish for
8.4 m2 21
all areas. ( Phone Booth Area )

Supply and apply very light gray paint semi glossy finish for all
8.5 m2 1860
areas.

TOTAL PRICE FOR DIVISION- 08

DIV - 09 Wood Works

Supply, fabricate and install the below all wood works as per
design, sizes and approved shop and sample of material
drawings by Engineer. All accessories for doors and cabinets
must the get approval from client before installation.

9.1 Doors
Supply and install below all type works included all accessories
9.1.1 as required. All sample need client approval on it before
fabrication and implement.
Door Type D1 - Single flush MDF plain design black painted with
9.1.2 semi glossy lacquer finish. pc 30
Door size: 80 * 295 cm
Door Type D1 (Restroom doors) - Single flush MDF plain design
9.1.3 black painted with semi glossy lacquer finish. pc 16
Door size: 80 * 220 cm
Door Type D2 - Single Sliding MDF plain Door, black painted
9.1.4 semi glossy lacquer finish. pc 17
Dimension: 80 * 295 cm
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
Door Type D4 - Single hinged MDF door with corrugated sheet
9.1.5 black painted semi glossy finish. pc 6
Dimension: 80 * 295 cm
Door Type D8 - Single hinged MDF door french oak veneer clear
semi glossy finish. Architrave to be black painted semi glossy
9.1.6 pc 2
lacquer finish. Handle accessory to be black. Dimension: 80 *
295 cm
Door Type D9 - Single Hinger Hidden MDF door to be painted
9.1.7 pc 1
same finish as wall. Dimension: 80 * 295 cm
9.2 Reception desk
Manufacture and install Main entrance reception desk. MDF
micro-cemented main desk with 5 cm toe kick and hidden light
9.2.1 pc 1
cove. MDF painted dark gray super gloss finish.
Design drawing to be provided.

9.3 Bench seating


Manufacture and install bench seating
9.3.1 Dimension: 410 cm * 50 cm * 40 cm with 5 cm toe kick pc 1
( For CEO meeting room )
Manufacture and install bench seating
Dimension: 310 cm * 60 cm * 40 cm with 5 cm toe kick
9.3.2 MDF Oak veneer, clear coat semi glossy lacquer finish. ( For pc 1
CEO meeting room )

Manufacture and install Vanity unit, with a top mounted


washbasin.
9.3.3 Dimension: 148 x 60 x 45 cm pc 1
MDF Oak veneer, clear coat semi glossy lacquer finish.
Washbasin to be provided by client. ( for CEO restroom)

9.4 Storage Cabinet & shelves


9.4.1 Manufacture and install TYPICAL STORAGE CABINET CB 01
(same design and height different widths)
Visible fronts: MDF black painted with clear coat semi glossy
lacquer finish. pc 2
Inside of cabinets: MDF white melamine
Finger pull handle
5 cm toe kick ( for COO & CUSTOMS )
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
9.4.2
Manufacture and install UPPER CABINET storage unit CB 02
Visible fronts: MDF natural oak veneer and black painted with
clear coat semi glossy lacquer finish.
pc 3
Inside of cabinets: MDF white melamine
Pull up mechanism
Dimension: 120 cm * 60 cm * 70 cm ( for COO & CUSTOMS )

9.4.3 Manufacture and install DRAWER STORAGE CB 03 (typical


design)
Visible fronts: MDF natural oak veneer with clear coat semi
glossy lacquer finish. pc 1
Inside of cabinets: MDF white melamine
Groove handle ( for COO & CUSTOMS )
Dimension: 325 cm * 50 cm * 75 cm
9.4.4 Manufacture and install DRAWER STORAGE CB 03 (typical
design)
Visible fronts: MDF natural oak veneer with clear coat semi
glossy lacquer finish. pc 2
Inside of cabinets: MDF white melamine
Groove handle ( for finance department )
Dimension: 506 cm * 50 cm * 75 cm
9.4.5 Manufacture and install 2 shelves above printing station. CB04 (
for finance department )
pc 2
Dimension: 245 * 50 * 3.6 cm
MDF Oak veneer, clear coat semi glossy lacquer finish.
9.4.6 Manufacture and install TYPICAL STORAGE CABINET CB 05
(same design and height different widths) 3 drawer units with
upper cabinet doors
Visible fronts: MDF Light natural oak veneer with clear coat
pc 3
semi glossy lacquer finish.
Inside of cabinets: MDF white melamine
Finger pull handle ( for finance department )
5 cm toe kick
9.4.7 Manufacture and install TYPICAL STORAGE CABINET CB 05
(same design and height different widths) 3 drawer units with
upper cabinet doors
Visible fronts: MDF Light natural oak veneer with clear coat
pc 4
semi glossy lacquer finish.
Inside of cabinets: MDF white melamine
Finger pull handle
5 cm toe kick
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
9.4.8
Manufacture and install TYPICAL LOW STORAGE CABINET CB 06
(same design and height different widths).
Visible fronts: MDF Light natural oak veneer with clear coat
semi glossy lacquer finish. pc 3
Inside of cabinets: MDF white melamine
Finger pull handle
5 cm toe kick
9.4.9
Manufacture and install 2 shelves above printing station. CB07
Dimension: 328 * 50 * 3.6 cm pc 2
MDF Oak veneer, clear coat semi glossy lacquer finish.
9.4.10
Manufacture and install 2 shelves above printing station. CB07
Dimension: 240 * 50 * 3.6 cm pc 2
MDF Oak veneer, clear coat semi glossy lacquer finish.
9.4.11
Manufacture and install 2 shelves above printing station. CB07
Dimension: 215 * 50 * 3.6 cm pc 2
MDF Oak veneer, clear coat semi glossy lacquer finish.
9.4.12
Manufacture and install printing station side cabinet .
Dimension: 100 * 60 * 120 cm
MDF Oak veneer sides, clear coat semi glossy lacquer finish. pc 1
MDF black painted door fronts, clear coat semi glossy lacquer
finish.
9.4.13
Manufacture and install 2 shelves above printing station. CB07
Dimension: 215 * 50 * 3.6 cm pc 2
MDF Oak veneer, clear coat semi glossy lacquer finish.
9.4.14 Manufacture and install typical ARCHIVE storage unit CB 08
(same design and height different widths); 2 below drawers
and 4 upper cabinet doors. Adjustable shelf for each cabinet
box.
pc 15
MDF painted same color as walls, clear coat semi glossy lacquer
finish.
Inside of cabinet MDf white melamine.
Groove handles
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
9.4.15 Manufacture and install FILING CABINET CB 09
Visible fronts: MDF Light natural oak veneer with clear coat
semi glossy lacquer finish.
pc 1
Inside of cabinets: MDF white melamine
Finger pull handle
5 cm toe kick
9.4.16 Manufacture and install FILING CABINET with planter on top
CB 10
Note:Planter has artificial plantation
Visible fronts: MDF Light natural oak veneer with clear coat
semi glossy lacquer finish.
Inside of cabinets: MDF white melamine pc 1
Planter finish: MDF, black painted with clear coat semi glossy
lacquer finish.
Finger pull handle
5 cm toe kick
Dimension: 530 * 50 * height as per drawing
9.4.17 Manufacture and install COFFEE STATION BASE & UPPER
CABINET CB 11
Visible fronts: MDF Light natural oak veneer with clear coat
semi glossy lacquer finish.
Inside of cabinets: MDF white melamine pc 1
Finger pull handle
5 cm toe kick
Base Dimension: 70 * 70 * 90 cm
Upper Dimension: 70 * 45 * 45 cm
9.4.18
Manufacture and install KITCHEN CABINET
Dimensions as per design drawing
MDF, black painted with clear coat, semi glossy lacquer finish
All base is drawer cabinet with except of the sink it is fake
drawer front.
Total kitchen dimension: 290 cm * 60 * * 87 cm
LS 1
10 cm toe kick
Groove handle
Upper cabinet, MDF oak wood veneer with clear coat semi
glossy lacquer finsih. 3 box cabinet with Pull up mechanism for
each. Total cabinet dimension: 290 cm * 45 * 45 cm
( for pantry )
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
9.4.19
Manufacture and install floating shelves
MDF, black painted with clear coat, semi glossy lacquer finish
pc 12
Dimension: 65 * 35 * 3.6 cm
( for pantry )
9.4.20
Manufacture and install floating shelves
MDF, black painted with clear coat, semi glossy lacquer finish
pc 10
Dimension: 65 * 50 * 3.6 cm
( for pantry )
9.4.21
Manufacture and install custom bench upholsterer seating
MDF oak veneer, clear coat with semi glossy lacquer finish
pc 1
Dimension 290 * 60 * 45/90 cm
5 cm toe kick ( for pantry )

9.4.22
Manufacture and install custom bench upholsterer seating
MDF oak veneer, clear coat with semi glossy lacquer finish
pc 1
Dimension 612 * 60 * 45/90 cm
5 cm toe kick ( for pantry )

9.4.23
Manufacture and install wooden trophies display cabinets.
MDF painted blue same branding color as company, with clear
pc 4
coat semi glossy lacquer finish. Wire mesh painted same blue
color on the sides. Each shelf has a spotlight ( Reception Area )
9.4.24 Manufacture and install wood decking strip on concrete bench
seating
Color: Oak wood
pc 4
Dimensions and design as per design drawings ( Reception
Area )

TOTAL PRICE FOR DIVISION- 09


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV - 10 Metal Works

Supply and install wire mesh decorative element in front of


10.1 m2 16
fixed glass panels, painted same color as wall finish

Supply and install wire mesh decorative element on wall,


10.2 m2 12
painted blue same branding color of majdouie.

Manufacture and install L shaped signage metal sheet board


10.3 way finding , Black paint matt finish with rivets. Size width 90 pc 3
cm Height 60 cm, thickness as needed.

Manufacture and install Lighting structure. Design drawing to


10.4 pc 1
be provided

Supply and install white painted semi glossy finish corrugated


10.5 m2 11.16
metals sheet behind CEO desk.

Supply and install black painted semi glossy finish corrugated


10.6 m2 9
metals sheet behind kitchen.

TOTAL PRICE FOR DIVISION- 10

DIV -11 Marble Works

Supply and install solid surface (i.e Artificial marble ) counter


11.1 top for kitchen. Size: 290 x 62 x 4 cm. As per approved m2 1.8
drawings, specs and engineer instructions ( Pantry )

Supply and mechanically install marble piece on wall.


11.2 m2 4.65
Marble size: 1.5 x 3.1 x 1 cm ( CEO Office )

TOTAL PRICE FOR DIVISION- 11


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV - 12 Window Curtains

Contractor must be check actual size of windows on site.


Supply and install automated roller curtains, as per approved
12.1 drawings, specs and engineer instructions ( Control with lm 4.2
remote )
Supply and install automated ripple fold velvet warm greige
12.2 lm 4.2
color. ( Control with remote )

Supply and install manual roller curtains, as per approved


12.3 drawings, specs and engineer instructions ( Control with lm 72.3
remote )

TOTAL PRICE FOR DIVISION- 12

DIV - 13 vinyl sticker

Supply and apply vinyl sticker numbering for cabins (closed


13.1 pc 40
offices). Design and size as per drawings provided.

Supply and apply vinyl sticker Braiding graphics on walls. Design


13.2 pc 9
and size as per drawings provided.

Supply and apply vinyl sticker graphics on bathrooms walls.


13.3 pc 6
Design and size as per drawings provided.

Supply and apply vinyl sticker, Lettering for Meeting rooms.


13.4 pc 10
Design and size as per drawings provided.

Supply and apply vinyl sticker for Departments' name. Design


13.5 pc 8
and size as per drawings provided.

DIV - 14 Deep Cleaning

Deep Cleaning for all project area including flooring, walls,


14.1 doors, windows, celling…..etc. ( old & new ) need deep cleaning LS 1
with specialist company.

TOTAL PRICE FOR DIVISION- 14


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 15 Electrical Works

General Note: -
Contractor must be check the all exiting elecrical system and all
wire, terminations, PB, outlets, lights…..etc. The Contractor is to
allow for all necessary interface coordinated works associated
with the construction of proposed discipline. Works to include
but not limited to the following:

1 Electrical Panel Board

Modification, Testing, commissioning, for existing electrical


panel boards as per site requirement included the adding circuit
breakers ( if required ) and cables and all other accessories NO 8
required to make proper function in safe way. As per approved
shop drawing by electrical engineer and client instruction.

2 SOCKET OUTLETS:
SUPPLY, INSTALLATION AND COMMISSIONING OF POWER
RECEPTACLES COMPLETE WITH GALAVANIZED STEEL BOXES,
CONDUIT , WIRINGS ( SIZE AND NUMBER OF THE WIRES IS
ACCORDING TO THE DRAWING ) AND OTHER ACCESSORIES TO
SOURCE PANEL.
SELECTION ABB ,SCHNEIDER , LEGRAND MADE IN FRANCE OR
APPROVED EQUIVALENT
Supply and install electrical single outlet 220V for general use. (
2.1 pc 97
legrand )
Supply and install Single Waterproof electrical outlet 220V for
2.2 pc 8
general. ( legrand )

Supply and install Electrical floor box 4 compartments for two


2.3 220V, one HDMI and one telephone outlet for general use . ( pc 57
legrand )

Supply and install Electrical floor box 4 compartments for three


2.4 pc 153
220V, and one telephone outlet for general use. ( legrand )

2.5 Supply and install single HDMI outlet. ( legrand ) pc 17

2.6 Supply and install single telephone outlet (VOIP system). pc 11


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 15 Electrical Works

3 Lights

SUPPLY, INSTALLATION AND COMMISSIONING OF LIGHTING


FIXTURES , COMPLETE WITH GALVANIZED STEEL BOXES ,
CONDUIT , WIRINGS ( WIRING SIZE ACCORDING TO THE
DRAWINGS) , SWITCHES , TOGGLE SWITCHS , AND OTHER
ACCESSORIES TO SOURCE PANEL. THE LIGHTING UNITS MUST BE
ACCORDING TO CONSULTANT APPROVAL
5 YEARS GRANTEE
EUROPE, TURKEY, KOREAN OR APPROVED EQUIVALENT

3.1 Lights type - 1 ( as shown drawing legend ) No 26

3.2 Lights type - 2 ( as shown drawing legend ) No 5

3.3 Lights type - 3 ( as shown drawing legend ) No 38

3.4 Lights type - 4 ( as shown drawing legend ) No 2

3.5 Lights type - 5 ( as shown drawing legend ) No 2

3.6 Lights type - 6 ( as shown drawing legend ) No 105

3.7 Lights type - 7 ( as shown drawing legend ) No 51

3.8 Lights type - 8 ( as shown drawing legend ) No 28

3.9 Lights type - 9 ( as shown drawing legend ) No 12

3.10 Lights type - 10 ( as shown drawing legend ) No 41

3.11 Lights type - 11 ( as shown drawing legend ) LM 90

3.12 Lights type - 12 ( as shown drawing legend ) No 1

3.13 Lights type - 13 ( as shown drawing legend ) No 9

3.14 Lights type - 14 ( as shown drawing legend ) No 7

3.15 Lights type - 15 ( as shown drawing legend ) No 1

3.16 Lights type - 16 ( as shown drawing legend ) No 1

3.17 Lights type - 17 ( as shown drawing legend ) No 136

3.18 Lights type - 18 ( as shown drawing legend ) No 2

3.19 Lights type - 19 ( as shown drawing legend ) No 1

3.20 Lights type - 20 ( as shown drawing legend ) No 1

3.21 hidden indirect lighting bench seating LS 1


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 15 Electrical Works

4 Lights Switches
supply, installation, testing and commissioning include wires,
outlet boxes, PVC or EMT or RGS conduits as application. using
for pipes and conduit fittings PANASONIC brand and ENERGYA
brand for CU wires , including terminations, all accessories,
ancillary works and materials required for complete
installation back to panel board or second outlet or for related
switches complete with all accessories (LEGRAND MADE IN
FRANCE OR EQUVILENT APPROVED)

4.1 one gang lighting switches. NO 4

4.2 two gang 2 way lighting switches NO 35

4.3 three gang lighting switches NO 17

5 CCTV

Supply and installation of CCTV SYSTEM, including the following


items complete with cables, wires, conduits, boxes, pull boxes,
according to specifications and method of measurement as well NO 16
as all necessary accessories for a fully functional system. ( Need
approved brand same as existing used in Almajdouie towers )

6 Access controls
Supply and installation of Access controls, including the
following items complete with cables, wires, conduits, boxes,
pull boxes, according to specifications and method of NO 7
measurement as well as all necessary accessories for a fully
functional system.

7 Speaker system

Supply and Install Speaker system, including the following items


complete with cables, wires, conduits, boxes, pull boxes,
NO 10
according to specifications and method of measurement as well
as all necessary accessories for a fully functional system.
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 15 Electrical Works
8 FIRE ALARM SYSTEM
supply, installation, relocate, testing and commissioning
include wires, outlet boxes, PVC or EMT or RGS conduits as
application. using for pipes and conduit fittings PANASONIC
brand and BELDEN brand for sheathed wires, including
terminations, all accessories, ancillary works and materials
required for complete installation back to FACP and NO 97
connect it to main building FACP complete with all
accessories including programming. ( if required adding
aditional as per site requirement and drawings are
inculuded. )
9 IT SYSTEM Data Cables
Supply and installation IT cable ( Commscope - Systimax
UTP CAT6A cable roll 305 Meters) included the pipes and
data ports from each point area
office/workstations/meeting room or any other area...
NO 215
cable up to data cabinets. all complete with all accessories
as per the specification and engineer instruction.

Total for Electrical Works


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 16 Mechanical Works
A HVAC System
Supply and install complete HVAC system included all
requirements to complete the system.
1 Calculation the all AC system as per space and make the
report through qualified mechnical engineer and check the
existing available AC units, its enugh or need to add more as LS 1
per office area.
2 Make full service for exiting FCU (parts excluded) and
including removing and refix, cleaning all as required. NO 35
Complete as per engineer instruction.

3 Design, modification, supply, Installation, Testing and


Commissioning Galvanized Steel Duct work including hangers
and Support in accordance with SMACNA standards. Also
flexible round duct including tape straps ,hangers and
accessories, all flexibles shall not exceed 1.8mtr. Length max
and shall be bend freeIncluding. All diffusers ( supply & return
), volume control Motorized dumper and all other LS 1
accessories required to complete the work. As per Approved
Shop drawings and Engineer's Instruction and mentioned
below but not limited. Motorized dumper should be installed
in all offices and fix thermostat in each office. ( Note check
the furniture layout and make HVAC design accordingly )

G.I.sheet metal duct (Gauge 24) non flanged, including


volume dampers, supports, steel brackets, angular bars, drive
clips and all related fixing accessories with fiberglass duct
insulation, 25mm thick x 24 kg/m3 density including sealants,
adhesive tapes, straps, and related accessories. ( all
thermostat will be replace with new approval sample. )

B EXHAUST VENTILATION SYSTEM


Supply and installation the EXHAUST VENTILATION SYSTEM
included grill terminal, including flexible duct, complete with
fittings, hangers support, diffuser box . to be connected to
existing exhaust duct. For all toilets ( 5 place as shown on
drawings ) and Pantry as shown locations in drawings.

4.1 CEO Toilet LS 1


4.2 WOMEN'S LOUNGE LS 1
4.3 MEN'S TOILETS in Main Lobby Area LS 1
4.4 COMMERCIAL DEPARTMENT LS 1
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 16 Mechanical Works
4.5 NEAR PROCUREMENT DEPAERTMRNT LS 1

C Firefighting
Modify and relocate the exiting sprinkles and fire
fighting system as per the new layout reviewed by
specialist consultant included the all size pipes and
sprinklers if needed additional also induced. All
complete as per Engineer’s Instruction and Shop L.S. 1
Drawing approval. ( All works as per civil defense
standard and each sprinkles must be in center of office )

D Plumbing & Sanitary Works

All sanitary fixtures shall be from American Standard,


GROHE or approved equal.
1 Drainage Works
Modification and adding required Drainage Works for
exiting and new CEO toilet drainage pipes, fittings and
connection to nearest exiting source as per the LS 1
approved shop drawings by engineer. ( for all toilets as
shown in drawings in 05 location )

2 Water supply Works


Modification and adding as per required on site for
exiting water supply pipes, fittings, valves and
connection to nearest exiting source as per the LS 1
approved shop drawings by engineer. ( for all toilets as
shown in drawings in 05 location )
3 Plumbing Fixtures
Replace the all below Plumbing Fixtures, works included
remove exiting all and fix new as per approved sample
by client ( American Standard, GROHE or approved equal
) Also included new toilet for CEO office.

Counter Top washbasin with mixer all fittings and marble (


3.1 approved sample ) for all 05 locations toilets as per required No 13
there, see the drawings.

3.2 Western Type Water Closet No 13

3.3 Eastern type water close No 1


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 16 Mechanical Works
3.3 Replacement with new urinal No 4

3.3 Shataf No 14

3.4 Toilet Paper Holder No 14

3.5 Liquid Soap Dispenser No 13

3.6 CEO Toilet - Glass Mirror No 1

3.7 WOMEN'S LOUNGE Glass Mirror No 1

3.8 MEN'S TOILETS in Main Lobby Area Glass Mirror No 1

3.9 COMMERCIAL DEPARTMENT Glass Mirror No 1

4 NEAR PROCUREMENT DEPAERTMRNT Glass Mirror No 1

Hand Dryer, Automatic sensor, surface mounted, stainless


4.1 steel screws, 220V, 7.7 AMP, 1500 to 1700 Watts, 50/60 HZ, No 5
Single Phase, VDE Approved. BOBRICK

4.2 Floor drain grate No 10

Supply and install Phenolic Toilet Partitions with doors as per


the approved sample & color for toilets including lockset,
frames, anchorage, sealant and other accessories to complete 2
4.3 M 43.00
the job and as per drawings. All complete as per
specifications, drawings and Engineer instruction.

Total for Mechanical Works


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam

BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)

DIV- 17 Furniture
Importnat Note:- Contractor will be prepare the furniture BOQ as per furniture
layout for all areas offices, workstations, meeting rooms, pantry….etc.. He can
get the all size from ACAD drawings. All furniture need shop drawing and
material sample approval before the fabrication and installation from client. All
design must be match with perspactives and also if he missed any items in BOQ
( not price ) and its required as shown in drawing, It is inculuded in his scope of
works. So make the BOQ for all items as shown in drawings and perspectives.

Total Prices for Furniture


Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 18 Additional Items
Note:- Bidders can add here missed items if not
included in BOQ and shown in drawing or required on
site.

Total for Additional Items

You might also like