Professional Documents
Culture Documents
VOLUMN - IV
BILL OF QUANTITIES
The B.O.Q, Drawings & specifications are one unit and complete each other. The
1 price in the B.O.Q. should cover all the requirements to complete the items as per
the B.O.Q. drawings, specification and Engineer instruction.
The price is Lump sum and quantities in the B.O.Q. are approximated. The price
2
should cover the real quantities, ( if there is any difference) to complete the works.
All B.O.Q. items should been priced. If some items found non-priced, they will
3
considered as “Included”.
The client has the right to modify the scope of works. This modification by adding /
4
cancelling some items (± 20%) of the original items with the same prices.
The contract is lump sum contract but the client has the right to cancel some
5
items. That cancellation must be before the implementation of the items.
The Bidders must check the site, before the pricing to clarify the site
6
conditions.
The contractor shall submit the shop drawings, as built drawings, manuals &
7
guarantee letters.
COMPOSITE SUMMARY
DIV. 17 Furniture
Total ( SR )
VAT 15%
2.3 Concrete works for planters and bench seating with 5 cm toe
kick Using Ordinary Portland Cement, including all necessary
form-work, reinforcement, contraction, isolation and
M3 2.70
construction joints, additives, etc, in accordance with
specifications and drawings.
4.2 Supply and install ceiling suspended wire mesh panels , white
paint matt finish.
Mesh ceiling grid: 170cm by 120cm
Mesh size:2.5cm by 5cm. Complete in all respect as per M2 842
approved sample, shop drawing, specification and Engineer
instruction.
Supply and install Door Type D11 - Swing Glass door with Black
5.12 Powder Coating framed including all hardware and accessories. NO 2
Dimension: 80 x 295 cm
Supply and install ceramic tile flooring for CEO toilet (Tile size
7.7 M2 2
45 x 45 cm )
Supply and install the below all works as per design, sizes
and approved shop and sample of material drawings by
Engineer.
Supply and install ceramic wall tiles. Dark greige color. Size 90 x
8.1 m2 19.6
60 cm ( For CEO toilet )
Supply and install ceramic wall tiles. Dark green subway tiles.
8.2 m2 10
Height up to 120 cm from finish floor level. female restrooms
Supply and apply plaster and black paint semi glossy finish for
8.4 m2 21
all areas. ( Phone Booth Area )
Supply and apply very light gray paint semi glossy finish for all
8.5 m2 1860
areas.
Supply, fabricate and install the below all wood works as per
design, sizes and approved shop and sample of material
drawings by Engineer. All accessories for doors and cabinets
must the get approval from client before installation.
9.1 Doors
Supply and install below all type works included all accessories
9.1.1 as required. All sample need client approval on it before
fabrication and implement.
Door Type D1 - Single flush MDF plain design black painted with
9.1.2 semi glossy lacquer finish. pc 30
Door size: 80 * 295 cm
Door Type D1 (Restroom doors) - Single flush MDF plain design
9.1.3 black painted with semi glossy lacquer finish. pc 16
Door size: 80 * 220 cm
Door Type D2 - Single Sliding MDF plain Door, black painted
9.1.4 semi glossy lacquer finish. pc 17
Dimension: 80 * 295 cm
Project : MLC New Office Fit out Works
Location : Almajdouie Tower First Floor - Dammam
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
Door Type D4 - Single hinged MDF door with corrugated sheet
9.1.5 black painted semi glossy finish. pc 6
Dimension: 80 * 295 cm
Door Type D8 - Single hinged MDF door french oak veneer clear
semi glossy finish. Architrave to be black painted semi glossy
9.1.6 pc 2
lacquer finish. Handle accessory to be black. Dimension: 80 *
295 cm
Door Type D9 - Single Hinger Hidden MDF door to be painted
9.1.7 pc 1
same finish as wall. Dimension: 80 * 295 cm
9.2 Reception desk
Manufacture and install Main entrance reception desk. MDF
micro-cemented main desk with 5 cm toe kick and hidden light
9.2.1 pc 1
cove. MDF painted dark gray super gloss finish.
Design drawing to be provided.
9.4.22
Manufacture and install custom bench upholsterer seating
MDF oak veneer, clear coat with semi glossy lacquer finish
pc 1
Dimension 612 * 60 * 45/90 cm
5 cm toe kick ( for pantry )
9.4.23
Manufacture and install wooden trophies display cabinets.
MDF painted blue same branding color as company, with clear
pc 4
coat semi glossy lacquer finish. Wire mesh painted same blue
color on the sides. Each shelf has a spotlight ( Reception Area )
9.4.24 Manufacture and install wood decking strip on concrete bench
seating
Color: Oak wood
pc 4
Dimensions and design as per design drawings ( Reception
Area )
General Note: -
Contractor must be check the all exiting elecrical system and all
wire, terminations, PB, outlets, lights…..etc. The Contractor is to
allow for all necessary interface coordinated works associated
with the construction of proposed discipline. Works to include
but not limited to the following:
2 SOCKET OUTLETS:
SUPPLY, INSTALLATION AND COMMISSIONING OF POWER
RECEPTACLES COMPLETE WITH GALAVANIZED STEEL BOXES,
CONDUIT , WIRINGS ( SIZE AND NUMBER OF THE WIRES IS
ACCORDING TO THE DRAWING ) AND OTHER ACCESSORIES TO
SOURCE PANEL.
SELECTION ABB ,SCHNEIDER , LEGRAND MADE IN FRANCE OR
APPROVED EQUIVALENT
Supply and install electrical single outlet 220V for general use. (
2.1 pc 97
legrand )
Supply and install Single Waterproof electrical outlet 220V for
2.2 pc 8
general. ( legrand )
3 Lights
4 Lights Switches
supply, installation, testing and commissioning include wires,
outlet boxes, PVC or EMT or RGS conduits as application. using
for pipes and conduit fittings PANASONIC brand and ENERGYA
brand for CU wires , including terminations, all accessories,
ancillary works and materials required for complete
installation back to panel board or second outlet or for related
switches complete with all accessories (LEGRAND MADE IN
FRANCE OR EQUVILENT APPROVED)
5 CCTV
6 Access controls
Supply and installation of Access controls, including the
following items complete with cables, wires, conduits, boxes,
pull boxes, according to specifications and method of NO 7
measurement as well as all necessary accessories for a fully
functional system.
7 Speaker system
C Firefighting
Modify and relocate the exiting sprinkles and fire
fighting system as per the new layout reviewed by
specialist consultant included the all size pipes and
sprinklers if needed additional also induced. All
complete as per Engineer’s Instruction and Shop L.S. 1
Drawing approval. ( All works as per civil defense
standard and each sprinkles must be in center of office )
3.3 Shataf No 14
BILL OF QUANTITIES
S/No. Description Unit Qty Rate (SR) Amount (SR)
DIV- 17 Furniture
Importnat Note:- Contractor will be prepare the furniture BOQ as per furniture
layout for all areas offices, workstations, meeting rooms, pantry….etc.. He can
get the all size from ACAD drawings. All furniture need shop drawing and
material sample approval before the fabrication and installation from client. All
design must be match with perspactives and also if he missed any items in BOQ
( not price ) and its required as shown in drawing, It is inculuded in his scope of
works. So make the BOQ for all items as shown in drawings and perspectives.