Professional Documents
Culture Documents
MODULE 3 PART IV
46. The hard, solid rock beneath surface material such as soil and gravel. It is a consolidated
rock, meaning it is solid and tightly bound.
a. Igneous rock
b. Sedimentary rock
c. Metamorphosed rock
d. Bedrock
47. Which of the following is the usual problem to consider in a flat slope site?
e. landslide
f. soil erosion
g. surface flooding
h. existing wildlife
48. Which of the following is not a problem to consider in a steep slope site?
i. landslide
j. soil erosion
k. surface flooding
l. existing wildlife
49. What is the optimum slope for a playground?
m. 1%
n. 2%
o. 3%
p. 4%
50. What is the optimum slope for a housing site?
a. 1%
b. 2%
c. 3%
d. 4%
51. It is a permeable geological stratum or formation that can both store and transit
groundwater in significant quantities.
a. Water table
b. Aquifer
c. Watershed
d. Wetlands
52. The knowledge of water boundaries is critical to the water quality and storm water
management since, it is also called as drainage basin. It is any area of land where
precipitation collects and drain off into a common outlet, such as into river, bay or other
body of water.
a. Water table
b. Aquifer
c. Watershed
d. Wetlands
53. When it comes to urban land use, I-1, I-2, I-3 are color coded in
a. Yellow
b. Red
c. Violet
d. Blue
54. When it comes to urban land use, TZ are color coded in
a. Aqua
b. Orange
c. Dark Green
d. Green
55. In a commercial development, what should be the priority in choosing a site?
a. Visibility
b. Lot size
c. Lot shape
d. density and zoning
56. Which of the following lot type is not ideal or least desirable for a public school?
a. Inside lot
b. Corner through lot
c. corner lot
d. through lot
57. Which of the following site location is least desirable for a high-end restaurant?
a. across a of a public school
b. beside a church
c. in a CBD
d. inside a casino establishment
58. This is important to determine the existing availability on site in terms of adequacy and
efficiency.
a. Utilities
b. Power supply
c. waste disposal
d. Wifi
59. When the site is located in Palawan and has a view of a beach what should be delimited?
a. outdoor dining
b. balcony
c. terrace
d. sunbuffles
60. When the site is located in Palawan and has a view of a beach what should be maximized?
a. view
b. population
c. marketability
d. buildable area