Date Lovkesh Kumar Shubham Jaiswal Battula Nikhil Reddy Suraj Karmakar Ramesh Sangur

(MS-Plane) (SM-Plane) (M-Plane) (SM-Plane)


01-Nov-2022 --> Studied of Performance Yang. --> M plane startup procedure KT with Read the PRD -->Understand 5G architecture Ramesh:
5G team. -> SW yang model
02-Nov-2022 --> Studied SW MGMT YANG --> Covered
--> M plane o-ran Documents.
the following topics and M-plane Architecture Model -->Understand M-plane -> Performance YANG model
Ramesh:
wrote test cases. Architecture Model -> Performance YANG model
03-Nov-2022 --> Studied SW MGMT YANG. 4.1 Test
--> O-RUcases
Interfaces
on ORAN m plane DHCP configuration -->Read the PRD ->o-ran-processing-element
Ramesh:
--> Worked on Schema. 4.2 Transceiver
documents chapter 3 and chapter 4 ->
-> HFCL FPGA team queries resolved
o-ran-processing-element test case
04-Nov-2022 --> Worked on SW MGMT YANG. 4.3
4.4 C/U Plane
O-RU
On leave VLAN IP
C/U Plane Configuration
Address DORA, Stateless and Stateful DHCP Learned about about RU.
completed.
Ramesh:
--> Write new TCs on the same. Assignment -->Ethernet encapsulation -> SW
-> SW yang
yang model
model test
TBD case
execution.
execution
07-Nov-2022 --> Worked on SW MGMT YANG. 4.5 Definition
--> Test cases onof processing elements
ORAN Startup m Netopeer installation and -->IP-UDP
Studied Encapsulation
about completed and results are updated in the
Ramesh:
--> Written new TCs on the same. plane documents chapter 3 and understanding the commands of -->eCPRI Version sheet.
-> Processing element TC's submitted to
08-Nov-2022 --> Deep studied of SW MGMT YANG. chapter
--> 4
Test cases on ORAN Startup m netopeer
Static andcli -->ecpri Reserved
Dynamic VLAN, Access Port -->Netopeer installation and ->
theSlot
HFCL
Ramesh: creation
QA. has done in the DPD char
--> Identified all possible test scenarios (+ve and - plane documents chapter 3 and and Trunk Port -->ecpri Concatenation
understanding the commands of board.
-> Operation yang model
-> O-ran-operation doc and
yang model test
test cases
-->ecpri -> Helped RF team for debugging demo
09-Nov-2022 ve).
--> New TCs of SW MGMT YANG to be written. chapter
--> Yang 4Models review related to 5G data frame structure LeaarnedMessage
netopeer cli
about cases
-> dev.
Review
Ramesh: of o-ran-processing element
-->ecpri RU.
--> Old ones to be modified. 4.6 O-DU Verification
Interfaces. i.e of C/U Plane -->LLS-C1Payload -> SW
with
-> yangQA's.
HFCL model
O-operation testqueries resolved fpr
case completed and
--> Unofficial
SW MGMTimage YANGflashed
to be finalized by board.
EOD. Transport Connectivity
--> Execution
Ietf-interfaces, -->ecpriRtcid/ecpriPcid
-->LLS-C2about HFCL
-> QA QA team.
syncup with HFCL.
sent to the HFCL team for review.
10-Nov-2022 --> in Proto-2 --> of ietf-interface yang Interface Testing Learned Ramesh:
4.6.1
--> Ethernet connectivity
ietf-hardware. -->Protocol
-->LLS-C3 Architecture(C,U -> O-ran-interface
Fault Management
--> Start working on Proto-2. model. -->VXT & ORAN Studio Player -> testdoc and
cases review.
and test case
monitoring procedure plane)
-->LLS-C4
11-Nov-2022 --> GUI Unit Testing completed. --> Execution of ietf-harware yang Ecpri protocol -->5G
-->DHCPdata frame structure
configuration verify with RU.
Ramesh:
4.6.2 IP connectivity monitoring ->
--> Started execution of SW Mgmt Yang TC on model. -->Learned Interface testing -> Discussion with dev
O-RAN Interface testteam
casesabout other
completed.
procedure yang model doubts.
12-Nov-2022 unofficial
--> Executedimage.
SW Mgmt Yang TC on unofficial --> Execution of m-plane-init yang Software Management Test cases, GUI Testing
-->Software Management Test
(Saturday) image. model cases ->M-plane yang model study and test
14-Nov-2022 --> Contd execution of SW Mgmt Yang TC on --> Software Management Test cases -->GUI Testing
-->Software Management Test cases.
Ramesh:
unofficial image. On Medical Emergency Leave cases -> M-Plane yang model
15-Nov-2022 --> Completed execution of SW Mgmt Yang TC on Shubham: Software Management Test cases -->Software Management ->Slot creation discussion with HFCL FPGA
Ramesh:
unofficial image. On Medical Emergency Leave completed team.
-> M-Plane yang model test case and
16-Nov-2022 -->
--> Started testingPerformance
Contd. testing PerformanceManagement
Management Shubham: Software Management completed -->Start performanve
--> performance management
management procedure
Ramesh: doc completed.
Yang.
Yang. On Medical Emergency Leave -->File management sent
-> for review.
o-ran-dhcp yang model test cases
17-Nov-2022 --> Completed
--> File Management
Software Yang TC Execution.
Management Yang. Shubham: Performance & File management -->File management Ramesh:
-->
--> Image
Found flashing
around 15in both
No. ofthe
bugsboards
in theofunofficial
QA. On Medical Emergency Leave ->
-> o-ran-dhcp
->DHCP relatedyang
o-ran-dhcp model
queries
yang study
and
test case andand test
doubts
--> Started
Troubleshoot theonissue case.
18-Nov-2022 release.
--> working Useroccurred
Managementwhen Yang.
try to Shubham: Performance & File management -->Performance & File discussion with
procedure
Ramesh: dev team.
doc completed.
get
--> output of
--> Executed
Worked onietf-hardware
M-Plane
File with
Conformance
Management theand
Yang help of SWa
docfound
and On Medical Emergency Leave management sent
-> for review.yang model test case and
o-ran-trace
Team. some TCs.
executed
bug. -> o-ran-trace
-> Discussion
procedure with
yangDurgesh and team and
model document
completed.
19-Nov-2022 --> Worked on User Management Yang. Performance & File management -->Performance & File
-->
--> Worked
--> Doubts
Workedand on
on M-Plane
Queries
M-Plane Conformance
of HFCL's
Conformance doc
doc and
QA team and about
test BMC PMIC related logs.
case.
(Saturday) --> Executed File Management Yang. management
executed
resolved.
executed some
some TCs.
TCs. -> o-ran-troubleshoot yang model test
21-Nov-2022 --> Worked
--> Worked on on User
M-Plane Conformance
Management Yangdoc and
Module. Shubham: File management -->File management Ramesh:
-->
--> Result
executed
Verifiedofeach
someMPlane
and Conformance
TCs. shared toin
every rule mentioned On Medical Emergency Leave cases and doc.
-> o-ran-supervision yang model test
HFCL.
-->
22-Nov-2022 --> Image
acm yang.flashing
Creation KT to HFCL.
and Updation TC doc of Trace and Shubham: File management -->Trace yang cases.
Ramesh:
-->
--> Doubts
--> Doubts
Found thatandrules
and Queries
Queries of HFCL's
of
against HFCL's
10 yangQAmodules
QA team
team -> o-ran-ald-yang
o-ran-ald-yang model
model document
document and
Troubleshoot Yang. On Medical Emergency Leave -->Troubleshooting yang ->
resolved.
resolved.
have not been defined. test cases.
23-Nov-2022 --> Execution of Trace and Troubleshoot
--> Creation and Updation TC doc of Trace Yang.
and Shubham: Trace and troubleshooting yang -->Trace yang Ramesh:
-->
--> Executed
Troubleshoot read
Yang.operations
M-Plane Conformance on to all 4 user group
'Logs'. On Medical Emergency Leave -->Troubleshooting yang ->
-> o-ran-troubleshoot
-> o-ran-sync yang
o-ran-ald-port yang
model
yang model
document
model testas
test cases
and
--> found some
--> Doubts
Execution and bugs.and
ofQueries
Trace of HFCL's QA team and
Troubleshooting Yang cases.
per o-ran std.
complete with test procedures.
24-Nov-2022 --> Started working on O-RAN-INTERFACES Shubham: Trace and troubleshooting yang -->Trace yang Ramesh:
--> Start executing Trace & Troubleshoot Test
resolved.
TCs.
IETF-INTERFACES. On Medical Emergency Leave -->Troubleshooting yang -> Understand of o -ran-delay
Scenerios
--> Creation and found
and 5-6 bugs.
Updation TCindoc of Supervision ->o-ran-ald-yang
-> model
o-ran-delayschema
yang test
model cases.
document
25-Nov-2022 -->
--> 2 bugs reported.
Started writing/updation TCQAdoc of both the Shubham: summarized Trace and -->Trace yang management
Ramesh: and oran std for
--> Doubts
Yang. and Queries of HFCL's team details and discussion
yang modules.
resolved. On Medical Emergency Leave troubleshooting yang test cases to -->Troubleshooting yang test
-> o-ran-delay management testteam
case development. with dev caseson
-->
--> Execution of Supervision
All 52-53 bugs have beenYang.explained to SW HFCI team with HFCL QA team it.
and procedure.
-->
TeamM-Plane
to fix. Conformance TC execution for 'Logs' -> Board image flash details explained to
andWorked
--> 'Supervision'.
with SW Team and done some unit -> Few
the HFCLmore
FPGA
->o-ran-module test cases
team.
cap added for
document ando-ran-
--> Doubts and Queries of HFCL's QA team
testing. ald yang model.
details.
resolved.
--> Email sent to Customer having Conformance
results alongwith TC document (with results) of
Date Lovkesh Kumar Shubham Jaiswal Battula Nikhil Reddy Suraj Karmakar Ramesh Sangur
(MS-Plane) (SM-Plane) (M-Plane) (SM-Plane)
26-Nov-2022 --> Worked on IETF-HARDWARE, O-RAN- Shubham: Supervision yang -->Supervision yang
(Saturday) HARDWARE and IETF-INTERFACES. On Medical Emergency Leave
28-Nov-2022 --> Image Build 2.0.0 Supervision yang test cases execution -->software and file management Ramesh:
--> Image Build 2.0.1 -->Working on image 2.0. (2.0.0) - o-ran-transceiver yang model
29-Nov-2022 --> Installation
--> PartitioningofeMMC
cleanand
buildinstallation of clean
2.0.0 '2021'. --> bug validation of M-plane
Shubham: understanding the working of vlan -->understanding the working of document.
Ramesh:
image build. of clean build 2.0.0 '2022'.
--> Installation -->
-->2Bug
Bugvalidation of Yang modules
on ietf hardware yang scanning on the interface vlan scanning on the interface - o-ran-transceiver yang model test case
30-Nov-2022 -->
--> BMC
--> Done Flashing
Installation of using
clean debugger
Bug validations. build 2.0.0and theninUART.
'2021' both ---> Ietf
Shubham: hardware 22 cases execution vlan scanning working ---> Working on vlan -Ramesh:
DPD char board booting issues
writing.
-->
--> Started
the slots ofBug
Validated validations.
around
Proto-1 15 bugs.
Board No.5. with2 result
--> and xmlsIetf interface
bugs reported -->Flashed with old image
o-ran-transceiver yangdebug
model test case
-->
--> Validated
Done Bug 3around
--> Reported bugs on10JIRA.
validations. bugs. working on VLAN - Explained about 8T8R RU to CP project
completed with test procedure.
1-Dec-2022 --> Validated around 20 bugs of GUI. Shubham: vlan scanning execution. ---> Working on vlan Ramesh:
-->
--> Reported
Validated 5 bugs on
around JIRA. VVDN's
--> Reported 08 bugs20onbugs.
JIRA. --> multiple
Bug Raised :netconf session execution -> Board has flashed with image 2.0.0
--> Reported
--> RFSoC Image 1.0.2on
11 bugs flashing
JIRA. into the board. ---> M plane init yang models ->ietf-netconf-acm
2-Dec-2022 --> Writing some undefined TCs of Trace and HFCI8T8R-1008
HFCI8T8R-1011 software management (2.0.0), ON LEAVE -> ietf-netconf-acmdocument
Ramesh: test cases and
Troubleshooting Yang. execution started
HFCI8T8R-1009
HFCI8T8R-1012 Working of DHCP schema.
->Yang model test.
-> o-ran-dhcp yang model test in proto 1
--> Shubham:
3-Dec-2022 --> Finalized
Bugs raisedTrace, Troubleshoot and Supervision
on JIRA. HFCI8T8R-1013
Bug reported on ietf hardware get filter of all yang module and vlan -->Get filter of all yang module and HFCL board.
Yang. HFCI8T8R-985
-->
--> Worked
Worked on on mplane init yang
VLAN scanning test. -> Results are unknown debugging call
(Saturday) HFCI8T8R-1010 scanning -->vlan scanning
HFCI8T8R-986
modle.
-->Performance management bugs with Bulkesh.
5-Dec-2022 --> Completed Trace and Troubleshooting Yang. 4 bugs reported
HFCI8T8R-998 over jira on ietf Working of M-Plane on VLAN -->Working of M-Plane on VLAN On leave
--> TCs updated. finding.
interfaces. -> Results shared through emaii.
--> Completed
Bugs reported on JIRA and Supervision Yang. --> Callhome testing.
6-Dec-2022 --> Operations 3 bugs reported of performance IETF-INTERFACES test cases -->IETF-INTERFACES test cases Ramesh:
--> TCs updated. managemnet and ietf interfcaes -> ietf-netconf-acm test cases &
7-Dec-2022 -->
--> Bugs reported
Completed SWon JIRAand File Mgmt Yang.
Mgmt 1 bug on m plane init o-ran transceiver test cases -->M-plane-int test cases procedure
Ramesh: continued.
--> TCs
--> Report shared to HFCL.
updated. ->o-ran-interface
-> yang
ietf-netconf -acm model
test casestest.
8-Dec-2022 --> Completed
--> Bugs reported onMgmt
User JIRA Yang. 1 bug on s plane yang model. User management test cases -->O_RAN DHCP -> Testing ietf-netconf-acm yang in
completed.
Ramesh:
-->
--> Report shared to HFCL.
TCs updated. proto1
->Worked board.
on o-ran-harware yang
9-Dec-2022 --> Bugs reported
Planned Leave on JIRA --> 1 bug on DHCP. User management test cases and -->O-RAN DHCP document.
Ramesh:
--> Report shared to HFCL. --> Fault Mangement. bugs reported on JIRA -->Fault mangement ->
-> Started
Workedwriting
on test test cases.
cases of o-ran
10-Dec-2022 --> Worked on TC document. 1 bug on fault management Wrote test cases of O-RAN DHCP -->Fault management hardware yang model.
(Saturday) --> Bugs description updated on JIRA. --> TC summary completion. -> hardware std Document ref .
12-Dec-2022 --> TC summary completed. -->bugs
2 Discussion
on faultcall with customer.
management Test cases on O-RAN DHCP, Fault -->Fault management Ramesh:
--> Discussion call with customer. -->
--> JIRA ID updation
TC summary against all given
completion. mangement -->Processing element -> o-ran-hardware yang model test cases
13-Dec-2022 --> Written
--> JIRA ID updated against
TCs on Fault all given yang
Management Yang yang
module Bug
--> module
Discussion
raised TCs.
call with customer.
in FM updated Fault management test -->Write O-RAN SYNC test cases completed
Ramesh:
TCs. --> JIRA ID updation against all given cases and update another test cases ->o-ran-sync
-> document
o-ran-transceiver yangand schema.
model
14-Dec-2022 -->
--> Data shared
M plane to HFCL over
conformance JIRA ID 1035.
testing. yang module
M plane TCs.
conformance testing Fault management, Processing -->Update test cases, test steps, document
Ramesh: and o-ran std.
--> Contd writing FM Yang. element jira id, input, output -> o-ran-transceiver yang model test
15-Dec-2022 --> FM Yang TCs execution. - Bugs over Conformance Fault management sdd -->O-ran fm test case update cases writing with procedure.
Ramesh:
- M-plane conformance ->
-> HFCL QA's on call yang
o-ran-transceiver JIRA tickets
model doubts
test
16-Dec-2022 --> Overall 250 bugs validation and disposal. -M-plane-conformanace proto 1 BMC testing -->Update description and steps resolved.
cases completed
Ramesh: with procedure and
--> M-Plane conformance with Shubham and QA internal 2.0.0 on jira id's details.
-> U plane configuration schema and o-
17- Dec-2022 Yash.
--> Started writing BMC TCs for new features. -S-plane-conformance QA internal LEAVE and
-->Update description and steps ran std document ref for test cases.
(Saturday) 2.0.0 -->M
on jiraplane
id's conf. -> o-ran-uplane-conf test cases
19-Dec-2022 --> BMC TCs document completed. Image Flashing on proto 1 board. Understanding M-Plane conformance -->M plane conf on new image Ramesh:
QA v2.0.1 test cases -->Basic testing on new image -> U-plane test cases as per schema and
20-Dec-2022 --> BMC TCs document completed. --> M-Plane Conformance testing and BMC test cases execution. -->Support for M-plane conf. o-ran std.
Ramesh:
--> Support for M-Plane Conformance Testing. execution. -->Support for S-plane conf. -> U-plane
-> JIRA tickets
teststatus
cases checked reported
as per schema andby
--> S-Plane conformance test cases me.
--> Board flashing using JTAG 2-3 times. o-ran std.
Date Lovkesh Kumar Shubham Jaiswal Battula Nikhil Reddy Suraj Karmakar Ramesh Sangur
(MS-Plane) (SM-Plane) (M-Plane) (SM-Plane)
21-Dec-2022 --> BMC TCs bugs reporting on JIRA. --> M Plane Conformance test BMC test cases and bugs reporting -->Worked on M-Plane Ramesh:
--> Support for M-Plane Conformance Testing. execution. on JIRA. Conformance and -> U-plane test cases continued as per
--> M-Plane conformance Completed -->worked on Jira
22-Dec-2022 --> BMC
--> M-Plane Conformance
TC doc completed.Completed --> S-palne Comformance test cases BMCSupport
testfor M-Plane
cases Conformance.
reported on JIRA and ON LEAVE leaf and configuration.
Ramesh:
--> Labeling
--> Board flashing
on all using JTAG 5-7 times.
JIRA tickets. execution. Labels created for all Bugs. -> U-plane test cases
--> Long run S plane conformance test
23-Dec-2022 --> Label
--> S-Plane Conformance
and Componentremaining cases
updation in JIRAto be
tickets. --> Execution of Sync Yang model S-Plane testing --> Worked on S-plane testing -> JIRA tickets lebel update as per sheet
Ramesh:
case execution.
executed. --> Long run S Plane Conformance ->
-> Out
JIRA of 96 tickets
tickets label 54
andhas updated.
component
--> Labeling on all JIRA tickets.
24-Dec-2022 --> Long run S plane conformance S-plane long Run -->S plane long Run update completed.
test. and -> U-plane carrier-element understanding
26-Dec-2022 --> Bugs updation on JIRA --> Extended
---> Bugs oversupport to software
jira is being sorted out RM review and studying ITU-T G. -->Worked
-->RM on M plane with
Review and test cases are written. u-plane yang
-> normal-vector-direction
team
all the labels are organised. 8273.2 document. software team
and model test cases are written.
27-Dec-2022 --> Bugs updation on JIRA to
-->solve
Bugs the bug. on Jira
Updated studying ITU-T G.8273.2 document. --> Studying
--> Studying about
about CU
CU plane
Plane -> Shipment
->u-plane interface and
(parameter validation sheet
polarisations)
created.
Test cases.
28-Dec-2022 --> Customer's Bugs updation on JIRA --> Study on ACLR CU plane studying ITU-T G.8273.2 document. --> Studying about CU plane -> u-plane(grouping
->u-plane documentarray-choice)
--> How to calculate ACLR Test cases.
29-Dec-2022 --> Yang TCs doc updation. --> Study on CU plane Studying o-ran-sync yang module --> Studying about S plane ->u-plane (scs- config , frame structure)
doc and test cases.
30-Dec-2022 --> UAT doc updation Leave Studying o-ran-sync yang module --> Studying about CU plane -> u-plane schema and doc study and test
cases continued (85+)
2-Jan-2023 --> Studied M-Plane Conformance --> Learning the encapulation of CU studying ITU-T G.8273.2 document. studying ITU-T G.8273.2 ->u-plane rx-common-array-carrier-
plane traffic document. elements
3-Jan-2023 --> Studied M-Plane Conformance --> Learning the encapulation of CU studying ITU-T G.8273.2 document. studying ITU-T G.8273.2 grouping test
->u-plane cases.
tx-array parameter and list of
plane traffic document. capability test cases
4-Jan-2023 --> Single frequency & Single BW RCT --> Single frequency & Single BW RCT --> Single frequency & Single BW RCT --> Single frequency & Single BW ->u-plane rx-array parameter and
---> Learning the process of RCT. RCT capability test cases.
5-Jan-2023 --> Single frequency & Single BW RCT --> Single frequency & Single BW RCT --> Single frequency & Single BW RCT --> Single frequency & Single BW -> u-plane endpoint-section-capacity and
RCT process element test cases.
6-Jan-2023 --> Single frequency & Single BW RCT --> Single frequency & Single BW RCT On Leave --> Single frequency & Single BW ->u-plane configuration group test cases
RCT and schema
9-Jan-2023 --> Single frequency & Single BW RCT --> Single frequency & Single BW RCT --> Single frequency & Single BW RCT --> Single frequency & Single BW ->u-plane en-poing lists (low-level rx and
RCT low-level-tx)
10-Jan-2023 --> Internal Bug Validation started --> Internal Bug Validation started --> Internal Bug Validation started --> Internal Bug Validation started ->u-plane list ul-fft-sampling-offsets and
--> M-Plane Conformance started --> M-Plane Conformance started --> M-Plane Conformance started --> M-Plane Conformance started list tx-array-carriers understanding and
11-Jan-2023 --> Internal Bug Validation Contd. --> Internal Bug Validation Contd. --> Internal Bug Validation Contd. --> Internal Bug Validation Contd. test cases.
->list low-level-rx-endpoints u plane
--> M-Plane Conformance Contd. --> M-Plane Conformance Contd. --> M-Plane Conformance Contd. --> M-Plane Conformance Contd. understanding and test cases
12-Jan-2023 --> Internal Bug Validation Completion --> Bugs Updated on Jira --> Internal Bug Validation ---> Bug Validation ->u-plane list prb-capacity-allocation-
---> Bug Validation Completion granularity test cases.
13-Jan-2023 On Optional Leave S-Plane Conformance --> working on CU plane S-Plane Conformance ->list endpoint-capacity-sharing-groups
each leaf test cases
16-Jan-2023 S-Plane Conformance S-Plane Conformance --> working on CU plane S-Plane Conformance -> list static-low-level-rx-endpoints
groups test cases and doc ref.
17-Jan-2023 --> MS plane conformance report submission to --> MS Plane Conformance report --> working on CU plane reports --> Work on all Bugs on Jira ->list of low -level rx end points
HFCL. submission --> Yang Module Validation list of low-level-tx-endpoints test cases
--> Yang Model Validation
Date Lovkesh Kumar Shubham Jaiswal Battula Nikhil Reddy Suraj Karmakar Ramesh Sangur
(MS-Plane) (SM-Plane) (M-Plane) (SM-Plane)
18-Jan-2023 -->Bug validation of bugs raised by Ramesh and --> CU Plane activities --> working on CU plane reports --> Work on all Bugs on Jira -:lte - tdd frame laa-carrier-configuration
Customer. --> Leakage test --> Yang Module Validation test case with doc ref.
19-Jan-2023 -->Closure of 149 Bugs valiation. --> CU plane test report preparation --> File management, BMC test cases. -->CU plane leakage test report - list of rx-array-carriers and rx-common-
-->Report submission to HFCL. --> Closure of bug validation --> Closure of bug validation array-carrier-elements test case
20-Jan-2023 -->Debugging of Unit-1 ---> Baisc RCT on unit 7 --> File management, BMC test cases. -->Debugging of Unit-1 document
-list rx-arrays and tx-array-notification-
group test cases completed.
23-Jan-2023 --> M-Plane bug validation. --> hardware and interface yang --> Supervision, Usermgmt testcases. --> M-Plane bug validation. On leave
model testing
24-Jan-2023 --> M-Plane bug validation. --> dhcp, m plane init yang modle --> Supervision, Usermgmt testcases. Yang module validation On leave
testing
25-Jan-2023 --> M-Plane bug validation. --> Processing element, transeiver --> Operations, Software Yang module validation
yang modle testing management test cases.
27-Jan-2023 On Leave --> Sync yang model testing. --> Operations, Software Yang module validation
management test cases.
30-Jan-2023 -->Studied O-RAN-Performance Yang ---> yang model test cases updates -->Studied O-RAN-Performance
are in progress. Working on CU PLANE Yang
31-Jan-2023 -->Flashing Unit-1. --> Working on functional test cases. -->
-->Test rest of the cases of sync
yang model
Flashing the board and working on CU PLANE
1-Feb-2023 -->Worked on UAT --> Sync yang model testing Data validation in CU PLANE --> Work on Sync yang module
---> UAT updates discussion
2-Feb-2023 -->Long run test of S-Plane Conformance --> S plane Conformance testing Data validation in CU PLANE --> S plane Conformance testing

3-Feb-2023 -->Execution of O-RAN-FM. ---> Executed O-RAN fm yang model Reports of CU PLANE(unit specific) -->Long Run S plane testing
-->Studied of O-RAN-PM. ---> Long Run S plane testing -->Fault Management
-->Discussion with 5g team for Functional TCs.
6-Feb-2023 --> Worked in M-Plane Functional TC doc. ---> Long run S plane testing Made a report of bugs of CU PLANE ---> Long run S plane testing
---> Report for S plane long run
testing.
7-Feb-2023 -->Shared M-Plane bug list with HFCL. --> Consolidating Yang model testing CU PLANE Reports --> Fault Management Yang Model
--->
-->Reviewing o-ran-pm yang. report testing.
--> Fault Management Yang Model
8-Feb-2023 -->Worked on JIRA ---> Test cases addition on drive and CU PLANE Reports --> Fault Management Yang Model
testing.
-->Prepared detailed report of Unit 1,4,7 on m- docs preparation testing.
plane -->Prepared detailed report of Unit
9-Feb-2023 -->Worked on JIRA ---> M-Plane Functional test cases Worked on BMC test cases ----> M plane functional UAT test
1,4,7 on m-plane
-->Isolated bugs which have not validated execution according to UAT case execution
(Customer's and VVDN-QA's
10-Feb-2023 -->Worked on Kernel Panic ----> S plane functional test case Worked on BMC test cases ----> S plane functional UAT test
execution according to UAT case execution
13-Feb-2023 -->Consecutive Reboot on Unit No.1 -->SM Plane sanity done on UNIT 8. ON LEAVE --> Continious Reboot on Unit No.1
--> MS-plane Sanity
14-Feb-2023 -->Consecutive Reboot on Unit No.7 & 3 On Leave ON LEAVE --> Continious Reboot on Unit No.3
-->Bugs report shared to Joseph and 7
-->Kernel Panic report submitted. -->Summry report of Yang feature
15-Feb-2023 -->M-Plane Functional TC execution started. -->M-Plane Functional TC execution ON LEAVE --> Unit testing on 2.0.3 with sw
-->Unit Testing on 2.0.3 with dev team. started. team.
-->Customer's bug closure. --> Bug Closure of 2.0.2
16-Feb-2023 --> Booting and flashing debugging 2.0.3 --> Booting and flashing debugging ON LEAVE
2.0.3
Date Lovkesh Kumar Shubham Jaiswal Battula Nikhil Reddy Suraj Karmakar Ramesh Sangur
(MS-Plane) (SM-Plane) (M-Plane) (SM-Plane)
17-Feb-2023 --> Booting and flashing debugging 2.0.3 --> Booting and flashing debugging ON LEAVE ON SICK LEAVE
---> Bug Validation of 2.0.3 2.0.3
---> Bug Validation of 2.0.3
18-Feb-2023 ---> Bug Validation of 2.0.3 ---> Bug Validation on 2.0.3
(Saturday)
20-Feb-2023 ON LEAVE ---> M Plane Conformance testing on ON LEAVE ON LEAVE
V2.0.3
21-Feb-2023 ON LEAVE --> Flashing UNIT 7 with 3.0.3 ---> M Plane Conformance testing on ON LEAVE
--> Bug Validation of 3.0.0 and report.
V3.0.0
--> Conformance report on V3.0.0
22-Feb-2023 M-Plane Conformance ---> M Plane Conformance testing on ---> M Plane Conformance testing on ON LEAVE
V3.0.0 V3.0.0
---> Bug fixed report for V.3.0.0 --> Conformance report on V3.0.0
23-Feb-2023 M-Plane Conformance ---> M Plane Conformance testing on ---> M Plane Functional testing on V3. ON LEAVE
V3.0.0 0.0
--> Conformance report on V3.0.0 --> Conformance report on V3.0.0
24-Feb-2023 S-Plane Conformance S-Plane Conformance testing on V30. Reboot Testing of board ON LEAVE
3
25-Feb-2023 ---> M Plane Functional testing on V3.
0.0
--> Conformance report on V3.0.0
27-Feb-2023 M-Plane Functional M plane Functional testing completed M plane Functional testing completed ON LEAVE
UNIT-
for v3.0.0 for v3.0.0
28-Feb-2023 S-Plane Conformance Reboot Testing of board

1-Mar-2023 M-Plane Conformance Unit-16 started M-Plane Conformance Unit-16 started

2-Mar-2023 T-TSC Long Run Started M-Plane Conformance on Unit-16

3-Mar-2023 T-TSC Long Run Continued Bug validation in unit-16

6-Mar-2023 T-TSC Long Run Completed M-Plane Conformance on Unit-16


Report submitted
Demo planned with RadiSys
7-Mar-2023 M-Plane Conformance on Unit-16 completed M-Plane Conformance on Unit-16
completed
9-Mar-2023 M-Plane Conformance on Unit-17 started M-Plane Conformance on Unit-17
started
10-Mar-2023 M-Plane Conformance on Unit-17
completed