PROJECT REPORT

Project: Al farjaan Market Market: 1

SHOP PIPING CABLE


NUMBER 2 TONNES
IN Nos G1 G2 M1 G1 G2 M1
1 3      
2 3      
3 3     
4 3    
5 3      
6 3      
7 3      
8 3    
9 3      
10 3      
11 3      

1.5
ROOM NO TONNES PIPING CABLE
IN No’s G1 G1
Pump  
Room 1
Electrical  
Room 1
Security  
Room 1
Total 3

Remark:

 Shop 3 ground floor pipe line sleeve concrete blocked.


 Shop 4 ground floor pipe line sleeve concrete blocked.
 Shop 8 first floor pipe line sleeve concrete blocked.
 1.5 ton AC security room pipe line sleeve concrete blocked.

Note:-

 Shop-3 two units Copper pipes pinched.


 Shop-2 one unit Copper pipes pinched.
 Shop-8 one unit Copper pipe line, cable& insulation removed.