Professional Documents
Culture Documents
4-Feb-18 RBB-p5 1X70 Sqmm Y/G earthing cable pulling and laying mtr 600.00 DONE mtr 600.00
5 W 4-Feb-18 RBB-p5 2003750 Santosh Kumar Electrical 3 1X25 Sqmm Y/G earthing cable pulling and laying mtr 100.00 DONE mtr 100.00 Note: 1 Ton pickup used for site crew.
4-Feb-18 RBB-p5 50X70 C clamp fixing nos 44.00 DONE nos 44.00
6 N-W 5-Feb-18
6-Feb-18 RBB-p5 2PX1.3 Sqmm instrument cable puling and laying mtr 656.00 DONE mtr 656.00
7 W 2003750 Santosh Kumar Instrument 4 Note: 1 Ton pickup used for site crew.
6-Feb-18 RBB-p5 10PX1.3 Sqmm cable puling and laying mtr 161.00 DONE mtr 161.00
7-Feb-18 RBB-p5 2X2X1.3 Sqmm instrument cable puling and laying mtr 1,310.00 DONE mtr 1,310.00
7-Feb-18 RBB-p5 2CX 2.5 Sqmm power cable puling and laying mtr 572.00 DONE mtr 572.00
8 W 2003718 Mohammad Rashid Instrument 7
7-Feb-18 RBB-p5 10PX1.3 Sqmm cable puling and laying mtr 161.00 DONE mtr 161.00
7-Feb-18 RBB-p5 20PX1.3 Sqmm cable puling and laying mtr 140.00 DONE mtr 140.00
8-Feb-18 RBB-p5 2X2X1.3 Sqmm instrument cable puling and laying mtr 286.00 DONE mtr 286.00
8-Feb-18 RBB-p5 3CX4 Sqmm power cable puling and laying mtr 759.00 DONE mtr 759.00
2003750 Santosh Kumar Electrical
9 W 8-Feb-18 RBB-p5 7 3CX2.5 Sqmm cable puling and laying mtr 588.00 DONE mtr 588.00 Cable pulling laying, dressing and Tagging
2003718 Mohammad Rashid Instrument
8-Feb-18 RBB-p5 4CX4 Sqmm cable puling and laying mtr 247.00 DONE mtr 247.00
8-Feb-18 RBB-p5 1CX70 Sqmm cable puling and laying mtr 122.00 DONE mtr 122.00
9-Feb-18 RBB-p5 Cable dressing and Tagging DONE
2003750 Santosh Kumar Electrical
10 W 9-Feb-18 RBB-p5 7 1X25 Sqmm Y/G earthing cable pulling and laying mtr 50.00 DONE mtr 50.00
2003718 Mohammad Rashid Instrument
9-Feb-18 RBB-p5 50X70 C clamp fixing nos 10.00 DONE nos 10.00
10-Feb-18 RBB-p5 1X70 Sqmm Y/G earthing cable pulling and laying mtr 40.00 DONE mtr 40.00
10-Feb-18 RBB-p5 1X25 Sqmm Y/G cable layed mtr 50.00 DONE mtr 50.00
2003750 Santosh Kumar Electrical
11 W 10-Feb-18 RBB-p5 7 50X70 C clamp fixing nos 8.00 DONE nos 8.00
2003718 Mohammad Rashid Instrument
10-Feb-18 RBB-p5 2X2X1.3 Sqmm instrument cable puling and laying mtr 588.00 DONE mtr 588.00
10-Feb-18 RBB-p5 Cable trays for tubing work shifted at site nos 45.00 DONE nos 45.00
11-Feb-18 RBB-p5 F&G Break Glass Unit BGU Instrument Support Installation nos 5.00 DONE nos 5.00
2003750 Santosh Kumar Electrical
12 W 11-Feb-18 RBB-p5 7 BGU instrument inatallation and cable glanding nos 5.00 DONE nos 5.00
2003718 Mohammad Rashid Instrument
11-Feb-18 RBB-p5 F&G Break Glass Unit BGU JB Support Installation nos 1.00 DONE nos 1.00
13 N-W 12-Feb-18 Driver's Strike
14 N-W 13-Feb-18 Driver's Strike
14-Feb-18 RBB-p5 F&G Break Glass Unit BGU Instrument Support Installation nos 1.00 DONE nos 1.00
15 W 2003718 Mohammad Rashid Instrument 4
Majan Technical Supplies & SULTANATE OF OMAN
Services LLC RABAB HARWEEL INTEGRATED PROJECT-OFF PLOT (C311394)
DAILY ACTIVITY LOG SHEET
JOB STARTING DATE: Wednesday, January 31, 2018 TOTAL WORKING DAYS (W) 26 DAYS
CURRENT DATE: Sunday, March 12, 2023 TOTAL NON-WORKING DAYS (N-W) 6 DAYS
WELL HEAD No. OF BOQ
SR. # DATE PTW No. PERMIT HOLDER DISCIPLINE COMPLETED TASK DESCRIPTION UNIT QTY OF JOB COMPLETED UNIT REMARKS
# MANPOWER ITEM#
15 W 2003718 Mohammad Rashid Instrument 4
14-Feb-18 RBB-p5 BGU instrument inatallation and cable glanding nos 1.00 DONE nos 1.00
15-Feb-18 RBB-p5 300X50 mm cable tray installation mtr 33.00 DONE mtr 33.00
16 W 2003718 Mohammad Rashid Instrument 4
15-Feb-18 RBB-p5 QZA Intrument support installation nos 1.00 DONE nos 1.00
17 N-W 16-Feb-18
18 W 17-Feb-18 SAK-p9 4099257 Santosh Kumar Electrical 4 300X50 mm cable tray installation mtr 78.00 DONE mtr 78.00
Instrument
19 W 18-Feb-18 SAK-p9 2003720 Mohammad Rashid 4 E & I cable drum loading and unloading and meggering done no lump DONE no lump
Electrical
19-Feb-18 SAK-p9 2X2X1.3 Sqmm instrument cable puling and laying mtr 956.00 mtr 956.00
20 W 2003720 Mohammad Rashid Instrument 4 DONE
19-Feb-18 SAK-p9 Cable drum meggring and continuity done no lump no lump
20-Feb-18 SAK-p9 1/2" SS tube bending done with end offset of 45 degree no 20.00 DONE no 20.00
21 W 2003720 Mohammad Rashid Instrument 7
20-Feb-18 SAK-p9 2CX 2.5 Sqmm power cable puling and laying mtr 1,085.00 DONE no 1,085.00
21-Feb-18 SAK-p9 3CX4 Sqmm power cable puling and laying mtr 791.00 DONE mtr 791.00
21-Feb-18 SAK-p9 3CX2.5 Sqmm cable puling and laying mtr 566.00 DONE mtr 566.00
21-Feb-18 SAK-p9 4CX4 Sqmm cable puling and laying mtr 337.00 DONE mtr 337.00
22 W 4099257 Santosh Kumar Electrical 7
21-Feb-18 SAK-p9 1CX70 Sqmm cable puling and laying mtr 145.00 DONE mtr 145.00
21-Feb-18 SAK-p9 20Px 0.8 Sqmm instrument cable puling and laying mtr 135.00 DONE mtr 135.00
21-Feb-18 SAK-p9 2Px 1.13Sqmm instrument cable puling and laying mtr 135.00 DONE mtr 135.00
2003720 Mohammad Rashid
23 W 22-Feb-18 SAK-p9 Instrument 4 1/2" SS tube bending done with end offset of 45 degree no 50.00 DONE no 50.00
4099257 Santosh Kumar
23-Feb-18 SAK-p9 1X25Sqmm Y/G cable puling and laying mtr 50.00 DONE mtr 50.00
23-Feb-18 SAK-p9 2PX1.13 Sqmm cable puling and laying mtr 166.00 DONE mtr 166.00
24 W 4099257 Santosh Kumar Electrical 4
23-Feb-18 SAK-p9 50X35 C Clamp Installation no 10.00 DONE no 10.00
23-Feb-18 SAK-p9 1CX70 Sqmm cable puling and laying mtr 23.00 DONE mtr 23.00
24-Feb-18 SAK-p9 1- Work front was not ready from ATE side.
3X4Sqmm LV cable pulling and laying mtr 116.00 DONE mtr 116.00 ATE agreed to provide Hiab and Crane for lifting cable drum
24-Feb-18 SAK-p9 from Shakiya P6 but they could not provide this upto lunch
4X4 Sqmm cable puling and laying mtr 40.00 DONE mtr 40.00
break.
25 W 24-Feb-18 SAK-p9 2004150 Santosh Kumar Electrical 8 3X2.5Sqmm cable pulling and laying mtr 160.00 DONE mtr 160.00
2- After the lunch break, crane came to shakiya p9 and ATE
24-Feb-18 SAK-p9 70X70 C Clamp Installation no 9.00 DONE no 9.00 used this for E&I panels installation.
24-Feb-18 SAK-p9 Lead strap making done for cable tagging at work shop no lump DONE no lump
25-Feb-18 SAK-p9 Electrical Gland plate hole fabrication no 14.00 DONE no 14.00
25-Feb-18 SAK-p9 Electrical Cable pulling and Glanding no 10.00 DONE no 10.00
26 W 25-Feb-18 SAK-p9 2004150 Santosh Kumar Electrical 8 2X10 Sqmm cable puling and laying mtr 25.00 DONE mtr 25.00
25-Feb-18 SAK-p9 Instruments Gland plate hole fabrication no 32.00 DONE no 32.00
25-Feb-18 SAK-p9 Instrument Cable pulling and Glanding no 12.00 DONE no 12.00
Site issue: Instrument cable glanding and gland hole
26-Feb-18 SAK-p9
1x25Sqmm Y/G cable puling and laying mtr 100.00 DONE mtr 100.00 fabrication done at FCS panel but during inspection with PDO,
QC engineer instructed to make the trench more clear which is
26-Feb-18 SAK-p9
1x70Sqmm Y/G cable puling and laying mtr 33.00 DONE mtr 33.00 very near to the panels for better instrument cable looping.
26-Feb-18 SAK-p9 We re-pulled the cable from the conduits and made the trench
27 W 2004150 Santosh Kumar Electrical 7 Cable glanding for UDB panel no 3.00 DONE no 3.00
ready for civil works. Tomorrow after civil work, we will start
26-Feb-18 SAK-p9 glanding for instrument cables which are to be terminated at
Glan hole fabrication for instrument FCS panel no 15.00 DONE no 15.00
FCS panel.
Seggeregation for instruments cable and tags marking
26-Feb-18 SAK-p9
no 15.00 DONE no 15.00
Site issue: ATE Provided Crane and Trailer after the lunch.
27-Feb-18 SAK-p9 4X240 Sqmm cable puling and laying. no DONE
2- Trench clearance done by ATE for instrument cable's
proper looping.
27-Feb-18 SAK-p9 3X185 Sqmm cable puling and laying. no 130.00 DONE no 15.00
28-Feb-18 SAK-p9 4CX35Sqmm cable puling and laying mtr 216.00 DONE mtr 216.00 Meeting: ATE & MTSS for site related issues
29 w 2004150 Santosh Kumar 7
28-Feb-18 SAK-p9 LV panel earthing wire looping and dressing no lump DONE no lump
SAK-p9 INST. 1- Instrument cable meggering and glanding at FCS/IPS Panel Meggering tools
Gland hole fabrication, cable glanding at UDB 4mm earth sleaves, 6mm Y/G wire, 6X4 ring E & I panel installation is pending
Wednesday, February 28, 2018 1-E & I panel installation is pending typr lugs, 4mm brass nut bolts. This activity shall be done after panel installation.
This activity shall be done after panel installation.
RBB-p5 ELEC. 2- Lighting JB earth busbar lug support is pending.
3- Filed skid electrical installation (Mechanical clearance required)
4- LV cable looping trench required (Panel side)
RBB-p5 INST.
Cable glanding at FCS panel, BGU Support Foundation, compaction and Back
SAK-p9 INST. filling
RBB-p5 INST.
SAK-p9 ELEC.
SAK-p9 INST.
Friday, March 2, 2018
RBB-p5 ELEC.
RBB-p5 INST.
Electrical Welding crew required for supporting
1- Heat tracing DB installation is pending. lighting JB earthing bus bar is missing.
2- Thyristor control panel installation for heater is pending.
SAK-p9 ELEC. 3- Heat tracing DB installation is pending
4- Earthing trench is not ready at transformer side.
5- LV cable loop trench is pending (Panel side)
RBB-p5 ELEC.
RBB-p5 INST.
Sunday, March 4, 2018 Cable dressing, and termination. Ferruling tube required
Gland earthing to be done. Screen sleaves 1.5sqmm required
SAK-p9 INST. F&G instruments support is not ready.
RBB-p5 ELEC.
RBB-p5 INST.
SAK-p9 ELEC.
1- Cable dressing, and termination. Ferruling tube required
2- Gland earthing to be done. Screen sleaves 1.5sqmm required
SAK-p9 INST. 3- BGU trench, foundation and support is not ready.
Monday, March 5, 2018 4- QZA Instrument support is not ready, backfilling and compaction required.
RBB-p5 ELEC.
RBB-p5 INST.
SAK-p9 ELEC.
SAK-p9 INST.
Tuesday, March 6, 2018
RBB-p5 ELEC.
Tuesday, March 6, 2018
RBB-p5 INST.