You are on page 1of 5

Earthing Measurement Sheet (Matatirtha Substation)

Cable Total Drum Drum


Cable
Date Cable Tag no From Eqpt To Eqpt Unit RUN layied layied Total balance Drum/Packing No Remarks
Size/Sqmm
Length Length Length Length
31.08.2022 160 Copper conductor Line Bay (maras-1) MB-1&2 Cable trench Crossing 160 Sqmm Mtr 6R 5 30 500 0 Drum-4
05.09.2022 160 Copper conductor Line Bay(maras-1) near SPR 1 Cable trench Crossing 160 Sqmm Mtr 7R 6 42 509 0 Drum-5
06.09.2022 160 Copper conductor Line Bay (maras-2) near SPR 1 Cable trench Crossing 160 Sqmm Mtr 5R 6 30
09.09.2022 160 Copper conductor CB fdtn Near Road main Trench Cable trench Crossing 160 Sqmm Mtr 5R 6 30
13.09.2022 160 Copper conductor Line Bay (maras-2) MB-1&2 Cable trench Crossing 160 Sqmm Mtr 6R 6 36
14.09.2022 160 Copper conductor BC Bay Cable trench Crossing 160 Sqmm Mtr 6R 7 36
19.09.2022 160 Copper conductor SPR3 to SPR2 Cable trench Crossing 160 Sqmm Mtr 10R 6 60
22.09.2022 160 Copper conductor SPR2 to SPR1 Cable trench Crossing 160 Sqmm Mtr 13R 6 78

23.09.2022 160 Copper conductor Road Crossing Transformer fdtn ATR.2 -R2 ,Y2 B2. 160 Sqmm Mtr 4R 10 40
24.09.2022 160 Copper conductor Road Crossing Transformer fdtn ATR ST,ATR.1 B1,Y1. 160 Sqmm Mtr 10R 14 140
24.09.2022 160 Copper conductor Road Crossing Transformer fdtn ATR 1 R1 phase 160 Sqmm Mtr 2R 11 22

03.11.2022 160 Copper conductor CB fdtn Near Road main Trench Cable trench Crossing 160 Sqmm Mtr 2R 9 18
03.11.2022 160 Copper conductor CB fdtn Near Road main Trench Cable trench Crossing 160 Sqmm Mtr 3R 6 18
03.11.2022 160 Copper conductor CB fdtn Near Road main Trench Cable trench Crossing 160 Sqmm Mtr 1R 11 11
04.11.2022 160 Copper conductor CB fdtn Near Road main Trench Cable trench Crossing 160 Sqmm Mtr 21R 8 196

12.11.2022 160 Copper conductor T.B.C & Tfr bay,Trishuli bay 1,2 Cable trench Crossing 160 Sqmm Mtr 25R 8 200

22.11.2022 160 Copper conductor Control Room Building Door crossing 160 Sqmm Mtr 1R 10 10
22.11.2022 160 Copper conductor Control Room Building Door crossing 160 Sqmm Mtr 2R 6 12

Total= 1009M
Earthing Measurement Main Drainage-MATA
08.12.2021 160 Copper conductor Main Drainage Section Main Drainage Crossing 160 Sqmm Mtr 10R 11 110 110 0 Drum-1
28.12.2021 160 Copper conductor Main Drainage Section Main Drainage Crossing 160 Sqmm 35R 13 455 455 0 Drum-2
27.02.2021 160 Copper conductor Main Drainage Section Main Drainage Crossing 160 Sqmm 15R 13 195 202 0 Drum-3
27.02.2021 160 Copper conductor Main Drainage Section Main Drainage Crossing 160 Sqmm 1R 7 7
Total= 767M

. CMEC NEA .
Cable Total Drum Drum
Cable
Date Cable Tag no From Eqpt To Eqpt Unit RUN layied layied Total balance Drum/Packing No Remarks
Size/Sqmm
Length Length Length Length

29.11.2022 160 Copper conductor 132 kv Cable Trench (0.8x0.8) Cable trench Crossing 160 Sqmm Mtr 21R 5 105 278mtr 0 Drum-6 132kv
29.11.2022 160 Copper conductor 132 kv side Equipment Ground Earthing 160 Sqmm Mtr 1R 173 173 132kv

Total= 278 mtr

14.11.2022 160 Copper conductor 220kv Road main Trench Cable trench Crossing 160 Sqmm Mtr 4R 5 20 206mtr 0 Drum-7(THA-0356)

23.11.2022 160 Copper conductor SPR 2 to SPR 1 between Cable trench Crossing 160 Sqmm Mtr 7R 5 35

03.01.2023 160 Copper conductor 132 kv Cable Trench Cable trench Crossing 160 Sqmm Mtr 10R 6 60 132kv

05.01.2023 160 Copper conductor 132 kv Eqpt Earthing Equipment Ground Earthing 160 Sqmm Mtr 1R 91 91 132kv

Total= 206 mtr

06.01.2023 160 Copper conductor Trishuli 2 Bay(main Bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 256 256 2250 0 MAT-JSHY-01-01/08
07.01.2023 160 Copper conductor Trishuli 2 Bay(main Bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 110 110
008.01.2023 160 Copper conductor Trishuli 1Bay(main Bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 206 206
09.01.2023 160 Copper conductor Transformer 1 Bay (main Bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 422 422
10.01.2023 160 Copper conductor T.B.C Bay (main Bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 405 405
11.01.2023 160 Copper conductor Transformer 2 Bay (main Bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 193 193
12.01.2023 160 Copper conductor Transformer 2 Bay (main Bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 225 225
13.01.2023 160 Copper conductor BC Bay (Main bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 122 122
14.01.2023 160 Copper conductor future Bay(Main bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 91 91
15.01.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 0 0 Holiday
16.01.2023 160 Copper conductor Mars 2 Bay (main bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 135 135
17.01.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 0 0 not layied
18.01.2023 160 Copper conductor Mars 2 Bay (main bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 30 30
19.01.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 0 0 not layied
20.01.2023 160 Copper conductor Mars 2 Bay (main bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 55 55
Total= 2250

. CMEC NEA .
Cable Total Drum Drum
Cable
Date Cable Tag no From Eqpt To Eqpt Unit RUN layied layied Total balance Drum/Packing No Remarks
Size/Sqmm
Length Length Length Length
21.01.2023 160 Copper conductor Mars 2 Bay (main bus 1&2) Equipment Ground Earthing 160 Sqmm Mtr 1R 59 59 2250 0 MAT-JSHY-01-02/08
22.01.2023 160 Copper conductor Mars Bay (Transfer bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 50 50
23.01.2023 160 Copper conductor Mars Bay (Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 102 102
24.01.2023 160 Copper conductor Mars Bay (Transfer bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 106 106
25.01.2023 160 Copper conductor ATR2 Bay( Transfer bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 101 101
26.01.2023 160 Copper conductor 132 kv Eqpt Earthing Equipment Ground Earthing 160 Sqmm Mtr 1R 55 55 132kv
27.01.2023 160 Copper conductor 132 kv Eqpt Earthing Equipment Ground Earthing 160 Sqmm Mtr 1R 27 27 132kv
28.01.2023 160 Copper conductor 132 kv Eqpt Earthing Equipment Ground Earthing 160 Sqmm Mtr 1R 44 44 132kv
29.01.2023 160 Copper conductor ATR1 Bay( Transfer bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 101 101
30.01.2023 160 Copper conductor ATR1 Bay( Transfer bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 90 90
31.01.2023 160 Copper conductor T.B.C Bay (Transfer bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 100 100
01.02.2023 160 Copper conductor BC,Trishuil-1,ATR 1-Trans Bus side Equipment Ground Earthing 160 Sqmm Mtr 1R 381 381
02.02.2023 160 Copper conductor Trishuli 2 Bay(Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 39 39
03.02.2023 160 Copper conductor Trishuli 2 Bay(Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 76 76
04.02.2023 Saturday no work
05.02.2023 160 Copper conductor Trishuli 1 Bay(Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 23 23
06.02.2023 not layied
07.02.2023 160 Copper conductor Trishuli 1 Bay(Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 72 72
08.02.2023 160 Copper conductor Transfer Bus-ATR 1Bay Equipment Ground Earthing 160 Sqmm Mtr 1R 75 75
09.02.2023 160 Copper conductor Transfer Bus-ATR 1& ATR2 Bay Equipment Ground Earthing 160 Sqmm Mtr 1R 77 77
10.02.2023 160 Copper conductor Transfer Bus-ATR 1Bay Equipment Ground Earthing 160 Sqmm Mtr 1R 63 63
11.02.2023 160 Copper conductor Transfer Bus-Maras bay 2 Equipment Ground Earthing 160 Sqmm Mtr 1R 68 68
12.02.2023 160 Copper conductor Transfer Bus-Maras bay 2 Equipment Ground Earthing 160 Sqmm Mtr 1R 63 63
13.02.2023 160 Copper conductor Transfer Bus-Maras bay 2 Equipment Ground Earthing 160 Sqmm Mtr 1R 87 87
14.02.2023 160 Copper conductor Transfer bus- Tfr 2 bay Equipment Ground Earthing 160 Sqmm Mtr 1R 70 70
15.02.2023 160 Copper conductor Trishuli 1 Bay(Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 73 73
16.02.2023 160 Copper conductor Trishuli 1 Bay(Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 74 74
17.02.2023 160 Copper conductor Maras bay-1(Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 104 104
18.02.2023 Saturday not layied (hoilday)
19.02.2023 160 Copper conductor Mars bay-1(Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 70 70
Total= 2250

20.02.2023 160 Copper conductor Mars bay-1(Main bus&Transfer Bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 111 111 2500 407 MAT-JSHY-01-04/08

. CMEC NEA .
Cable Total Drum Drum
Cable
Date Cable Tag no From Eqpt To Eqpt Unit RUN layied layied Total balance Drum/Packing No Remarks
Size/Sqmm
Length Length Length Length
21.02.2023 160 Copper conductor Mars bay-1(Main bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 74 74
22.02.2023 160 Copper conductor Mars bay-1(Main bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 55 55
23.02.2023 160 Copper conductor Mars bay-1(Main bus) Equipment Ground Earthing 160 Sqmm Mtr 1R 70 70
24.02.2023 160 Copper conductor Mars bay-1(Main bus) Road side Equipment Ground Earthing 160 Sqmm Mtr 1R 103 103
25.02.2023 160 Copper conductor Mars bay-1(Main bus) Road side Equipment Ground Earthing 160 Sqmm Mtr 1R 120 120
26.02.2023 160 Copper conductor Mars bay-1(Main bus) Road side Equipment Ground Earthing 160 Sqmm Mtr 1R 108 108
Between Main bus& Transfer Bus
27.02.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 20 20
Road Crossing
Between Main bus& Transfer Bus
28.02.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 19 19
Road Crossing
Between Main bus& Transfer Bus
01.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 37 37
Road Crossing
Between Main bus& Transfer Bus
02.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 20 20
Road Crossing
03.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 28 28
04.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 29 29
05.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 5 5
06.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 0 0
07.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 32 32
08.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 36 36
09.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 39 39
10.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 0 0
11.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 55 55
12.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 0 0
13.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 37 37
14.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 35 35
15.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 26 26
16.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 58 58
17.03.2023 160 Copper conductor Road Crossing Transformer fdtn Equipment Ground Earthing 160 Sqmm Mtr 1R 53 53
19.03.2023 160 Copper conductor 220Kv Auxiliary Bus Side Equipment Ground Earthing 160 Sqmm Mtr 1R 19 19
Between Main bus& Transfer Bus
23.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 14 14
Road Crossing
Between Main bus& Transfer Bus
24.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 42 42
Road Crossing

. CMEC NEA .
Cable Total Drum Drum
Cable
Date Cable Tag no From Eqpt To Eqpt Unit RUN layied layied Total balance Drum/Packing No Remarks
Size/Sqmm
Length Length Length Length
Between Main bus& Transfer Bus
25.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 27 27
Road Crossing
Between Main bus& Transfer Bus
26.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 54 54
Road Crossing
Between Main bus& Transfer Bus
27.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 33 33
Road Crossing
Between Main bus& Transfer Bus
28.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 26 26
Road Crossing
Between Main bus& Transfer Bus
30.03.2023 160 Copper conductor Equipment Ground Earthing 160 Sqmm Mtr 1R 58 58
Road Crossing
01.04.2023 160 Copper conductor Contrrl room R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 26 26 Control Building
02.04.2023 160 Copper conductor Contrrl room R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 52 52 Control Building
03.04.2023 160 Copper conductor Main Bus line 1&2 R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 90 90
04.04.2023 160 Copper conductor Main Bus line 1&2 R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 113 113
05.04.2023 160 Copper conductor Main Bus line 1&2 R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 36 36
06.04.2023 160 Copper conductor Main Bus line 1&2 R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 84 84
07.04.2023 160 Copper conductor Main Bus line 1&2 R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 55 55
08.04.2023 160 Copper conductor Main Bus line 1&2 R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 56 56
09.04.2023 160 Copper conductor Main Bus line 1&2 R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 94 94
10.04.2024 160 Copper conductor Main Bus line 1&2 R.wall Crossing Equipment Ground Earthing 160 Sqmm Mtr 1R 44 44
2093

Total conductor used till date:10 April 2023 8853 meter