You are on page 1of 4

Name of the Master Method of

Area Extent
Plan as per report delineation Source of
Data
Data
Collected
Collected

NAVI MUMBAI
MUNICIPA
CORPORATION Delineated according to
DRAFT DEVELOPMENT the nodal development by
PLAN 2018-2038 344sqkm the NMMC TRANSPORT ANDCity Engineer Dep
Sector Name

Type/Method of Project based Policy or Legislation


Issues
Analyses Proposals based Proposals

For population projection :


1.Arithmetical Increase
Method 1) There is paucity of h NMIA( airport) policy for Reconstruction/ Redevelopment of old an

12) For increasing


population, existing
facilities of cremation
and burial ground is not
Sufficient13) Because
of Industrial activity,
extent of scrap market
2 Geometrical Increase 14) It is necessary
is increasing day byto
Method make
day. provisions for proposed to allow cyclThe cost of the land is worked out on the basis of G
3 Percentage Increase
some water works/
Method
4 Incremental Increase Rearrangement of Existing School Buildings on Adjacent Play Ground for
networks and sewerage
Method
5 Public Health Department treatment plant
Method installations for future
6 Graphical Method expansion.

15) Existing fire brigade


stations are less in
number comparing the
spread of the city. 16)
There is no provision
for cycle track and
moreover, present
streets
and do nottofacilitate
required be
preserved.
ruction/ Redevelopment of old and dilapidated building which were constructed by CIDCO and having aged more than 30 years

nd is worked out on the basis of Govt. policy bearing No.NMQ/1092/1045/CR-121/92/UD-20 Dated 6th January, 1994 (for CIDCO land)&rat
ings on Adjacent Play Ground for Reconstruction of School Buildings
re than 30 years

1994 (for CIDCO land)&rates given in Annual Statement of Rates of Registration department (for private land)

You might also like