Professional Documents
Culture Documents
Project Description
Supply of labor, tools, equipment and technical supervision for the Civil Works at True Value Nuvali,
Sta. Rosa Laguna.
SCOPE OF WORK QTY. / UNIT AMOUNT TOTAL
1. Mobilization / Demobilization 1 lot Php 20,000.00 Php 20,000.00
2. Dismantling of signage and signage fascia for the roll
up replacement.
1 lot Php 15,000.00 Php 15,000.00
3. Installation of OSM Vinyl Wood Plank on signage facia. 8.55 sqm Php 500.00 Php 4,275.00
4. Replacement of column cladding cover and finishing of
existing false column located at store entrance. (see 28.8 sqm Php 1,500.00 Php 43,200.00
details on plan)
5. Painting of false column along entrance arch. (see
details on plan)
25.2 sqm Php 1,000.00 Php 25,200.00
6. Site Clearing and Cleaning. Php 5,000.00 Php 5,000.00
7. CARI 1 lot Php 3,000.00 Php 3,000.00
TOTAL Php 115,675.00
8. Vat 12% 1 lot Php 13,881.00 Php 13,881.00
GRAND TOTAL Php 129,556.00
Prepared by:
____________
JL. JOSON
Checked By:
____________
E. CAJAYON
Approved By:
____________
MV. LORICA