You are on page 1of 62

Chapter 4 Operation – crane

superstructure
1690-000-04Y

4.1 Control instruments and indicators


4.1.1 Operator's cab

1 Front windshield wiper 2 Instrument panel 3 Monitor for main winch


4 Roof window wiper 5 Fan 6 Fire extinguisher
7 Emergency hammer 8 A/C 9 Operator’s seat
Right electrical control Left electrical control
10 11 12 Accelerator pedal
box box

4-1
1690-000-04Y

4.1.2 Operator's seat

Seat adjustment hand


levers

Backrest adjustment switch

4.1.3 Right electrical control box

2
4

1 Main winch high-speed 2 Control lever, right 3 Label


button
4 Control panel (Blank) 5 Reserved switch

4-2
1690-000-04Y

4.1.3.1 Right label

Reel off main


winch
Derrick boom down or
telescope out
Derrick boom up Right label
Spool up main winch
or telescope in

Note:
The safety switch is located on the back of right
control lever. The operation of the control lever
will be invalid if the safety switch is not pressed.

Safety switch, right

Warning:
Do not press the safety switch with tools for a long time.

4-3
1690-000-04Y

4.1.4 Left electrical control box

1 5

1 Electric horn button 2 Control lever, left 3 Label


4 Control panel, left 5 Reserved switch

4.1.4.1 Left label

Left label
Reel off auxiliary winch
Slew to right

Slew to
Spool up auxiliary winch
left

4-4
1690-000-04Y

Note:
The safety switch is located on the back of left
control lever. The operation of the control lever
will be invalid if the safety switch is not pressed.

Safety switch, left

Warning:
Do not press the safety switch with tools for a long time.

4-5
1690-000-04Y

4.1.4.2 Control panel, left

1 Switch Operating mode selection for boom pin


2 Switch Operating mode selection for cylinder pin
3 Switch Switching between derrick / telescope
4 Switch Switching telescopic mode between manual / automatic

4-6
1690-000-04Y

1 Switch Operating mode selection for boom pin

Left position: retract boom pin.


Right position: extend boom pin.

2 Switch Operating mode selection for cylinder pin

Left position: retract cylinder pin.


Right position: extend cylinder pin.

3 Switch Switching between derrick / telescope

Left position: movement “Derrick boom up / down” is activated.


Right position: movement “Telescope boom in / out” is activated.

4 Switch Switching telescopic mode between manual / automatic

Left position: movement “Telescope boom in /out” is carried out


automatically.
Right position: movement “Telescope boom in /out” is carried out
manually.

4-7
1690-000-04Y

4.1.5 Instrument panel

1 Control light Pulling boom pin out


2 Control light Boom code
3 Control light Retracting telescopic cylinder
4 Control light Extending telescopic cylinder
5 Control light Extending cylinder pin fully
6 Control light Retracting cylinder pin fully
7 Control light Extending boom pin fully
8 Control light Retracting boom pin fully
9 Warning light Main / auxiliary winch approaching to upper limit
10 Warning light Main / auxiliary winch approaching to lower limit
11 Control light Power of counterweight remote control box
12 Load moment limiter
13 Warning light Engine defects
14 Warning light Charge monitoring
15 Warning light Engine oil pressure too low
16 Control light Engine stop owing to serious fault
17 Warning light Engine coolant temperature too high
18 Warning light Gear oil level too low
19 Warning light Engine cooling water level too low
20 Warning light The 5th outrigger pressure too high
21 Warning light Lubricant level too low
22 Switch Central lubricating system
23 Switch PTO
24 Switch Ignition starter switch
25 Switch Oil cooler
26 Switch Corner marker lights and boom head light on
27 Switch Battery master switch

4-8
1690-000-04Y

28 Switch Working lights


29 Switch Emergency off
30 Switch Window wiper front window
31 Switch Window washer system front window
32 Bypass key switch
33 Switch Supplying hydraulic oil automatically
34 Switch Slow gear
35 Switch Tilting operator’s cab
36 Cigarette lighter
37 Switch Raising / lowering counterweight

1 Control light Pulling boom pin out

Control light lights up: the boom pin is permitted to be pulled out.
Do not pull out the boom pin until control light lights up.

2 Control light Boom code

The times the control light flashes every interval show which boom
section the telescoping mechanism is at.

3 Control light Retracting telescopic cylinder

Control light lights up: the cylinder pin is a little close to the front position
of its hole.
Retract a little to align the telescopic cylinder.

4 Control light Extending telescopic cylinder

Control light lights up: the cylinder pin is a little close to the rear position
of its hole.
Extend a little to align the telescopic cylinder.

Note:
If the cylinder pin is aligned, the control light 3 and 4 will all light up.
The cylinder pin can be retracted or extended.
.

4-9
1690-000-04Y

5 Control light Extending cylinder pin fully

The control light lights up: the cylinder pin is fully extended.

6 Control light Retracting cylinder pin fully

The control light lights up: the cylinder pin is fully retracted.

7 Control light Extending boom pin fully

The control light lights up: the boom pin is fully extended.

8 Control light Retracting boom pin fully

The control light lights up: the boom pin is fully retracted.

9 Warning light Main / auxiliary winch approaching to upper limit

The warning light lights up: main / auxiliary winch approaches to upper
limit.

10 Warning light Main / auxiliary winch approaching to lower limit

The warning light lights up: main / auxiliary winch approaches to lower
limit.

11 Control light Power of counterweight remote control box

The control light lights up: the counterweight power switch is switched
on and the counterweight can be operated by remote control box.

Note:
Do not operate the counterweight via the remote control box until the control light lights up.

4-10
1690-000-04Y

12 Load moment limiter


Load moment limiter is a computer system for controlling and monitoring
mobile crane. It can precisely check whether the crane is in safe working
conditions and displays some basic parameters, such as boom length, boom
angle, working radius, rated lifting capacity etc., on the LCD.

13 Warning light Engine defects

The warning light lights up: crane superstructure engine detects engine
defects.

14 Warning light Charge monitoring


The warning light lights up: turn ignition starter switch to 1st position.
The warning light extinguishes: crane superstructure engine has
started off and the battery is charged.
The warning light illuminates after engine starting: charge defects.
Rectify at once.

15 Warning light Engine oil pressure too low

The warning light lights up: oil pressure of crane superstructure engine
is too low, lower than 0.5 bar (at idle speed), 2.5 bar (at rated RPM).

16 Warning light Engine stop owing to serious engine defects

The warning light lights up: crane superstructure engine detects serious
engine defects.

17 Warning light Engine coolant temperature too high

The warning light lights up: engine coolant temperature is too high,
greater than 98℃.

18 Warning light Engine oil level too low

The warning light lights up: engine oil level in superstructure generator
is too low. Check the engine oil level at once.

4-11
1690-000-04Y

19 Warning light Engine cooling water level too low

The warning light lights up: engine cooling water level is too low.

20 Warning light The 5th outrigger pressure too high


This crane is not equipped with the 5th outrigger.

21 Warning light Lubricant level too low

The warning light lights up: the lithium base grease is too low. Check it at
once.

22 Switch Central lubricating system

Activate the switch: the central lubricating system begins to work to


lubricate every lubricating point automatically.

23 Switch PTO
Press: increase superstructure idle speed from 600 r/min to 850 r/min;
Press again after 3 seconds: increase superstructure idle speed from 850
r/min to 1250 r/min;
Press after next 3 seconds: increase superstructure idle speed from 1250
r/min to1850 r/min;
Switch off: make superstructure return to idle speed.

24 Switch Ignition starter switch

Two positions, in clockwise direction


1st position: entire electrical system is electrified.
2nd position: the engine starts.

Caution:
After engine has started, release the key to let it return to 1st position automatically.
Return key to P0 first if you want to restart the engine.

4-12
1690-000-04Y

25 Switch Oil cooler

Press: its fan works.


In following situations, the fan works automatically:
a. Deflect the left control lever to the right or left;
b. If the temperature of hydraulic oil is greater than 600C. The fan will not
stop working until the oil temperature is less than 600C or battery master
switch is switched off.

26 Switch Corner marker lights and boom head light on

Press: corner marker lights and boom head light are on.

27 Battery master switch

Right position: the battery master switch near the battery on slewing
table is switched on and its control light lights up. The superstructure
is electrified.

28 Switch Working lights

1st position: working lights on switch;


2nd position: working lights on cab front and on boom.

29 Switch Emergency off

Press: cut off the output of oil line and PLC to ensure crane's
safe operation in the event of a clear emergency.

4-13
1690-000-04Y

30 Switch Window wiper front window

2 stages: first stage: intermittent wipe


second stage: continuous wipe

31 Button Window washer system front window

Press: activate the windshield washing system on the front window.

32 Bypass key switch


If the hook block contacts the hoisting limit switches during its upward
movement, the buzzer sends fast acoustic warning and switches off
the crane movements, such as “Spool up winches”, “Telescope out”,
“Derrick telescopic boom down”;

If the main hook block contacts the lowering limit switch during its
downward movement, the buzzer sends fast acoustic warning and
switches off the crane movement “Reel off winch”;

If the maximum permissible load torque is exceeded, the buzzer sends


fast acoustic warning and switches off all crane movements, such as
“Spool up winches”, “Telescope in”(in automatic mode), “Telescope
out” (in automatic mode), “Derrick telescopic boom down”.

The switch-off of “Spool up” and “Reel off” can be bypassed by the
bypass key switch.

Danger:
Increased accident risk when bypassing the movements “Spool up” and “Reel off”!
Carry bypassing movements with maximum care and minimum speed.
Never telescope with load!

4-14
1690-000-04Y

33 Switch Supplying hydraulic oil automatically

Rotate the switch to right position and use control lever to supply
hydraulic oil to winches. Detailed operating method is as follows:

1) Supply hydraulic oil to main winch


Rotate the switch to right position and deflect right control lever forward. Rotate
the switch to left position and deflect the lever to neutral position until the buzzer
sends slow acoustic warning;

2) Supply hydraulic oil to auxiliary winch


Rotate the switch to right position and deflect left control lever forward. Rotate
the switch to left position and deflect the lever to neutral position until the buzzer
sends slow acoustic warning;

Do not stop supplying hydraulic oil to main / auxiliary winch until the buzzer sends
slow acoustic warning. One supplying circle will need about 3 minutes.

Caution:
It is prohibited to press the safety switch on control lever when move the control
lever forward.

Supply hydraulic oil to main / auxiliary winch before operate the winches if the load
is suspended in the air by main / auxiliary winch for a period of time which meets
the following preconditions:

(Preheat the machine for 15 to 30 minutes in winter)

1) If 2 hours ≤ Time ≤ 6 hours, supply oil 1 circle at 1000 RPM;

2) If 6 hours ≤ Time ≤ 12 hours, supply oil 2 circle at 1000 RPM;

3) If Time ≥ 12 hours, supply oil 3 circle at 1000 RPM;

4-15
1690-000-04Y

34 Switch Slow gear

Right position: all crane movements apply with slow gear.

1-stage slow gear is applied to the crane movements “Slewing”,


“Spool main winch up” and “Reel main winch off".

2-stage slow gear is applied to the crane movement “Telescope


telescopic boom”:
First stage (slow): deflect right control lever to the right / left with
about 45°;
Second stage (fast): deflect right control lever to the right / left.

2-stage slow gear is applied to the crane movement “Derricking”.


First stage (slow): boom length is less than 40m;
Second stage (fast): boom length is greater than 40m.

35 Switch Tilting operator’s cab

The operator’s cab can be tilted upwards for 20°.


Right position: the cab tilts upwards;
Left position: the cab tilts downwards.

36 Cigarette lighter

With 24V power source.


It can be used as the power source for other electrical appliance.

37 Switch Raise / lower counterweight

Right position: raise / lower the counterweight.


Left position: the switch is turned off.

4-16
1690-000-04Y

4.2 Computer system


4.2.1 General

Notice!
Note:
The monitor illustrations in this chapter are only examples. The numerical values in the
individual icons and tables do not necessarily match exactly to the crane.

The load moment limiter is a computer system for controlling and monitoring mobile
cranes. In addition to control the boom telescoping via computer programs, it is also
of self-diagnosis function.

The load moment limiter calculates data from the pressure gauge, length sensors,
angle sensors and other monitoring devices to judge whether the crane is in safe
working conditions. And display the basic parameters, such as boom length, boom
angle, working radius, rated lifting capacity etc., on the LCD,.

If the actual load is greater than 90% of the rated one, the warning light lights up
and buzzer sends out slow acoustic warning.

If the actual load is greater than 100% of the rated one, the warning light lights up
and buzzer sends out fast acoustic warning and all dangerous crane movements
are switched off.

The crane can only carry out safe operations until the dangerous conditions are
released.

The load moment limiter can prevent crane from toppling or being destruction, thus
ensures crane’s safe operation.

If the rated lifting load displayed by load moment limiter is different to the load chart,
reference to the load chart.

The load moment limiter includes the following icons:

Auxiliary icon:
Wind speed on boom head, engine working hours, the current time and date;

Instrument icon:
Fuel gauge, water thermometer, engine oil pressure gauge, tachometer and main
pump pressure gauge;

Warning light icon:


Hoisting limit switch activated, lowering limit switch activated and engine defects;

4-17
1690-000-04Y

Button:
Bypass the buzzer

Instrument
icon

Bypass buzzer
Auxiliary
Warning button
icon
light icon

4.2.2 Program illustration


4.2.2.1 Switching on and performing self-test
After the system is switched on, the load moment limiter performs a self-test to
ensure whether the three PLC controllers are connected. If no errors are found
during the test, the monitor displays the following screen:

Fig. 1 Self-test passed

4-18
1690-000-04Y

If connection error is found during the test, the monitor shows the following screen:
device 0 (PLC) is not passed and test finishes.

Switch off to rectify the error (especially the connectors). Switch on to perform
self-test again.

Fig. 2 Self-test not passed

If self-test has run successfully, it switches automatically to the Main screen (See
Fig. 3) to display the parameters.

Icon line displays on the bottom of the monitor:

Auxiliary icon (from upward to downward)


● Wind speed
● Engine working hours
● Time
● Date

Instrument icon (from left to right)


● Oil reserve
● Oil pressure
● Water temperature
● Engine RPM
● Pressure of main oil line

Warning light icon


● Hoisting limit switch

4-19
1690-000-04Y

● Lowering limit switch


● Engine defects

Bypass buzzer button

Icon line displays on the top of the monitor:


● Boom length
● Boom angle
● Boom radius
● Boom’s working condition

The tricolor lamp is on the right side of the monitor to show the load torque.

Fig. 3 Main screen

Caution:
It takes longer time to start the load moment limiter than to start the PLC. The
buzzer sounds is a normal phenomenon before switching to Fig.1. The buzzer will
stop sounding automatically after Fig.1 appears.

Troubleshooting:
If the buzzer does not stop sending acoustic warning:
● Connection error
● Hoisting limit switch activated
● Lowering limit switch activated
● Overload protection activated
● Pipe overpressure protection activated

4-20
1690-000-04Y

Press bypass buzzer button to switch off alarm. But the current error cannot be
eliminated. The error can only be rectified manually according to actual working
condition.
Buzzer error can be found in Fig. 21: PLC checking -> control light.

4.2.2.2 Setting up operating mode


Set operating mode before telescoping.

Touch the key “Operating mode setting” on the top left-hand corner of main screen
to enter “Operating mode” screen (See Fig.4).

Caution:
Only the operating mode is set validly, can the system carry out telescoping
movement.

Definition of “Operating mode code” (5-digit short code):


A B C D E
st nd rd th th
The 1 figure The 2 figure The 3 figure The 4 figure The 5 figure
Outrigger Counterweight Boom \ jib selection Jib combination Telescoping
combination

There are three methods to set “Operating mode code”: manual matching, input
code and check lifting capacity table. The manual matching is usually adopted.

Method 2:
Input code

Method 3:
Check lifting
capacity table

Method 1:
Manual
matching

Fig. 4 Operating mode set

4-21
1690-000-04Y

1) Manual matching
● Select corresponding parameters in the drop-down menus (such as,
counterweight, boom, rope reeving, jib and jib offset angle) according to
actual conditions;
● The operating mode code is generated automatically and displayed on the
screen;
● Press key “Save” to confirm and return to main screen.

For the detailed information refers to Fig.8, Fig.9, Fig.10 and Fig.11.

If the selected parameters can form a valid OM code, it will be displayed on the
screen; if they cannot, the selected parameters are regarded as invalid and no
OM code is displayed.

Caution:
a. To modify a parameter, you should first select a data input frame. If the data
input frame is highlighted in yellow or blue, it means that this data input frame is
selected.

b. How to operate pull-down menu (menu with “▼”):


Click “▼” to display the optional parameters.
If there are too many parameters for selection, the operator can click “▲” or “▼”.

Fig. 5 Fig. 6

4-22
1690-000-04Y

Fig. 7 Fig. 8

2) Input code
● Input OM code according to OM Code Manual. Press key “Input” to switch to
Fig. 9;

● Press key “Save” to confirm and return to Fig.4.

Caution:
If the input OM code is invalid, a dialog box will appear to require operator to input
the OM code again according to OM Code Manual.

3) Check lifting capacity table


● Press “Table” to enter “Look up Table” (See Fig. 10);

● Input value of load and radius. The “Operating mode code” will appear;

● Input OM code.

Fig. 9 Input OM Fig. 10 Look up OM

4-23
1690-000-04Y

Caution:
a. Check whether the value of load or the radius input is too large if valid OM
cannot be found after inputting the value of load and radius and pressing key
“Find”. Decrease one of the two values according to actual working condition
and try again.

b. Select a suitable OM and press “Save” key to switch to Fig.4. Press “Save” key
again to return to Fig.3.
The counterweight and the outrigger window are displayed.
Do not carry out lifting operation until the current counterweight matches with
the selected OM.

4.2.2.3 Telescoping operation


The telescopic boom telescopes in 2 modes: manual and automatic.

Automatic mode is strongly recommended.


The manual mode can only be activated when the automatic mode is invalid.

Boom combination illustration:


Current position: 1-2― 3- 4-1(42.2m)
Target status: boom length
Telescope out V, number 1 - 4
Telescope out IV,number 1 - 4
Telescope out III, number 1 - 4
Telescope out II, number 1 - 4
Telescope out I, number 1 - 4

“I, II, III, IV, V” refer to telescopic boom section 1, 2, 3, 4, 5.

“1, 2, 3, 4” refer to that the boom is secured in the inserted holes of 0%, 45%, 90%
and 100%.

1) Automatic mode (3 steps)


a. Ensure that the following prerequisites are met:
● The valid operating mode has been set;
● The boom angle shouldn’t be less than 75°;
● Switch A has been set to “telescope”;
● Switch B is in neutral position;
● Switch C is in neutral position;
● Switch D is in neutral position;

4-24
1690-000-04Y

A B C D

● This icon “ ” does not appear.

As how to check the current errors and how to remove the stored errors refer
to the following contents.

If an actual telescoping error is detected, telescope the boom manually until


the error is removed. For detailed information refers to "Manual mode”
operation.

Caution:
All prerequisites above-mentioned must be met. Otherwise, the automatic mode
can’t be activated.

b. Ensure the current telescoping status of boom is correct.


● Press key “Telescope” to switch to Fig. 11;
● Confirm current telescoping status of boom.
If the displayed boom state matches with the actual one, press key “Yes”
to confirm.

If the displayed boom state does not match with the actual one, press key
“No” to confirm.

As to how to reset the boom state refers to following instruction.

Fig.11 Confirm boom status before “Boom telescope”

4-25
1690-000-04Y

Fig.12 Reset boom status before “Boom telescope”

Danger:
It is very import to confirm the boom status!
Improper setting will result in incorrect telescoping movement and cause fatal
accidents!

After current boom status is confirmed, the system will switch to Fig.13.

Information
line -
telescope

“Boom
telescoping
fault” icon

Fig.13 Monitor – boom telescoping

Upper display area includes following parameters:


● Boom length
● Offset angle
● Radius

4-26
1690-000-04Y

The information line displays the OM code and other related information.

Lower right display area displays:


● Boom current position
● Target boom position

c. Telescope boom automatically


Do not telescope telescopic boom until key “Telescope”
is highlighted in grey and key “Start” is highlighted in
blue.

Press key “Start” and the keys “Start”, “Back”, “Manual”


are highlighted in grey.

Set right switch on left electrical control box to left position. The telescopic
boom begins to initiate telescoping movement.
Key “Back”, “Manual” is highlighted in blue if the telescopic boom achieves
its target status.

Error calling up:


If an error is detected in automatic mode, the telescoping fault button will be
highlighted in red.

Press telescoping fault button to call up the errors. The frames highlighted
in yellow are shown the information about the errors (See Fig.14).

Rectify the errors.

Fig. 14 Telescope error

4-27
1690-000-04Y

Stored error cleared up:

If the icon“ ” still illuminates after the errors are rectified, set switch (in
page 26) from neutral position to right or left position and quickly return to
neutral.

Adjust the current boom status:


If the actual boom status differs from the displayed one, press “No” in Fig.11
to switch to Fig.15.

● Select the telescopic boom which needs to be adjusted;


● Press “+1” or “-1” to change the boom status;
● Press “OK” to confirm.

Fig. 15 Adjust the current boom status

Danger:
It is very import to confirm the boom status!
Improper setting will result in incorrect telescoping movement and cause fatal
accidents!
If user needs authorization code, please contact our technical personnel.

2) Manual mode

Caution:
Because the manual mode is complex, the operator is recommended to perform
the manual mode only when the automatic mode is invalid.

4-28
1690-000-04Y

Manual telescoping operation steps:


(1) The valid operating mode has been set. For the details, please refer to the
instructions “Automatic mode”;

(2) Switch A is set to right position;

(3) Switch B is set to neutral position;

(4) Switch C is set to neutral position;

(5) Switch D is set to neutral position;

A B C D

Caution:
The boom angle is permitted to be less than 75 °. However, the operator should
select a safe angle according to actual boom length to ensure the safety of
telescoping.

(6) Enter password;


● Press key “Manual” in Fig.13;
● Fig.16 appears;
● Enter password to switch to Fig.17.

Fig. 16 Password input

4-29
1690-000-04Y

(7) Telescope boom manually

In Fig.17, the current boom status can’t be adjusted, but the target boom
status can be adjusted if the OM code is valid.

● Press key “Start” if the target boom status is set. The key “Start" will be
highlighted in grey;
● Set switch D to right position;
● Move the right control lever;
● Switch on switch B and C to telescope boom manually.

1) Telescope 2) Telescope
boom out icon boom in icon 3) Boom code
icon
14) Adjust boom
target status
4) Boom pin
13) Boom code fully retracted
icon

12) Oil cylinder 5) Pulling


length boom pin out
icon

11) Boom pin


retracting length
6) Right
10) Boom pin cylinder pin
extending length fully extended
icon

9) Boom pin fully 8) Right cylinder 7) Main oil line


extended icon pin fully retracted pressure icon
icon

Fig.17 Monitor – boom telescope manually


Note:
The icon numbers in following contents are the ones in Fig.17.

4-30
1690-000-04Y

Read following instructions carefully before telescoping boom manually:

① Movement “Retract / Extend cylinder pin"

Danger:
Do not extend cylinder pin until the “Boom pin fully extended” icon lights up.
Otherwise, risk of serious damage.

The instrument panel is also equipped with such control lights as “Telescope boom
in / out”, “Cylinder pin extended / retracted fully”, “Boom pin extended / retracted
fully”. These control lights illuminate and extinguish with the icons on touch screen.

② Movement “Extend boom pin”

4-31
1690-000-04Y

Caution:
The movement “Boom telescope out / in“ must be initiate slowly
if boom pin is released.
It is recommended to switch on the left switch and slowly
telescope the boom out / in to prevent the boom pin from
missing the target pin holes.

③ Movement “Retract boom pin”

Caution:
Ensure the cylinder pin is fully extended (the “Cylinder pin fully
extended” icon lights up) before retracting boom pin.

Troubleshooting
Is the “Boom pin fully extended" icon extinguished, but the “Boom pin fully retracted”
icon does not illuminate and the value shown on pressure gauge keeps about
130bar?
● Stop retracting the boom pin!
● Retract boom pin till “Boom pin fully extended” icon lights up.
● Repeat movement “Retract boom pin”.

Caution:
Telescope boom in slowly in big radius if the boom pin is extended.
Icon 5 should be lighting up during boom telescoped in.

4-32
1690-000-04Y

Only when the oil cylinder is retracted for a certain distance, the speed of
telescoping the boom can be increased.

④ Limitations for telescoping the oil cylinder manually

The system will automatically switch off the movement “Extend oil cylinder” to
prevent it from being damaged if following prerequisites are met:

● All telescopic boom sections are fully telescoped in;


● Cylinder pin are retracted fully;
● Telescoping mechanism is at the tail of boom section V;
● Icon 2 and icon 5 light up.

At this time, only the telescopic boom section V can be retracted.

Press bypass switch to release the limitation.

⑤ Methods for how to identify which boom section is carrying out movement

Method 1:
The lighted boom code/codes shows/show which boom section is carrying out
movements.

Boom code lights up: 1


Boom code lights off: 0
Boom section = “Code 1” * 1 + “Code 2” *2 + “Code 3” *3

For example:
If control light on Code 1 and Code 3 light up, the current boom section which is
carrying out movement is section IV.

Method 2:
Observe the boom code from Fig.17 Monitor – boom telescope manually.

Method 3:
The times the control light flashes every interval show which boom section the
telescoping mechanism is at.

4-33
1690-000-04Y

⑥ If the boom pin is fully retracted, icon 10 displays the current pin hole position
and icon 11 displays the target pin hole position.

The length of oil cylinder varies with the moving of right control lever.

⑦ Adjust the target status


● Press the number frame till it is highlighted in yellow;
● Press “+1” and “-1”. And the input data should be valid combination.

The current status can’t be adjusted in Fig.17. It can be adjusted in Fig.15.

Points for attention during telescoping operation


a. The oil cylinder will drive the boom to retract automatically if the boom pin is
retracted ("Boom pin fully retracted” icon lights up).

If the boom does not retract for a long time:


●Change the automatic mode to manual mode;
●Extend the boom for 5 – 10 mm with slow gear activated;
● Retract it again.

In this condition, the operator must observe the above procedures; otherwise,
risk of great impact of the boom during retracting.

b. If the boom pin cannot be retracted during automatic telescoping process:


● Change the automatic mode to manual mode;
● Retract the boom pin manually until the icon 4 lights up;
● Change to automatic mode again.

If the boom pin still cannot be retracted, repeat above steps.

c. If the icon “Boom telescoping fault” lights up during the operation of telescoping
in the boom in the condition of crane has worked for a long time:
● Change the automatic mode to manual mode;
● Extend the oil cylinder with slow gear until icon 5 lights up.

If the cylinder is still being extended after the icon 5 lights up:
● Retract the oil cylinder until the control light 3 (Retract telescopic cylinder) and
control light 4 (Extend telescopic cylinder) light up;
● Change to automatic mode.

4-34
1690-000-04Y

4.2.2.4 System check and diagnosis


Press “Check and diagnosis” in “Routine operation” menu to switch to Fig.18.
“Connection test” is default.
The operator can press other 4 buttons to check and diagnose the system
according to requirements.

Fig.18 System check and diagnosis Fig.19 Sensor check

1) Control system test


Please refer to Operating Manual for Load Moment Limiter.

2) Sensor check
Observe the real-time output value of sensor (See Fig.19).

3) PLC status checking


PLC is used to test the actual input and output values of PLC in all crane
movements.

The white square frame displays analog quantities, and the grey square frame
displays Boolean quantities.

In the following flow charts, the grey square frame will be highlighted in
red and the white square frame will display the corresponding data if the
date flows through them (See Fig.20 & Fig.21).

From the flow charts, the operator can check actual parameters, do diagnosis
and judge whether the operation is mis-operated.

For example, when the remote control box is used, the "Counterweight switch"
must be activated. If the "Counterweight switch" is inactivated, the operation of
remote control box will be invalid and its square frame color (in Fig. 20) will not
be highlighted in red.

4-35
1690-000-04Y

The crane movements "Derrick up / down" and "Spool up / down main winch"
can also monitor the input and output values of PLC. The operator can monitor
the parameters according to working requirements.

Fig.20 PLC status checking - Slewing monitoring

Fig. 18 PLC status checking – Control lights

4) PLC parameter set


Input password first before setting the parameter.

If password is confirmed, Fig.19 will appear.

4-36
1690-000-04Y

Caution:
The PLC parameters should be set by technical personnel.

Fig.22 Parameter set – PLC

4-37
1690-000-04Y

4.3 Starting up the crane


4.3.1 Checks before starting up
Ensure that the following prerequisites are met before staring up:
1. Checking the engine oil level
● The machine has been leveled;
● Pull out the dipstick and clean it;
● Reinsert it into oil and pull out again;
● Check whether the oil level is between MIN and MAX markings.

Warning:
If the engine oil level has fallen below MIN marking, refill oil until the oil level
reaches between MIN. and MAX. Failure to refill oil will result in serious damage to
engine due to insufficient lubrication.

2. Checking the hydraulic oil level


The hydraulic oil level must be between MIN and MAX.

3. Checking the fuel level


The fuel level is displayed on the lower part of load moment limiter screen. 1
represents fuel reserve 100% and 0 represents fuel reserve 0%.

Caution:
Deaerate the fuel system before adding fuel.
If the fuel tank has been run dry, always deaerate the whole fuel system.
Do not run the fuel tank dry!

4. Checking the coolant level


Fill coolant expansion tank up to overflow on filler neck. If the coolant level is too
low, the warning lamp on instrument panel in operator’s cab will light up.

The coolant used in engine is antifreeze and antirust fluid. Add different grade of
antifreeze fluid according to different freezing point depending on variable
temperature (Generally, the antifreeze fluid grade is -5℃ in the condition of new
product leaving the factory. In winter, the antifreeze fluid grade is -25℃ to -35℃).
Never use water to substitute antifreeze and antirust fluid.

Danger:
Engine must be cold to lower than 50℃ when performing coolant level check.
Danger of injury due to scalding of the skin.

5. Checking central lubricating system


The grease container must be kept filled with grease.

6. Checking general condition of crane

4-38
1690-000-04Y

1) Check the crane is properly supported on a level load-bearing surface, and has
been set up horizontally.

2) Check that the toothed ring of the slewing ring connection is clean and
greased;

3) The front and rear part of oil cooler and A/C radiator has been cleaned and free
of blockage.

4) Ensure that there are no people or objects in the crane danger zone.

5) Make sure that the cable / rope drums and the limit switches are free of snow
and ice.

6) Make sure that there are no loose parts on the superstructure or the telescopic
boom.

Danger:
Ensure that there are no loose parts on boom system prior to derricking the boom
up; otherwise, falling parts will cause fatal injury.

4.3.2 Starting the engine


1. Switch on battery master switch
If the superstructure battery master switch is switched on, the relay
switch of the master power near the battery on slewing table will also
be on and its control light lights up.
If the control light does not light up, check the connection of
superstructure master power source.

2. Switching on the engine

Two positions, in clockwise direction


1st position: the whole electrical system is electrified.
2nd position: the engine is started.

Caution:
1) After engine is started, release the key to let it return to the 1st position
automatically. This key has the function to prevent the engine being started
repeatedly (i.e., if the engine has started, the next engine starting will be invalid
if do not return the key to original position).

4-39
1690-000-04Y

2) Never run the motor for 15 seconds continuously. The motor can be operated
two times per attempt with a pause in between of several minutes each time to
avoid battery discharging electricity and starter motor being damaged. If the
engine does not start after 3 attempts, have the engine defects rectified.

4.3.3 Computer system after engine start


The monitoring main screen will appear on the monitor after the computer system
switches on and passes its self-test. After the engine starts, the relevant data, such
as engine working hours, date, oil reserve, oil pressure, coolant temperature and
RPM etc., can be monitored via the load moment limiter screen. Check the relevant
data. Once an error is detected, turn off the engine and determine the cause.

OM (operating mode) set can be performed on the screen of monitoring main


screen. For detailed information refers to Chapter 4.2.2.

4.4 Safety devices


4.4.1 General
Every time the crane is operated, the crane operator is required to satisfy himself
about the functionality of the safety systems.

Danger:
Danger of accident from defective warning and safety systems!
Operating the crane with defective warning and safety systems can lead to
life-threatening accidents!

4.4.2 Support control unit


To ensure the working safety of the crane, the crane must be properly supported on
a level load-bearing surface, and be set up horizontally.

The two support control units (switch box) with buttons are attached to both sides of
the vehicle from which the operator can observe the level conditions of the entire
vehicle.

Caution:
Level the entire vehicle and make sure its deviation is less than 0.6° otherwise
fatal accidents may be increased.

4-40
1690-000-04Y

If deviation >1.0°, the LED


flashes.

If 0.8° ≤ deviation ≤ 1.0°,


the LED lights up.

If 0.4° ≤ deviation ≤0.6°, the


LED lights up.

If 0.4° ≤ deviation ≤0.6°, the


LED lights up.

If 0.2° ≤ deviation ≤0.4°, the


LED lights up.

If deviation ≤0.2°, the


LED lights up.

4.4.3 Load moment limiter


The load moment limiter is a device for controlling and monitoring the crane's
movements. If the actual load exceeds 90% of the rated one, the warning lamp will
light up and buzzer will sound intermittently. If the actual load reaches or exceeds the
rated lifting capacity, the overload control light will light up and buzzer will sound
continuously. At this time, the load moment limiter will send out a cut-off signal. All
movements towards dangerous directions are cut off via the crane control
mechanism. In this case, the crane can only works towards safe directions till the
dangerous state is deactivated.

4-41
1690-000-04Y

4.4.4 Hoist / lowering limit switch


1. Lowering limit switch
In order to prevent the wire rope from being wound reversely after being unwound
completely, the lowering limit switches are mounted on main and auxiliary
winches to switch off when only 3 hoist rope windings are left on winches. Under
this situation, acoustic sound will be heard and only the upward movement of the
hook is permitted. During commissioning and maintenance, press the bypass
switch on the control panel to lower the hook.

Lowering limit

2. Hoisting limit switch


If the hook block contacts the hoisting limit switch weight during its upward
movement, the hoisting limit switch is triggered and buzzer sounds. The crane
movements “Spool up winches”, “Derrick telescopic boom down” and “Telescope
out” are switched off. At this time, only the crane movements “Spool down
winches”, “Derrick telescopic boom up” and “Telescope in” can be switched on.
This shut-off can be bypassed when the hoisting limit switch is released.

Hoisting limit switch on


rooster sheave
Hoisting limit switch on Hoisting limit on jib
weight
Hoisting limit switch
Hoisting limit switch weight

Dangerous operation (Be cut off) Bypassed (Return to safe operation)

4-42
1690-000-04Y

Press the bypass switch on the right control panel to switch on the crane
movements “Spool up winches”, “Derrick telescopic boom down” and “Telescope
out” during commissioning and maintenance.

Warning:
Never use bypass switch in normal operation!

4.4.5 Hydraulic safety valves


1. Relief valve in hydraulic system
The relief valve in hydraulic system can prevent the pressure in the circuit from
raising too high, thus avoid hydraulic oil pump and hydraulic motor from being
damaged and hydraulic system from being overloaded.

2. Outrigger locking device


If the high pressure oil pipe which is connected to vertical cylinder is damaged,
the bidirectional hydraulic lock in the outrigger hydraulic circuit can block the
pressure oil in the two chambers of outrigger cylinder to prevent the outrigger
from retracting or extending, and thus ensure the safe operation of the crane.

3. Locking device for crane movement “Derrick telescopic boom up”


If the high pressure oil pipe in the hydraulic circuit of boom derricking cylinder is
damaged, the balance valve in the hydraulic circuit can lock the hydraulic oil in the
lower chamber of derricking cylinder immediately to prevent the boom upward
movement from being down, and thus ensure the safe operation of the crane.

4. Locking device for crane movement “Telescope boom out”


If the high pressure oil pipe in the hydraulic circuit of boom telescopic cylinder is
damaged, the balance valve in the hydraulic circuit can lock the hydraulic oil in
the upper chamber of telescopic cylinder immediately to prevent the telescoping
boom sections from retracting naturally, and thus ensure the safe operation of the
crane.

4.4.6 Bypass operation


If the hook block contacts the hoisting limit switch weight or lowering limit switch
during its upward movement or downward movement, the hoisting limit switch and
lowering limit switch is triggered. The dangerous movements will be switched off. If
the maximum load torque is exceeded, the control system will switch off all crane
movements to increase load torque. The buzzer begins to sound. If necessary,
press the “bypass switch” in operator’s cab to release the switching off. For details,
please refer to the relevant information to “bypass switch” in Chapter 4.1.5.

4-43
1690-000-04Y

Main Auxiliary
Derrick Slew Telescope
hoisting hoisting
up down up down up down left right out in

Overload × √ × √ √ × √ √ × ×

Overwinding × √ × √ √ × √ √ × ×

overlowering √ × √ × √ × √ √ × ×

Danger:
If there is a need to lifting or lowering the hook a little under special condition, the
operator can operate the “bypass switch” on the instrument panel to bypass the
crane’s switch-off movements. Such operation should be performed with utmost
caution to avoid accident. And all consequences resulted from such operation
should be taken by the operator!

Never telescope telescopic boom with load. In that situation, the crane operator
bears full responsibility.

4.4.7 Wind warning system


The wind gauge is fitted on the boom head of the crane to detect the wind speed.
The wind speed appears in the screen of load moment limiter. If the actual wind
speed exceeds the maximum value, stop the crane operation and lower the boom.

Danger:
Risk of accident from crane toppling if operating in the condition of exceeding the
permitted wind speed!

Wind speed

Wind gauge
风速仪

4-44
1690-000-04Y

4.4.8 Emergency off switch


The emergency off switch is fitted on the instrument panel in operator’s cab. If it is
operated, the electrical crane control is switched off. Every movement carried out
can be immediately stopped.

After the emergency off switch has been operated, the system can be released by
turning the switch (See the right Fig.).

Warning:
Only use the emergency off switch in the event of a clear
emergency! Use of the emergency off switch for normal condition
is not permitted!

4.5 Crane operation


4.5.1 Preparations before crane operation
Ensure that following checks are operated before operation:
1) Assess the load condition prior to lifting it;

2) Check the crane position, ground condition and surface bearing condition;

3) Check wire ropes (including wire rope’s end, winding drum and pulleys);

4) Check the liquid level and power source of the crane;


Note:
a. Oil level is more than 1/4 of the tank oil capacity (Check the fuel gauge).
b. The hydraulic oil level in hydraulic oil tank is between the maximum oil level and
minimum oil level in transport condition.

5) The loading and working area should be visible and without no obstacles within
it. Check the communication system of operator and supervisor to ensure that
nothing will hinder the operation;

6) Check safety device for functioning work;

7) Remain the communication between the operator and the rigger.

Warning:
In order to protect the crane and reduce the danger of accidents always operate
the control lever slowly and sensitively.

Danger:
Ensure that there are no obstacles in the crane working area and no persons in
danger zone. Give a short warning signal (horn) before starting a crane movement.

4-45
1690-000-04Y

4.5.2 Derricking
The telescopic boom is derricking via an oil cylinder.

The boom upward angle varies from -0.5° to 83°. Operate the right control lever to
derrick the telescopic boom up / down.

Before derricking, switch the following switch at left position “Derricking”.

Speed of crane movement “Derricking” has 2 stages, normal speed and low speed,
which is activated via the slow gear switch (See the following Fig.).

Normal speed:
The more the control lever is pulled towards left or right, the faster the speed will be.

Low speed:
Switch right switch at right position “Slow gear”.
If the boom length < 40 m, the speed of “Derricking” is slow.
If the boom length ≥ 40 m, the speed of “Derricking” is very slow.

4-46
1690-000-04Y

Label on right
control lever

Derrick boom down

Derrick boom up

The balance valve fitted in hydraulic system can not only ensure load lifted /
lowered steadily but also stop load in any position.

Caution:
a. Operation should be carried out stably. Jerkily operation will bring great impact to
the crane during load lifting.
b. Never increasing the working radius with load. Operator should strictly restrict
the maximum working radius according to lifting capacity table.
c. Lower the hook fully before derricking up the boom.
d. For the sake of safety, never derricking down the boom at high speed.

4.5.3 Boom telescoping


The movements “Telescope boom in / out” are controlled by the right control lever
automatically. Every telescopic section can telescope in 3 lengths: 45% of its total,
90% of its total and 100% of its total. The telescopic cylinder does not bear any load.

Before telescoping, switch the right switch at right


position “Telescoping”.

Label on right
control lever
4-47
1690-000-04Y

Telescope boom out

主臂
Telescope boom in

As to the details of telescoping operation, refer to Chapter 4.2.

The balance valves fitted in hydraulic system can ensure the boom to telescope in /
out steadily.

Caution:
a. When automatic telescoping mode is performed, the boom angle should exceed
70°;

b. The hook will also be lifted or lowered according to the crane's movements
“Telescope boom in or out”. Therefore, operate control lever to adjust the height
of hook during telescoping;

c. Carry out telescoping movements with maximum care and minimum speed. Do
not telescope boom with load;

d. Do not telescope the boom out when the boom is retracted. Initial telescope
movement after 2 seconds;

e. It is forbidden to drag the load diagonally;

Before carry out telescoping movement, check whether the block at the head of
telescopic boom is in contact with its adjacent telescopic boom tail completely. If
not, add washers to make them contact completely and ensure that the boom pin
and cylinder pin bear no force during the movement “Fully telescope boom in”.

4-48
1690-000-04Y

4.5.4 Lifting / lowering


The hoisting mechanism consists of hydraulic motor, balance valve, reducer, brake,
lowering limit switch, hoisting limit switch, wire rope, main hook, auxiliary hook and
so on.

The hoisting mechanism is divided into two parts: main winch and auxiliary winch.
The auxiliary winch is not fitted on slewing table during traveling. The control levers
to control main / auxiliary winch are fitted on right / left electrical control boxes in the
operator’s cab.

Reel off main winch Label on right control lever

Spool up main winch

Label on left control lever


Reel off auxiliary winch

Spool up auxiliary winch

4-49
1690-000-04Y

Speed of crane movements “Lifting the main winch” and "Lowering the auxiliary
winch” has 3 stages: high speed, normal speed and low speed.

Speed of crane movements “Lifting the auxiliary winch” and


"Lowering auxiliary winch” has 2 stages, normal speed
and low speed, which are activated via the slow gear rotary
switch (See the Fig. on right).

Auxiliary winch:
Normal speed:
The more the left control lever is pulled upward and downward, the faster the speed
will be.

Low speed:
Switch slow gear selective at right position “Slow gear”.
The speed "Spool auxiliary winch up" and “Reel auxiliary winch off" are controlled
slowly.

Main winch:
Normal speed:
The more the right control lever is pulled upward and downward, the faster the
speed will be.

Low speed:
Switch slow gear selective at right position “Slow gear”.
The speed "Spool auxiliary winch up" and “Reel auxiliary winch off" are limited
slowly.

High speed:
Switch off slow gear switch.
Pull the right control lever and press rapid speed button for main winch.
Speed “Spool main winch up” and “Reel main winch off” is increased.

The balance valve fitted in hoisting mechanism can not only ensure load lifted /
lowered steadily, but also stop load in any position.

If the boom works, wire rope may not be long enough with the boom telescoping out
and derricking up. Such problem can be solved by changing the reeving numbers of
wire rope. Before changing the reeving numbers, fit a hoisting limit switch weight.
As to the standard reeving numbers for various boom lengths, please refer to rated
lifting capacity table.

4-50
1690-000-04Y

Caution:
a. Choose proper reevings in accordance with boom lengths;

b. Under any conditions, there must be at least three windings of wire rope left on
the winding drum;

c. When a load is lifted away from the ground, it should first be suspended in the
air for a moment. Do not lift the load until the operator confirms that there is no
safety hazard. Do not derrick and telescope the boom if the load does not leave
away from the ground;

d. Do not change the control lever between “Spool up“ and “Reel off” jerkily. The
operator should return the control lever to neutral position and ensure the
winding drum has stopped before changing between “Spool up“ and “Reel off”.
Otherwise, the machine will be damaged;

e. The lifting equipment must be of enough strength;

f. The lifting capacity includes the mass of the hook and all lifting equipment.

4.5.5 Slewing
The slewing mechanism consists of hydraulic motor, planet-gear reducer, slewing
brake valve, slewing brake, driving gear, slewing ring and so on.

1. Slewing speed
The speed of the crane movement “Slewing”, varying between 0 and 1.5 r/min, is
controlled by the deflection of left control lever. The slewing speed has 2 stage,
normal speed and low speed, which can be activated by switching on the slow
gear switch. The low speed is of good jogging performance.

2. Slewing operation
Slewing movements can be activated by the deflection of the left control lever
fitted in the operator’s cab.

4-51
1690-000-04Y

Label on left control lever

Slew to the right

Slew to the left

Caution:
a. Ensure that the superstructure is unpinned before initiating the slewing
movement. Insert and secure the pin after finishing this operation;

b. Ensure that there are no obstacles in the crane slewing area and no person is in
the danger zone. Give a short warning signal (horn) before starting a crane
movement;

c. When slewing with a load, initiate the slewing movement very carefully, and
apply the brakes. It is prohibited to stop slewing movement or change slewing
direction jerkily;

d. Longer boom length - slower slewing speed;

e. Heavier load - slower slewing speed;

f. In order to ensure safe operation of new crane, the user must check bolts in
slewing ring to tightening torque of 1850 N.m after 100 operating hours. Then
check and tighten them after 300 operating hours. After that, do the checks every
500 hours.

g. The counterweight switch cannot be switched at right position


before slewing. Otherwise, the slewing control lever cannot
control the slewing movement. The slewing movement is
controlled by slewing switch on counterweight remote
control box.

4-52
1690-000-04Y

4.5.6 Rope reeving


Ensure that the following preconditions are fulfilled:
The outriggers have already been extended;
Boom has been fully telescoped in and turned to the side or rear working area.

1. Derrick boom down and place hook on the ground.

2. Remove the rope securing tubes.

3. Remove hoisting limit switch weight from wire rope.

4-53
1690-000-04Y

4. Remove the rope lock.

Press nipple

5. Change rope reevings.

Lower the hook while pulling out


the rope by hand.

Reeve rope through boom head pulley and hook pulley, and choose correct
reevings according to crane’s lifting capacity. Secure rope (even number reeving) in
the rope lock and rope (odd number reeving) in the hook.

Hoisting limit Hoisting limit


switch weight switch weight

Rope reeving is even number. Rope reeving is odd number.

Caution:
a. The hoisting limit switch weight should be fitted on the rope end to ensure the
hoist limiter switch in function;

b. Never wind wire rope on the winding drum disorderly.

4-54
1690-000-04Y

4.5.7 Simultaneous crane movements


The simultaneous crane movements, which can greatly improve the working
efficiency, refer to that the crane can carry out 2 movements simultaneously.
However, because the simultaneous crane movements are carried out towards two
different directions, the operator should take maximum care to avoid accident.

Ensure that the following preconditions are met when initiating simultaneous crane
movements:
Apply engine rapid gear;
Do not pull the control lever to limit position.

9 simultaneous crane movements are as follows:


1. Auxiliary winch + main winch

Reel off main winch


Reel off auxiliary winch

Spool up main winch


Spool up auxiliary winch

Left Right
control control
Main winch lever
lever
high-speed
button

Operate left control lever and right control lever at the same time according to the
above fig. to make auxiliary winch and main winch work simultaneously.

The more the control levers are pulled upward or downward, the faster the speed
will be.

Press “main winch high-speed button” with “slow gear switch” being switched off to
speed up the main winch without load.

Switch on “slow gear switch” to decease the speed of winches.

4-55
1690-000-04Y

2. Auxiliary winch + derricking

Reel off auxiliary winch


Derrick boom up Derrick boom down

Right control lever


Left control lever Spool up auxiliary winch

Changeover “derricking / telescoping selective switch” on left electrical control box


to “derricking”.

Operate left control lever and right control lever at the same time according to
above fig. to make auxiliary winch and derricking mechanism work simultaneously.

The more the left control lever is pulled upward or downward and right control lever
is pulled leftward and rightward, the faster the speed will be.

If “slow gear switch” is switched on, the speed of auxiliary winch and derricking
mechanism will become slow.

3. Auxiliary winch + telescoping

Reel off auxiliary winch


Telescope boom out
Telescope boom in

Spool up auxiliary winch


Left control lever

4-56
1690-000-04Y

Changeover “derricking / telescoping selective switch” on left electrical control box


to “telescoping”.

Operate left control lever and right control lever at the same time according to
above fig. to make auxiliary winch and telescoping mechanism (in manual mode)
work simultaneously.

The more the left control lever is pulled upward or downward and right control lever
is pulled leftward and rightward, the faster the speed will be.

Switch on “slow gear switch” to decrease the speed of auxiliary winch and
telescopic boom (in manual mode).

If automatic telescoping mode is set, to increase the speed of telescopic boom and
“slow gear switch” are invalid.

Caution:
Apply “Automatic mode” if telescoping movement is initiated!

4. Slewing + main winch


Reel off main winch

Slew to right
Slew to left
Spool up main winch

Left control lever


Main winch Right control lever
high-speed
button

Operate left control lever and right control lever at the same time according to the
above fig. to make slewing mechanism and main winch work simultaneously.

The more the control lever is pulled leftward and rightward, the faster the speed will
be.

Press “main winch high-speed button” with “slow gear switch” being switched off to
speed up the main winch.

4-57
1690-000-04Y

5. Slewing + telescoping

Slew to right Telescope boom out


Slew to left
Telescope boom in

Changeover “derricking / telescoping selective switch” on left electrical control box


to “telescoping”.

Operate left control lever and right control lever at the same time according to
above Fig. to make crane movements “Slewing” and “Telescoping” (in manual
mode) work simultaneously.

The more the control lever is pulled leftward and rightward, the faster the speed will
be.

Switch on “slow gear switch” to decrease the speed of slewing mechanism and
telescoping mechanism (in manual mode).

If automatic telescoping mode is set, to increase the speed of telescopic boom and
“slow gear switch” are invalid.

Caution:
Apply “Automatic mode” if telescoping movement is initiated!

6. Slewing mechanism + derricking mechanism

Slew to right
Derrick boom down

Slew to left Derrick boom up

4-58
1690-000-04Y

Changeover “derricking / telescoping selective switch” on left electrical control box


to “telescoping”.

Operate left control lever and right control lever at the same time according to
above fig. to make crane movements “Slewing” and “Derricking” work
simultaneously.

The more the control lever is pulled leftward and rightward, the faster the speed will
be.

Switch on “slow gear switch” to decrease the speed of slewing mechanism and
derricking mechanism.

7. Auxiliary winch + slewing mechanism

Slew to right + reel off auxiliary winch


Slew to left + reel off
auxiliary winch

Slew to right + spool up auxiliary winch


Slew to left + spool
up auxiliary winch

Deflect the left control lever between any two adjacent arrows with an angle of 45°
to make auxiliary winch and slewing mechanism initiate relevent movements (See
above fig.) simultanously.

The more the control lever is pull towrads an arrow, the faster the speed of the
corresponding movement will be, and the slower the speed of another movement.

Switch on “slow gear switch" to decrease the speed of the simultanously crane
movement.

8. Main winch + derricking mechanism

Reel off main winch + derrick boom down


Reel off main winch
+ derrick boom up

Spool up main winch + derrick boom down

Main winch high-speed


button

4-59
1690-000-04Y

Deflect the right control lever between any two adjacent arrows with an angle of 45°
to make main winch and derricking mechanism initiate relevent movements (See
above fig.) simultanously.

The more the control lever is pull towrads an arrow, the faster the speed of the
corresponding movement will be, and the slower the speed of another movement.

Press “main winch high-speed button” without “slow gear switch" being switched off
to speed up main winch.

9. Main winch + telescoping mechanism

Reel off main winch + telescope Reel off main winch + telescope boom out
boom in

Spool up main winch + telescope boom out


Spool up main winch +
telescope boom in

Main winch high-speed button

In manual mode, deflect the right control lever between any two adjacent arrows
with an angle of 45° to make main winch and telescoping mechanism initiate
relevent movements (See above fig.) simutanously.

The more the control lever is pull towrads an arrow, the faster the speed of the
corresponding movement will be, and the slower the speed of another movement.

Press “slow gear switch” to make all movements slower.

Press “main winch high-speed button” without “slow gear switch" being switched off
to speed up main winch.

If automatic mode is set, the movement “Telescope boom in / out” and “slow gear
switch” are invalid.

Warning:
Carry out simultaneous crane movement without taking a load or with the load
being lifted away from ground. It is prohibited to telescope boom with load.

4-60
1690-000-04Y

4.5.8 Central lubricating system


The crane superstructure is equipped with an advanced 24V central lubricating
system. All the lubricating points are automatically supplied with the correct grease
quantity via progressive distribution valve. After power switch is switched on, the
pumps begin to supply grease to greasing points according to specified lubrication
interval.

A lubrication interval consists of pumps running interval and their running time.
Once the interval achieves to set value, the pumps will not stop running until they
finish their work. The greasing procedure is repeated.

In addition, the central lubricating switch is fitted on the electrical


control panel in operator’s cab. Once the switch is pressed, the
central lubricating system begins to add grease to lubricating points
automatically.

For detailed lubricating points, refer to following illustration:

4-61