You are on page 1of 4

• Evening shutdown 23-59

Well control and well is safe

Work area is safe brake is secure

Fluid level pit levels.

Switch off lights

Diesel / fuel levels

Last shift operation

Complete report and signed closed

Bleed pressure off the BOP

Winter / protect mud tank and system

Bleed off air pressure

Hand over to night guard information and Keys

Lock away tools


• Morning start 07-59
Read the previous report

JSA Pre start safety meeting PPE and have coffee / tea…. Beer!!!

Verify engine / oil water/ gear box/ compressor

Drilling line is OK

Check safety systems.

Rotation equipment grease and oil

Start engine

Run equipment

Check crown saver system

Check well pressure….

Start and pressure up HPU BOP

Check pump piping to well to verify damage

Verify clutches

Visual check (CAT 1) of lifting tools

Fuel

Verify hydraulic tong / hoses and operation

Electrical system and equipment

Earth wires

Start compressor and drain off water from receiver

Read the program

Look ahead at program

Verify / notice of changes during the night.


Daily walk round

Show your route.


Rig

Line de Curgere

Acces
Pompa
elecricicatate

Cabina

You might also like