A partial, static, and/or not updated Create, configure, customize, and Network analysis includes a powerful set of Monitor and predict system behavior Quickly identify and synchronize project
view of the network. manage your electrical system model analytical tools empowering design, using real-time data from smart meters or changes from multiple engineers through
for engineering analysis and power planning, simulation and optimization of eSCADA. Quickly determine root-cause NetPM™
systems operation. power systems utilizing an intelligent one- of outages and disturbances using
line diagram and the flexibility of a multi- forensic analysis solutions and Data collection and project updates from
✓ Build Faster dimensional database. historical data stored in ETAP Playback. etapAPP™ or an engineering workstation
✓ Manage Quicker are simultaneously reflected on the main
✓ Share Easier ✓ Analysis and Optimization ✓ Operate with design knowledge model; approved updates are broadcasted
✓ Operate Intelligently ✓ Automated protection and coordination ✓ Design with operation knowledge to selected users.
✓ Arc Flash Safety, Arc Fault ✓ Prevent system interruption
✓ Renewables & Energy storage ✓ Accelerate operator training ✓ Accelerate project schedules
✓ Dynamics & Transients ✓ Streamline information sharing
✓ Grid code compliance
✓ Electrical digital twin Electrical digital twin chapter in the EcoStruxure Specification tool, content to be adapted and deployed locally
o Intelligent single line diagram ETAP Base license, can be used by Consultants or end users to view/design or update their intelligent single line diagrams
o Network Model Management ETAP’s collaborative engineering platform, suitable for all sizes of projects and valuable for global design firms to drive s tandardization & quality assurance
o Protection coordination & Short ✓ Allow to digitally view and browse the SLD and its properties (Equipment nameplate & data
✓ Compliance: Compliance with codes
Circuit study sheet information)
and standards with an updated SLD
o Load flow analysis ✓ Track revision of the model in a multi-dimensional database through SE remote support for model
o Arc Flash study
✓ Simplify change management by leveraging the digital model and provide Power System updates
calculations
o Reliability studies
✓ Support root cause analysis ✓ OPEX Savings: Reduces operating
o Harmonic analysis ✓ Include a simulation engine to simulate the behaviour of the power system expenses across engineering, data
o Motor starting studies ✓ Include a brand agnostic verified and validated library of equipment collection, downtime costs and more
o Renewables/ Grid integrations ✓ Propose an interface to be connected to real time measurement from the field devices or from
studies any energy and monitoring control system ✓ Opportunity for Greater Connectivity:
✓ Allow simultaneous co-engineering and sharing of database among different stakeholders with Provides foundation for digital
transformation through extending
customizable access rights
o Real time power system monitoring & analysis by connection to
monitoring and simulation The Intelligent single line diagram must be developed using the latest version of the ETAP software to SCADA to unlock advanced features
(PSMS) ensure design consistency and maintain a single source of truth for the electrical design across the
o Operator training simulator
project lifecycle.
(eOTS)
o Enterprise Protection Asset
Management (eProtect)
Circuit study
✓ Make recommendations to the Company to mitigate the effect of arc flash ✓ Instant determination of the arc flash
o Load flow analysis
protection boundary
o Arc Flash study ✓ Specify PPE(Personal Protective Equipment)
o Reliability studies ✓ Provide instruction to staff and contractors on the procedures and PPE to be worn for defined tasks ✓ Determine individual arcing current
o Harmonic analysis and provide easily understood written instructions contributions
o Motor starting studies
✓ Generate arc flash labels for every incoming main circuit breaker cubicle, load circuit breaker, & ✓ Generate arc flash labels for every
o Renewables/ Grid integrations motor starter bucket incoming main circuit breaker cubicle, load
studies circuit breaker, & motor starter bucket
o Real time power system The model will be created in ETAP and will be used to carry out an arc flash analysis based on the
monitoring and simulation recommended overcurrent settings from the protection study carried out. If alternative settings are
(PSMS)
recommended the arc flash analysis will also be completed for the new settings.
o Operator training simulator If the arc flash analysis shows significant hazards the use of arc flash detection & protection
(eOTS) equipment will be considered to reduce the risk.
o Enterprise Protection Asset
Management (eProtect)
o Intelligent single line diagram A key part of power system design involves considering service reliability provided by any proposed ✓ All-in-one software Simulating harmonic
current and voltage sources, determining
o Network Model Management system and service reliability requirements of loads to be supplied.
system harmonic impedance and reporting
harmonic voltage and current distortion
o Power System studies: limit violations
Based on the existing failure rates and outage duration times, the objective of this study is to evaluate
o Protection coordination & Short
the probability of electrical components in performing their intended purpose adequately during the ✓ Protect equipment lifetime identifying
Circuit study harmonic problems
system lifetime and under the various operating conditions encountered. The statistical availability of
o Load flow analysis different subsystems within the electrical system is determined.
o Arc Flash study ✓ Secure plant runtime reducing nuisance
o Reliability studies trips
o Harmonic analysis Reliability indices are calculated, displayed on single line and reported graphically to evaluate the
reliability of a power distribution system and to provide useful planning information regarding ✓ Mitigate power quality issues designing
o Motor starting studies
and testing harmonic filters
o Renewables/ Grid integrations
improvements to existing systems and the design of new power systems.
studies
Dynamic performance studies using the scope above shall be carried out for Motor Control Centres ✓ Full consideration of factors such
o Real time power system that have highly rated induction motors that have long starting or ‘run-up’ times, i.e. high inertia loads as substations, source impedances,
monitoring and simulation such as gas compressors, large fans. The emphasis should be on the direct-on-line (DOL) starting of and detailed line models
(PSMS) motors from zero to full-load speed and on the volt-drops that occur in the network during the run-up
o Operator training simulator period.
(eOTS) Motor nameplate should be produced as a part of the report.
o Enterprise Protection Asset
Management (eProtect)
Management (eProtect)
Customer Benefits
• Single Pane view for overall Electrical Control System.
• Future proof solution, based on latest industry standards
• Interoperable with third party equipment (e.g. SEL)
• Cyber Secure
• One vendor – SE Hardware & Software