PAKET 1A PEKERJAAN SOIL INVESTIGATION SECTION 1 500 KV TRANSMISSION LINE FEL 2 CONCEPT PHASE: PROFESSIONAL SERVICES FOR MENTARANG INDUK HEP POWER
JOB DESCRIPTION :
EVACUATION SYSTEM STUDY
DATE : JANUARY - MARCH 2023
LOCATION : MALINAU - BULUNGAN, KALIMANTAN UTARA
A. PREPARATION
Scratched and Wounded while Preparing Make sure to follow the correct procedures, and
D Often Occured 4 Major D-4 Extreme B Rarely Occured 2 Minor B-2 Low
Equipments always wear the appropriate safety clothing
Muscle Injury when Lifting / Lowering DCPT Don't rush, and always pay attention to body
D Often Occured 4 Major D-4 Extreme B Rarely Occured 2 Minor B-2 Low
(Sondir) Equipment position when lifting and lowering equipment.
Equipments Hit Other Personnnels C Might be Occured 4 Major C-4 High Good communication and ensure safe distance. A Hardly Occured 2 Minor A-2 Low
B. WORK EXECUTION
Personnel Hit by a Hoe while Site Preparing C Might be Occured 5 Fatal C-5 Extreme Good communication and ensure safe distance. A Hardly Occured 3 Intermediate A-3 Moderate
C. WORK COMPLETED
Personnel Hit by the Equipments C Might be Occured 5 Fatal C-5 Extreme Good communication and ensure safe distance. A Hardly Occured 3 Intermediate A-3 Moderate
MATRIX OF RISK
Might be
C Low Moderate High High Extreme
Occurred
1 2 3 4 5
IMPACT LEVEL