Professional Documents
Culture Documents
Operation Establish
Operation Establish
Individual Directive
OVERT
Authored by – Commander of Task Force 317
Aim: To make St Helena operable for launching ships and aircraft for
the Falkland war
Plan of Action –
The main purpose of this directive is to set St. Helena up so that it can
act as a launching pad for ships, especially after the accident in the
Ascension Islands rendered the ports and the airways inoperable;
The HMS Cardiff, RMAS Typhoon and the SS Uganda should set sail from
the port of Plymouth, England carrying road and airway building
equipment;
SS Uganda which is a medical ship will carry the two hundred workers to
the St. Helena for the construction;
The HMS Cardiff will be carrying three road rollers and a two tonne
container containing molten tar;
The lowland area lying to the south of the hills will be cleared of all
civilian settlements and they will relocated to the northern part of the
island;
Shortly after the three ships reach the island, the container ship SS
Atlantic Conveyer will carry the rest of necessary equipment needed to
make St. Helena a launching pad.
Expected Outcome:
Constructing two airfields, a wartime emergency port (WEP) and a lone
jetty (for docking smaller ships and trawlers).
Signed –
Commander of Task Force 317