ORO OXYGEN CORPORATION

Plant Address: _____________________________________________


STORAGE TANK PREVENTIVE MAINTENANCE CHECKLIST
FOR THE MONTH OF ________/ Year _______

DATE
PARTICULARS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
A. DAILY CHECK UP
1. Dust, cubwebs, and dirt removal
2. Checking Liquid Temperature
Reading Acccuracy
3. Checking Vapour Temperature
Reading Acccuracy
4. Checking Pressure Gauge Reading
Acccuracy
5. Leak visual inspection
6. Panel visual inspection
7. Battery voltage
8. Slip tube checking
Checked By:

B. WEEKLY CHECK UP
1. Grass Cutting
2. Observe leakage from gauges
Checked By:

Remark/s:

Prepared By: Noted By:

Plant Supervisor Plant Production Manager