You are on page 1of 2

BEECHCRAFT

BARON S8P AND BARON S8TC


MAINTENANCE MANUAL

CHAPTER 54

LIST OF PAGE EFFECTIVITY

CHAPTER
SECTION
SUBJECT PAGE DATE
54-EFFECTIVITYICONTENTS
Nov 30176
54-00-00
201 Nov 30176

CHAPTER 54 - NACELLESIPYLONS

TABLE OF CONTENTS

CHAPTER
SECTION
SUBJECT SUBJECT PAGE

NACELLES 54-00-00
Maintenance Practices 201
Inspection, Cleaning, and Painting Steel
Rivets in the Nacelle Firewall 201

"END"

54-EFFECTIVITY/CONTENTS
Page 1
Noy 30/76
BEECHCRAFT
BARON S8P AND BARON S8TC
MAINTENANCE MANUAL

NACELLES - MAINTENANCE PRACTICES NOTE

INSPECTION, CLEANING, AND PAINTING STEEL The rivets must be thoroughly cleaned before the
RIVETS IN THE NACELLE FIREWALL protective coatings are applied Wipe the areas to
be coated with a clean cloth until no residue can
a. Gain access to the forward side of the firewall by be removed
removing the engine cowling
b. Inspect the steel rivets in the forward and aft side of d. Paint the rivet heads completely with epoxy-
the nacelle firewall for condition polyamide primer MIL-P-23377C
c. If rust is present on the steel rivets. remove the rust e If the rivets are rusted out or can not be cleaned
using sandpaper, metal wool or wire brush. Wash rivet heads effectively, drill out the steel rivets and install Monel rivets
with Naphtha (20, Chart 207, 91-00-00) and wipe dry with a (MS20615-M4)
clean cloth f Install engine cowlings

"END"

54-00-00
Page 201
Nov 30/76

You might also like