1. What are the differences between Economic load dispatch and economic scheduling?
Economic Load Dispatch (ELD) and Economic Scheduling are both techniques used in power system
operation to optimize the use of available resources and minimize the cost of generating electricity.
However, there are some differences between the two concepts.
• Definition:
Economic Load Dispatch (ELD) refers to the process of allocating the power output among available
generating units in a power system in a way that meets the load demand at minimum operating cost,
subject to operational constraints such as ramping limits, minimum and maximum generation limits,
and transmission system limitations.
On the other hand, Economic Scheduling is a broader term that encompasses all the activities related to
the optimization of power generation scheduling and dispatch. It includes not only ELD but also other
aspects such as unit commitment, reserve management, and demand response.
• Scope:
ELD is primarily concerned with the allocation of power output among generating units that are already
online and operational, i.e., it deals with the dispatch of available resources. In contrast, Economic
Scheduling involves a more comprehensive approach that considers the entire power system, including
the scheduling of maintenance, the planning of investments in new generation capacity, and the
integration of renewable energy sources.
• Time horizon:
ELD is typically performed on a short-term basis, such as every 5 minutes to an hour, to ensure that the
supply of electricity matches the demand in real-time. Economic Scheduling, on the other hand, is
performed on a longer-term basis, such as daily, weekly, or monthly, to ensure that the power system
is optimized for longer periods.
In summary, Economic Load Dispatch is a subset of Economic Scheduling that deals with the dispatch
of available resources to meet the load demand at minimum cost on a short-term basis. Economic
Scheduling, on the other hand, is a broader concept that includes ELD as well as other activities related
to the optimization of power generation scheduling and dispatch on a longer-term basis.
2. What is the difference between unit commitment and economic load dispatch?
Unit commitment (UC) and economic load dispatch (ELD) are two important techniques used in power
system operation to ensure the efficient and reliable delivery of electricity. While both techniques are
related to the scheduling and dispatch of power generation, there are some key differences between
them.
• Definition:
Unit commitment refers to the process of deciding which generating units should be online and available
to meet the forecasted demand over a specified time horizon, subject to operational constraints and
system reliability requirements. Unit commitment involves deciding when to start up or shut down
generating units and how much output to allocate to each unit.
Economic load dispatch, on the other hand, refers to the process of allocating the power output among
available generating units in a power system in a way that meets the load demand at minimum operating
cost, subject to operational constraints such as ramping limits, minimum and maximum generation
limits, and transmission system limitations.
• Time horizon:
Unit commitment is typically performed on a longer-term basis, such as daily or weekly, to ensure that
the power system has enough capacity to meet the forecasted demand while maintaining system
reliability. Economic load dispatch, on the other hand, is typically performed on a shorter-term basis,
such as every 5 minutes to an hour, to ensure that the supply of electricity matches the real-time demand.
1
Power System Operation: Economic load dispatch, economic scheduling, unit
commitment, optimal power flow
• Scope:
Unit commitment involves decisions about which generating units to start up or shut down and how
much output to allocate to each unit over a specified time horizon. It takes into account factors such as
startup and shutdown costs, ramping rates, minimum and maximum generation limits, and system
reliability requirements. In contrast, economic load dispatch is concerned with the allocation of power
output among available generating units that are already online and operational, subject to operational
constraints. It determines the optimal output levels for each unit to meet the real-time demand at
minimum operating cost.
In summary, unit commitment and economic load dispatch are both important techniques used in power
system operation to optimize the scheduling and dispatch of power generation. However, unit
commitment is focused on the longer-term planning of which generating units to start up or shut down
and how much output to allocate to each unit, while economic load dispatch is focused on the shorter-
term allocation of power output among available generating units to meet the real-time demand at
minimum operating cost.
3. What are the differences between unit commitment and optimal power flow?
Unit commitment (UC) and Optimal Power Flow (OPF) are two important optimization techniques used
in power system operation to ensure the efficient and reliable delivery of electricity. While both
techniques are related to the scheduling and dispatch of power generation, there are some key
differences between them.
• Definition:
Unit commitment refers to the process of deciding which generating units should be online and available
to meet the forecasted demand over a specified time horizon, subject to operational constraints and
system reliability requirements. Unit commitment involves deciding when to start up or shut down
generating units and how much output to allocate to each unit.
Optimal Power Flow, on the other hand, is a mathematical optimization technique used to determine
the optimal dispatch of active and reactive power in a power system, subject to operational constraints
such as voltage limits, transmission line limits, and generator operating limits. OPF aims to minimize
the overall system cost while maintaining the system's stability and reliability.
• Scope:
Unit commitment is concerned with the long-term scheduling and dispatch of power generation,
typically on a daily or weekly basis. It takes into account factors such as startup and shutdown costs,
ramping rates, minimum and maximum generation limits, and system reliability requirements.
In contrast, optimal power flow is concerned with the real-time optimization of the dispatch of active
and reactive power in a power system. It takes into account factors such as generator operating limits,
transmission line limits, voltage limits, and reactive power support requirements.
• Time horizon:
Unit commitment involves long-term planning of which generating units to start up or shut down and
how much output to allocate to each unit over a specified time horizon. It is typically performed on a
daily or weekly basis.
Optimal Power Flow, on the other hand, involves real-time optimization of the dispatch of active and
reactive power in a power system. It is typically performed on a much shorter time horizon, such as
every 5-15 minutes.
In summary, Unit commitment and Optimal Power Flow are two important optimization techniques
used in power system operation. However, Unit commitment is focused on the longer-term planning of
which generating units to start up or shut down and how much output to allocate to each unit, while
Optimal Power Flow is focused on the real-time optimization of the dispatch of active and reactive
power in a power system to minimize the overall system cost while maintaining the system's stability
and reliability.
2
Power System Operation: Economic load dispatch, economic scheduling, unit
commitment, optimal power flow
3
Power System Operation: Economic load dispatch, economic scheduling, unit
commitment, optimal power flow
requirements, such as minimum and maximum generation limits, ramping limits, startup and shutdown
costs, transmission system limitations, and reserve requirements. The solution to the UC problem
provides the optimal schedule of power generation for each generating unit in the power system over
the specified time horizon, which can be used by the system operator to dispatch power generation in
real-time.
UC is an important tool for power system operators to ensure the efficient and reliable delivery of
electricity over a longer time horizon, such as a day or a week, while minimizing operating costs and
maintaining system reliability. It takes into account factors such as the availability of generating units,
their operating costs, and the expected load demand over the specified time horizon. UC is typically
performed on a longer-term basis than ELD or OPF and provides a more comprehensive view of the
power system operation over a longer time horizon.