TATA PROJECTS LIMITED, SERVICES SBG-IPMS

PROJECT: Orange Estella

Document No: TPL/IPMS/SAFETY/BBM CL/017 Rev:00

BAR BENDING MACHINE CHECK LIST

S.NO DESCRIPTION YES/NO


1 Erected in a firm base concrete platform.
2 Machine is grouted properly/ Base wheel stopper provided
3 Double Body Earthing is provided
4 D.B box connected with the machine is equipped with ELCB with 30mA.
5 Emergency switch is available in working condition ( Front side and back side of the
m/c)
6 Power on & off switch with indicator light are available in working condition.
7 Belt and other internal moving parts are covered/Guarded.
8 No oil leakage
9 Both side hand guard is available.
10 Limit switch (Both Side, below the job plate) are in working condition
11 Availability of standard limit switch lock pin. (Usage of nail & other material is
Not acceptable)
12 Rubber mat provided in front of the machine

Contractor PMC Client

Name Pankaj Pardhan Mohd Gousuddin

Designation P&M Incharge EHS Incharge

Signature

Date

Bar Bending Machine check list- TPLIPMSSAFETYBBM CL 017 Rev 00 Dt:26.06.2019