This document is a checklist from Utkal Alumina International Ltd for inspecting portable grinding machines. The checklist contains 15 check points to inspect items like body covers, wheel guards, electrical cables, earthing, plug tops, wheel RPM, safety equipment for operators, insulation, grinding wheel condition, tool handles, and other observations. Spaces are provided to record inspection results for multiple machines and any remarks.
This document is a checklist from Utkal Alumina International Ltd for inspecting portable grinding machines. The checklist contains 15 check points to inspect items like body covers, wheel guards, electrical cables, earthing, plug tops, wheel RPM, safety equipment for operators, insulation, grinding wheel condition, tool handles, and other observations. Spaces are provided to record inspection results for multiple machines and any remarks.
This document is a checklist from Utkal Alumina International Ltd for inspecting portable grinding machines. The checklist contains 15 check points to inspect items like body covers, wheel guards, electrical cables, earthing, plug tops, wheel RPM, safety equipment for operators, insulation, grinding wheel condition, tool handles, and other observations. Spaces are provided to record inspection results for multiple machines and any remarks.
1 Condition of body covers / Electrical Insulation
2 Provision of Wheel-guard
3 Provision of three core Electrical cable
Coloured insulation of the internal wires not showing 4 from outside Card grip holding the outer covering (Sheath) of the 5 cable tightly
6 Cable free from signs of damage ( Cuts or abrasion )
7 Provision of Earthing
8 Provision of Electrical Plug Top
Outer covering (Sheath) of the cable tightly gripped 9 where it enters the Plug
10 Wheel RPM matching with machine RPM
Availability of Face Shield/Safety Goggles and Gloves 11 for grinder Power tool is double insulated with proper symbol 12 marked . Grinding wheel condition and Ring test performed for the 13 defect in grinding wheel
14 Training imparted to the operator .
15 Handle condtion of powr tools
15 Other specific observed .
OTHER POINTS IF ANY :
Signature of Safety officer Signature of PA/ P&M Representative
LTD CHINE
me of cont- Date- /C-18 Rev.- 00,Effective Date: 10.03.2013