MACHINE Issue. Date 08-12-2018 Rev. Date 00-00-00 Page No. 1
Name of Site / Location : Date :
Inspected by: Work Area :
Name of Contract agency :
SR NO POINTS OF INSPECTION YES NO NS REMARKS
] Welding machine is of ISI mark and certified 2 Satisfactory physical condition of machine 3 Fuse are in place 4 Starter switch “ON” & “OFF” functioning 5 Output terminal is in good condition 6 Voltage Regulator functioning & in good condition 7 Body frame is compact / no frame opening 8 Power incoming cable is in good condition 9 Earthling connection is proper Electric connection through proper Industrial Plug 11 and Socket 12 Double insulated 3core and above cable
13 Power cable is Cracks / Cut / Damage free
Nut / bolt or Clamp or Lugs used to tighten welding 14 & grounding cable 15 Cable is of appropriate rating
16 Color of welding cable is orange
17 Color of return cable is black
Power cable and Welding cable are not overlap with 18 each other Joints in power cable with MS junction box or 19 Proper jointing Kit 20 Inspection label available on machine