You are on page 1of 1

ASHUGANJ SARAIL

TYPE-3
Ch 76+240
20.0
Ch 75+500

Ch 75+810

Ch 76+000

Ch 76+250
MEDIAN OPENING

0
5.

Ch 76+560

Ch 76+860
R1 20.0 100.0 100.0 20.0
Ch 76+250

Ch 76+570

Ch 76+880

Ch 77+000
TYPE-3
Ch 77+490
5.0
R1

20.0
Ch 77+000

Ch 77+750
MEDIAN OPENING
20.0 100.0

REV. NO: DATE DESCRIPTION PROJECT NAME:


JUNCTIONS / INTERSECTIONS /
MEDIAN OPENINGS / IMPROVEMENT OF ASHUGANJ
R0 23-10-2021
SEPARATOR OPENINGS TO SARAIL OF DHAKA-SYLHET
HIGHWAY AS 4-LANE NATIONAL
Client: APPROVED BY: CHECKED & PREPARED BY: DRAWING TITLE : HIGHWAY ROAD
SUBMITTED BY:
Government of the People's Republic of PMC (CH:73+240 TO 84+800)
Bangladesh Ministry of Road Transport SCHEDULE OF JUNCTIONS /
INTERSECTIONS / MEDIAN OPENINGS / DRG REF NO:
and Bridges JV OF RITES & MEPC. SEPARATOR OPENINGS DRAWING NO: WP-01/AS/HW/SJMO-02

You might also like