You are on page 1of 1

ASHUGANJ SARAIL

TYPE-3
Ch 80+180
.0

Ch 80+480

Ch 80+600
5
R1 100.0 20.0

20.0

20.0
Ch 80+000

Ch 80+585

Ch 80+750
MEDIAN OPENING

Ch 81+060

Ch 81+195
20.0 100.0
Ch 80+750

Ch 80+990

Ch 81+000

Ch 81+500
MEDIAN OPENING
Ch 81+683

20.0 100.0 100.0 20.0 100.0 20.0 20.0 100.0


Ch 81+665
Ch 81+500

Ch 82+000

Ch 82+250
MEDIAN OPENING
20.0 100.0 100.0 20.0

REV. NO: DATE DESCRIPTION PROJECT NAME:


JUNCTIONS / INTERSECTIONS /
MEDIAN OPENINGS / IMPROVEMENT OF ASHUGANJ
R0 23-10-2021
SEPARATOR OPENINGS TO SARAIL OF DHAKA-SYLHET
HIGHWAY AS 4-LANE NATIONAL
Client: APPROVED BY: CHECKED & PREPARED BY: DRAWING TITLE : HIGHWAY ROAD
SUBMITTED BY:
Government of the People's Republic of PMC (CH:73+240 TO 84+800)
Bangladesh Ministry of Road Transport SCHEDULE OF JUNCTIONS /
INTERSECTIONS / MEDIAN OPENINGS / DRG REF NO:
and Bridges JV OF RITES & MEPC. SEPARATOR OPENINGS DRAWING NO: WP-01/AS/HW/SJMO-04

You might also like