You are on page 1of 41

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Premier Tech Chronos Ltd.


Weighing Solids Handling & Process Control
93 Moo. 9 Bangna-Trad Km.19 Road, Tambol Bangchalong,
Amphur Bangplee, Samutprakarn 10540, Thailand.
Tel.:+66 (0) 27405001

potential declarations
commission power supply/preliminary fuse 380 V AC 50Hz
CAE-No. nominal power/-current 15A
Version SP1905016-01-C control voltage(s) 24 VDC

conductors cross sections min[sq. mm copper]


configuration SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp (correspondend to VDE 0113-1. IEC/EN 60204-1)
(see also schemes of terminal blocks)
main current power supply
motor circuit
1st customer FATIMA FERTILIZERS LTD. control-circuit
1st final customer FATIMA FERTILIZERS LTD. instrument circuit

wiring colours (VDE 0113-1. IEC/EN 60204-1)


L1, L2, L3 black
PE green-yellow
number of sheets 41 N light-blue
construction 11/11/2013
15/02/2016 control voltage AC red
modification 08/07/2019 control voltage DC blue
instrument leads brown
external voltages orange

wiring special notes


the wiring is done with flexible wires.
the wiring is done in accordance with the wiring diagram from up left side to down right side.
protection control panel IP55
all connections are done in accordance with the VDE 0113/1 norm. isolator switch left door right others
regulations VDE...................................................]
wire numbering no yes spec.environment no
all wires connecting to terminals will get terminal number as their own. yes
the group numbers are preceding the wire numbers. PLC no yes
the priority of the wire numbers depends on the wiring arrangement. service board no yes
bus system no yes

copyright remark
The copyright of this drawing will remain with BMH Chronos Richardson Gmbh. It is entrusted only for the agreed purpose and not be used for any other than the agreed purpose.
The drawing must not be copied nor reproduced without our prior written consent. This also includes storage. treatment and dissemination by use of electronic systems.
Except for the agreed purpose. originals or reproductions must not be made accessible to third parties. especially to competitors.

issue CAE-No. page text drawing-No. following page page


Cover sheet SP1905016-01-C 2 1
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
11/11/2013 RACP = + 41
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

regulations
- earth the installation according to regulations valid on site!
- VDE 0113, IEC/EN 60204-1:
if control circuit is not earthed, remove link drawn in - provide leakage protective system!
- all metallic housings have to be connected with grounding circuit!
- the number of connectors given for the cables are always without the ground wire!

group key
identification number to classify an installation into technological and organizational components.

site key
identification number to classify physical sites within one group.
the site key number numerically corresponds to the group key.

expanded site key


the expanded site key determines the positioning of the control equipments more detailed.

voltage key
the digit following X for separation of terminals with different potentials.

remarks
due to the modular conception of the installations, the sheets are not consecutively paginated.
the installations with intrinsic security correspond to the VDE 0170/0171/165-1, IEC/EN 50014/60079-14 norm.
the text relating to circuit path refer to the active condition of the complete circuit path!

W1 and W2 are defined as external cable connections.


= external terminals W1 = main feed line
W2 = represents all cables leading to points at site (without main feed line)

issue CAE-No. page text drawing-No. following page page


Installation Coversheet SP1905016-01-C 3 2
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
11/11/2013 RACP = + 1 41
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

the plan specifies all components according to DIN.

a complete specification consists of:


identification 1 = group
identification 2 + site
identification 3 - number / kind / number
identification 4 : connection

identification 1 and 2 are always mentioned in the heading of the drawing in the area "group key" resp. "site key"
and refer to all components of this page if no other identification is mentioned.
identification 3 is listed on the left side before the symbol concerned, identification 4 is written on the right hand side after.

the controls of the installation are installed in the control panel.


an installation can consist of different lines and groups.

a line is part of an installation with a self-contained product flow


( i. e. from product placed at disposal => SILO up to bagging => conveyor).

lines are distinguished by letters!

a group is a technological part of a line.

groups are distinguished by digits!

in order to clearly separate voltage potentials, voltage identification numbers are determined.
these identification numbers follow DIN identification letter X.

issue CAE-No. page text drawing-No. following page page


Explanation Of Abbreviated Words (Electro) SP1905016-01-C 4 3
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
11/11/2013 RACP = + 2 41
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

=2 + G 2 - 14 S 23 . 1
=4 + 4 - 1 x 1
groupe key (technological component)
expanded site key (detailed statements to site)
site key (physical site)
page of circuit diagram (resp. count number at comp. key "X")
component key
circuit path (resp. voltage key at comp. key "X")
circuit path key (not used at comp. key "X")

group key
identification number to classify an installation into technological and organizational components.
=000 general informations
=0 power supply (control panel) =4 filling machine =8 bag handling =CABL cable diagrams
=1 material feeding =5 bag placer =9 closing unit =TRML terminal diagrams
=2 weigher =6 bag transfer =10 conveying =PLST parts lists
=3 evacuation, hopper =7 top-up
note 1: if the same component exists in the installation line more then one time. a letter is added for its identification within the group key (letters to start with A).
i.e.=2A 1st weigher =2B 2nd weigher
=4A 1st filling machine =4B 2nd filling machine
=5A 1st placer =5B 2nd placer
note 2: if there are some installation lines in the installation. a letter is send on before for its identification within the group key (letters to start with A).
i.e. =A2A 1st line 1st weigher =A2B 1st line 2nd weigher
=A4A 1st line 1st filling machine =A4B 1st line 2nd filling machine
=A5A 1st line 1st placer =A5B 1st line 2nd placer
=B2A 2nd line 1st weigher =B2B 2nd line 2nd weigher
=B4A 2nd line 1st filling machine =B4B 2nd line 2nd filling machine
=B5A 2nd line 1st placer =B5B 2nd line 2nd placer

site key
identification number to classify physical sites within one group.
the site key number numerically corresponds to the group key.
(site = physical site)
+0 control panel +4 filling machine +8 bag handling
+1 material feeding +5 bag placer +9 closing unit
+2 weigher +6 bag transfer +10 conveying
+3 evacuation, hopper +7 top-up

issue CAE-No. page text drawing-No. following page page


Abreviated Words (Electro) According To DIN 40719 Part I SP1905016-01-C 5 4
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
11/11/2013 RACP = + 3 41
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

expanded site key


the expanded site key determines the positioning of the control equipments more detailed.
T - installed in control panel door
D - installed in terminal box cover
G - installed in control box

circuit plan page


page of diagram showing the component.
note: terminal blocks and boxes have a count number (starting with 1).
sub-terminal boxes are distinguished by the count number and a digit after a point.

component key
letter according to DIN.

circuit path
circuit path within the diagram showing the component.
note: terminal blocks and boxes have a voltage key:
1 - mains voltage 3 - control voltage 5 - thermistors
2 - auxiliary voltage 4 - intrinsically safe 6 - potential free

circuit path key


if the same component exists more then one time within the circuit
path. it is numbered with a digit after a point.

issue CAE-No. page text drawing-No. following page page


Abreviated Words (Electro) According To DIN 40719 Part II SP1905016-01-C 6 5
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
11/11/2013 RACP = + 4 41
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Revision Date Name Approved Description

SM13-00074-01-C
SP1905016-01-C 09-07-2013
08/07/2019 RACP New systec controller

issue CAE-No. page text drawing-No. following page page


Revisions SP1905016-01-C =000+0/14 6
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
11/11/2013 RACP = + 5 41
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

755

MP1

250 mm
228 mm

400 mm
188 mm
IT8000ET

500 mm

580 mm
counter cut out 29.5x55
755

38 mm
ø
5m
m

80 80 80 80 80


22
.5
mm

issue CAE-No. page text drawing-No. following page page


Front control panel layout SP1905016-01-C 15 14
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = 000 +0 =+/6 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

755

MP1

250 mm
228 mm

400 mm
188 mm
IT8000ET

500 mm

580 mm
counter cut out 29.5x55
755

Installation stream regulator hammer vibrator bag release


on out in out in delay timer fault
man. auto

emergency stop

issue CAE-No. page text drawing-No. following page page


Mounting element in the control panel door SP1905016-01-C =0/1 15
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = 000 +0 14 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

General datas for group =0

Terminal blocks and plug boards of group =0

=0+0-1x1 = Terminal block in control panal (main voltage)

=0+0-1x3 = Terminal block in control panal (control voltage)

issue CAE-No. page text drawing-No. following page page


General datas for group =0 SP1905016-01-C 2 1
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =0 +0 =000/15 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

L4 / =2/2.3

L5 / =2/2.3

L6 / =2/2.3

1 3 5
2Q18
0.25-1 A
3RV1011-0JA10
I> I> I>
2 4 6

1 3 5
2Q4 L1 L2
2 4 6 25 A 2G18 3
Isolator Switch QUINT 24 VDC/5 A

L+ M

4mm. BK

2F18
6A

PE1:1 PE-bar

-1X1 L1 L2 L3 N PE

+24VDC 0V
3.3 3.3
L1 L2 L3 N PE
Customers control
Current supply for
Power supply control voltage
3x380V /50 Hz /15Amp /N/ PE

issue CAE-No. page text drawing-No. following page page


Power supply SP1905016-01-C 3 2
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =0 +0 1 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

2.18 / +24VDC

+24VDC
5.3

5.3 =2/3.3 =4/2.3


=0-:4 =2-:0V =4-:0V

0VDC
0VDC 0VDC 0VDC 0 V DC
General control

Bag clamp
Weigher

2.19 / 0V

issue CAE-No. page text drawing-No. following page page


Potential transittions SP1905016-01-C 4 3
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =0 +0 2 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

=0-:125 / 5.3

101 =2+0-1X3
100 -1X3
101 =2+2-2X3
11 11

Weigher -4S4 Spare +GO-4S14


12 12

102 =2+2-2X3
101 -1X3
102 =2+2-1X3

Safety door
switch
BN

BU

103 =2+2-2X3

103 =2+0-1X3

103 -1X3

103 -1X3

Emergency control
11
panel door
-4S14.1
12

=0-:110 / 5.3

Emergency stop series


ok

issue CAE-No. page text drawing-No. following page page


Emergency stop open SP1905016-01-C 5 4
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =0 +0 3 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

3.9 / +24VDC =2+2-:24VDC / =2/4.3


3 -1X3 3 -1X3
4.21 / =0-:125

4.21 / =0-:110

13
-10S11
14
Installation
on

-10A8
A1 S11 S12 S22 S33 S34 13 23 33 41 53

A2 PE X3 X5 14 24 34 42 54

=4-:+24VDC / =4/2.3

=2+24VDC SAFE / =2/3.4

PE
x1
-10H16
x2
4 -1X3 4 -1X3
3.9 / =0-:4
Installation
on

issue CAE-No. page text drawing-No. following page page


Emergency stop relay SP1905016-01-C 6 5
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =0 +0 4 41
13/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

counter

=2-9K12

Installation stream regulator hammer vibrator bag release central alarm


on man. auto out in out in delay timer

=0-10S11 =2-9S8 =2-9S10 =2-7S20 =4-20K8 =0-4H4

emergency stop

=0-4S14.1

issue CAE-No. page text drawing-No. following page page


Mounting elements in the control panel door SP1905016-01-C 7 6
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =0 +0 5 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

740 mm

30 mm
45x60 mm.

=0-2G18

18

5
=0-2Q18 =2-2Q9

2F

3F
0-

2-
=

=
1 L1 3 L2 5 L3 1 L1 3 L2 5 L3 -5A16

180 mm
SIEMENS SIRIUS 3R SIEMENS SIRIUS 3R

16A 16A

I I
14
11
14
11 output: 24 VDC/2A
50REL328-E 8 I/O 230VAC/2A
TEST TEST
input : 24 VDC/100 mA
0 0 RS485-HS-24VDC Power ext. 24 VDC
SIEMENS SIEMENS
5SX2 5SX2

2 T1 4 T2 6 T3 2 T1 4 T2 6 T3

45x60 mm.
45x60 mm.

45x60 mm.

2 1
8A
16
18

2-
4K
3K
14

=
4

2-
4
5

R
1

4-
=0-10A8

4K

3K
R

=
0C
R

0C

0C

=
0C

0C

0C
=2-7K10 =2-7K12

2-

4-

-0
730 mm

-0

-0
A1 A3+ 15C

=
-0

-0

-0
160 mm

1 L1 3 L2 5 L3 21 NC A1+ 1 L1 3 L2 5 L3 21 NC A1+ A1- 15


SIEMENS
SIRIUS 3R

SIEMENS 3RT SIEMENS 3RT


40 60

20 80

FINDER FINDER FINDER FINDER FINDER FINDER FINDER FINDER Range


5
100%

55.34 55.34 55.34 55.34 55.34 55.34 55.34 55.34


40 60

20 80

M
5

16 18 A2- 3RP1533-2AQ30

2 T1 4 T2 6 T3 22 NC A2- 2 T1 4 T2 6 T3 22 NC A2-

16NC 18NO A2-

45x60 mm.

101

352

391
21
W2

11
11
11
11
16

26
31
33
U2
V1

350

390
3
4
103
100
101
102
103

18

28
W1

10
11
11
11
11
20
30
32
36
U1

V2
PE

PE
L1
L2
L3

4
3
3
3
3
3
4
4
4
4
4
4
4
4
4
N

3
3
3
4
4
4
L
L
=0+0-1x1

=0+0-1x3

=2+0-1x5

=4+0-1x3

=2+0-1x4
=2+0-1x1

=2+0-1x3

issue CAE-No. page text drawing-No. following page page


Arrangement of mounting plate SP1905016-01-C =2/1 7
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =0 +0 6 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

general datas for group 2 weigher E55B

treminal box and plug boards of group =2


=2+0-1x1 =terminal box in control panal (main voltage)

=2+0-1x2 =terminal box in control panal (auxillary voltage)

=2+0-1x3 =terminal box in control panal (control voltage)

=2+0-1x4 =terminal box in control panal (intrin safe)

=2+0-1x5 =terminal box in control panal (thermistor)

=2+2-1x3 =terminal box for load cells

=2+2-2x3 =terminal box for weigher (control voltage)

=2+2-2x4 =terminal box for weigher (intrin.safe)

=2+2-2x5 =terminal box for weigher (thermistor)

issue CAE-No. page text drawing-No. following page page


General datas for group =2 SP1905016-01-C 2 1
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 =0/7 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

=0/2.22 / =0-L4

=0/2.22 / =0-L5

=0/2.22 / =0-L6

1 3 5
-2Q9
/3.8
/3.3
I> I> I> 1.8-2.5A
2 4 6 3RV1011-1CA0

1 3 5 1 3 5

-7K10 -7K12
2 4 6 /7.12 2 4 6 /7.14
/7.14 Bulk feed /7.12 Dribble feed

2,5mm. BK 2,5mm. BK

-1X1 U1 V1 W1 -1X1 U2 V2 W2

U1 V1 W1

-2M9 M
0.65KW
1.9A
3~
PE -1X1

+2-2X5 350 352

-1X5 350 352


4.19 / =2-:350

4.19 / =2-:352

BELT DRIVE
issue CAE-No. page text drawing-No. following page page
Drives weigher feeder SP1905016-01-C 3 2
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 1 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

=0/5.21 / +24VDC SAFE

=2-:+24VDC / 4.3

1
-3F5
2 4A

+24VDC-:11 / 7.3
11 -1X3

21 97 95 13
-2Q9 -4K16 -4K16 -2Q9
22 /2.9 /4.18 98 96 /3.5 14 /2.9
/3.6 temperature
protection
motor

=2-:10
4.3

5.3 4.3
0V =2+2-2X3:0V

4 -1X3 4
=2-:0V / 4.3

=0/3.11 / =2-:0V

Terminal box weigher

issue CAE-No. page text drawing-No. following page page


Terminal transition for control voltage SP1905016-01-C 4 3
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 2 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

3.22 / =2-:+24VDC

=0/5.21 / +2-:24VDC +2-:24VDC / 5.3


3 +2-2X3

3.5 / =2-:10

=2-:352 / 2.10
=2-:350 / 2.9
3
-4B12
4 5 /4.8

10 +2-2X3

10 -1X3

x1 1 A1 B1 T1
-4H4 -4B12 -4K14 -4K16
x2 2 A2 A2 T2

/ =2+TO:4

4 +2-2X3
3.13 / =2+2-2X3:0V =2+2-2X3:0V / 8.3

3.22 / =2-:0V =2-:0V / 5.3

Overload Level indicator Min indicator Motor protection


weigher feeding in supply hopper(VEGA) covered weigher feeder

14
5 11 /8.7 96 95 /3.6
3 /4.11 12
4
issue CAE-No. page text drawing-No. following page page
Control general part SP1905016-01-C 5 4
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 3 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

4.22 / +2-:24VDC +2-:24VDC / 6.4


3 -1X3 3 -1X3
4.22 / =2-:0V =2-:0V / 6.4
4 -1X3 4 -1X3

GN YE WH BN W2 BN WH YE GN W2 WH BN W3
/5.15 4x0.5 4x0.5
4x0.5 Shield cable Shield cable
Shield cable

-5A16 0V 24V 0V 24V B/TX- A/TX+ B/TX- A/TX+ RX- RX+ RX- RX+
RX+ RX- A/TX+ B/TX- KL2 PA - + X4
33 32 31 30 29 28 27 26 37 36 35 34
1 2 3 4
POWER RS485 RS485
RS485 DC Power supply
Tx : Jumpers
Rx : Jumpers
9
0
1 50REL328-E 8 I/O
8 2 RS485-HS-24VDC
7 3
6
5
4
output: 24 VDC/2A
230VAC/2A
input : 24 VDC/100 mA
Power ext. 24 VDC
POWER
1 2 3 4 5 6
0V 0V 0V 24V 24V 24V

4 -1X3
3.3 / 0V
11 -1X3
/ +24VDC

issue CAE-No. page text drawing-No. following page page


Current supply Speed AC IQ SP1905016-01-C 6 5
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 4 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

5.22 / +2-:24VDC +2-:24VDC / 8.3


3 -1X3
=4/3.12 / =2+0-1X3:18

=4/3.7 / =2+0-1X3:21
9 9
-00CR1 -00CR2
5 1 /6.6 5 1 /6.9

BN RD W4
7x0.75
Shield cable

2 +12V 3 IN0 4 IN1 5 IN2 6 IN3 KL4


Discharge Empty bag
request ready

Digital inputs module PIM


1 0V

A1 A1
-00CR1 -00CR2
A2 A2

4 -1X3
5.22 / =2-:0V =2-:0V / 7.3
5 5

1 9 /6.13 1 9 /6.15

Discharge Empty bag


request ready

issue CAE-No. page text drawing-No. following page page


SpeedAC IQ Input Module PIM SP1905016-01-C 7 6
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 5 41
20/02/2016
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

3.22 / +24VDC-:11 +24VDC-:11 / 8.3


11 -1X3 11 -1X3

9 9 9 9 10
-00CR5 -00CR6 -00CR3 -00CR4 -00CR4
5 1 /7.5 5 1 /7.6 5 1 /7.8 5 1 /7.10 6 2 /7.10

YE W3
4x0.5
Shield cable

6 +24VDC KL5
Digital outputs module PIM
13
-7S20
14

1 IN- 2 OUT0 3 OUT1 4 OUT2 5 OUT3

21 21 32 -1X3 30 33
-7K12 -7K10
22 /2.13 22 /2.9 32 +2-2X3 30 33

GN W3 WH YE GN GY W4
4x0.5 7x0.75
Shield cable Shield cable

A1 A1 A1 A1 A1 A1 +2 +2 +2
-00CR5 -00CR6 -00CR3 -00CR4 -7K10 -7K12 7Y16 7Y18 7Y20
A2 A2 A2 A2 A2 A2

4 -1X3 4 -1X3 4 +2-2X3 4


6.22 / =2-:0V =2-:0V / 8.3
5 5 5 5 21 22 /7.14 21 22 /7.12
9 /7.12 9 /7.14 9 /7.17 9 /7.19
1 1 1 1
6
10 /7.22
2
Catch gate Discharge Vibrator
Bulk feed Dribble feed Catch gate Discharge Bulk feed Dribble feed door
door

issue CAE-No. page text drawing-No. following page page


SpeedAC IQ Output Module PIM SP1905016-01-C 8 7
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 6 41
20/02/2016
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

7.22 / +24VDC-:11 +24VDC-:11 / 9.4

6.22 / +2-:24VDC
3 -1X3 3 -1X3

4 -1X3

3 +2-2X3 +2-2X3 3 4

TT -8B21

bn blu

12 14 11 7 +2-2X4 390 391


+ -
P -8B5 -4K14 -8K21 -8B13
11 12 14 /4.12 9 8 Catch gate -1X4 390 391
switch
blk

16 +2-2X3 20

16 -1X3 20
-8A21
1 3 14 15
A1
1 2
S1
-8K21 S2
A2
S3

7 8 9 10 11 12 13 14 -5A16

+ +

IN8 IN9 IN10 IN11 IN12 IN13 IN14 IN15


+

+
+

+
- - - - - - - - - - - - - - - -

- - - - - - - -

- 15
-

7.22 / =2-:0V =2-:0V / 9.4

4.22 / =2+2-2X3:0V =2+2-2X3:0V / 9.4

Emergency Pressure Low level Discharge door Catch gate Dribble feed
stop switch sensor closed open only

issue CAE-No. page text drawing-No. following page page


SpeedAc IQ - Input relay module SP1905016-01-C 9 8
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 7 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

8.22 / +24VDC-:11

-5A16

9.19 / + + / 9.4
20 25
OUT8 OUT9 OUT10 OUT11 OUT12 OUT13 OUT14 OUT15

+
- - - - - - - -

9.19 / - - / 9.4

16 17 18 19 21 22 23 24

13 13
-9S8 -9S10
14 14
=4/3.3 / =4+0-1X3-:Y1

=4/3.3 / =4+0-1X3-:28
26 -1X3 31

26 +2-2X3 31

-9Y8 -9Y10 -9K12


x1 x1 A1

x2 x2 A2

8.22 / =2-:0V
4 +2-2X3 4
8.22 / =2+2-2X3:0V

Discharge Stream Knock hammer Bag holder External bag Spare


regulator counter

issue CAE-No. page text drawing-No. following page page


SpeedAc IQ - Output relay module SP1905016-01-C 10 9
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 8 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

ADM1

+excltation

-excltation
Connection block

+signal
+sense

-signal

sheild
-sense
load cell
SpeedAc IQ
J1:1 J1:2 J1:3 J1:4 J1:5 J1:6

W1
ELECTRONIC-LIY(C)-PUR
7x0,34 GN GY PK YE BN WH
code colour
3
PK pink
GY grey
YE yellow
GN green
BN brown
WH white

1
terminal box
load cells +2JB1-1X3 1 2 3 4 5 6
1 1

2
2
+2-41B4 +2-41B21
blue blue
green green
black black
grey grey
white white
red red

issue CAE-No. page text drawing-No. following page page


Load Cell Connection For 1-3 Load Cell SP1905016-01-C =4/1 10
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =2 +0 9 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

general datas for group =4

terminal blocks and plug boards of group =4


=4+0-1x3 =terminal box in control panal ( control voltage )

=4+0-1x3 =terminal box for bog clamp (control voltage)

issue CAE-No. page text drawing-No. following page page


General datas for group =4 SP1905016-01-C 2 1
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =4 +0 =2/10 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

=0/5.21 / =4-:+24VDC

3 -1X3 3 -1X3

=4-:3 =4+4-1X3:3
3.3 3.3

3.3 3.3
=4-:4 =4+4-1X3:0V

4 -1X3 4

=0/3.14 / =4-:0V

Terminal box bag clamp

issue CAE-No. page text drawing-No. following page page


Terminal transition for control voltage SP1905016-01-C 3 2
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =4 +0 1 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

=2/9.11 / =4+0-1X3-:28

2.4 / =4-:3
3 -1X3
=2/9.6 / =4+0-1X3-:Y1
15
-3K18
2.13 / =4+4-1X3:3
16 18 /3.17
3 +4-1X3 3 +4-1X3

Bag clamp 13

limit switch 1 +4-3S12


14 28 -1X3

19 +4-1X3 28 +4-1X3

19 +4-1X3

Bag clamp 13
BN BU BN BU
limit switch 2 +4-3S12.1
+ - + -
6S4 6S8 14

BK BK
20 +4-1X3
17 +4-1X3 17 +4-1X3 20 +4-1X3

21
Emergency open
bag clamp +4-3S22
21 +4-1X3 22 /3.22
11
21 -1X3 Emergency open +4-3S22
18 +4-1X3 bag clamp 12 /3.12

18 -1X3

15 +4-1X3
11

-3R18
-3K4 15 +4-1X3
12 14 /3.5

=2/6.4 / =2+0-1X3:18
=2/6.4 / =2+0-1X3:21

A1 B1
Z1 Z2 Y1 -3K18
-3K4 +4-3Y22
A2 A2 Off Delay timer
RE7 RA11BU

2.4 / =4-:4
4 -1X3
4 +4-1X3 4 +4-1X3
2.13 / =4+4-1X3:0V

14 Ok to discharge Close Release 18 Close


12 11 /3.12
bag clamp bag clamp 16 15 /3.19
bag clamp

issue CAE-No. page text drawing-No. following page page


Bag clamp control SP1905016-01-C =TRML+/7 3
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP =4 +0 2 41
11/11/2013
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=0+0-1X1

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

L1 L1 -2Q4 2 /2.3
L2 L2 -2Q4 4 /2.4
L3 L3 -2Q4 6 /2.4
N N /2.5
PE PE -PE1 1 /2.5

issue CAE-No. page text drawing-No. following page page


Terminal diagram =0+0-1X1 SP1905016-01-C 8 7
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + =4+0/3 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=0+0-1X3

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

-10A8-A1 3 -2F18 /5.6


-10A8-13 3 -10A8-23 /5.14
-0VDC 4 -10A8-A2 /5.6
4 -10H16 x2 /5.17
+GO-4S14 11 100 -10A8-S22 /4.14
=2-1X3 101 101 +GO-4S14 12 /4.14
103 =2-1X3 103 /4.14
-4S14.1 11 103 /4.14

issue CAE-No. page text drawing-No. following page page


Terminal diagram =0+0-1X3 SP1905016-01-C 43 8
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 7 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=2+0-1X1

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

PE -2M9 /2.10
-2M9 U1 U1 -7K10 2 /2.9
U2 -7K12 2 /2.13
-2M9 V1 V1 -7K10 4 /2.9
V2 -7K12 4 /2.14
-2M9 W1 W1 -7K10 6 /2.10
W2 -7K12 6 /2.14

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+0-1X1 SP1905016-01-C 44 43
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 8 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

-W3

-W3
Strip

Cable name

Cable name
=2+0-1X3

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

24VDC -32 24V 3 /5.6


= BN -X4 + 3 /5.21
= -00CR1 9 3 -00CR2 9 /6.13
+2-2X3 3 3 -8K21 7 /8.5
+2-2X3 3 3 -8K21 7 /8.10
-8A21 14
=0-0VDC 4 /3.3
=0-0VDC 4 +2-2X3 4 /3.13
-4K14 A2
24VDC -33 0V 4 -4K16 A2 /5.5
= 4 -1 /5.6
= WH -X4 - 4 /5.21
= -00CR2 A2 4 -00CR1 A2 /6.6
= -00CR2 A2 4 -KL5-1 IN- /7.3
= -00CR6 A2 4 -00CR5 A2 /7.5
+2-2X3 4 4 -8A21 15 /8.11
-4K14 A1 10 +2-2X3 10 /4.12
11 -2Q9 13 /3.13
11 /3.13
11 /3.21
24VDC 11 -4 /5.7
= -KL5-6 +24VDC 11 -00CR5 9 /7.10
= -00CR3 9 11 -00CR6 9 /7.17
-00CR4 9
-5A16 8 16 +2-2X3 16 /8.5
-5A16 11 20 +2-2X3 20 /8.10
+2-2X3 26 26 -9S8 14 /9.8
Discharge door +2-2X3 30 30 -00CR4 5 /7.19
+2-2X3 31 31 -9S10 14 /9.9
Discharge door +2-2X3 32 32 -00CR3 5 /7.17
+2-2X3 33 33 -7S20 14 /7.22
Low level sensor -8Y18 x1 36 +2-2X3 36 /4.15
+2-2X3 101 101 =0-1X3 101 =0/4.4
=0-1X3 103 103 +2-2X3 103 =0/4.14

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+0-1X3 SP1905016-01-C 45 44
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 43 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=2+0-1X4

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

-8A21 1 390 +2-2X4 390 /8.19


-8A21 3 391 +2-2X4 391 /8.20

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+0-1X4 SP1905016-01-C 46 45
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 44 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=2+0-1X5

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

-4K16 T1 350 +2-2X5 350 /2.9


-4K16 T2 352 +2-2X5 352 /2.10

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+0-1X5 SP1905016-01-C 47 46
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 45 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

+0-W1
Strip

Cable name

Cable name
=2+2JB1-1X3

ELECTRONIC-LIY(C)-PUR
Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

+2-41B4 1 +0-ADM1 J1:1 GN +0/10.7


+2-41B21
+2-41B4 2 +0-ADM1 J1:3 PK +0/10.8
+2-41B21
+2-41B4 3 +0-ADM1 J1:2 GY +0/10.9
+2-41B21
+2-41B4 4 +0-ADM1 J1:4 YE +0/10.10
+2-41B21
+2-41B4 5 +0-ADM1 J1:5 BN +0/10.11
+2-41B21
+2-41B4 6 +0-ADM1 J1:6 WH +0/10.12
+2-41B21

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+2JB1-1X3 SP1905016-01-C 48 47
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 46 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=2+2-1X3

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

102 -2X3 102 =0+0/4.4

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+2-1X3 SP1905016-01-C 49 48
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 47 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=2+2-2X3

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

+0-4B12 1 3 +0/4.8
+0-8B5 14 3 +0-1X3 3 +0/8.5
+0-8B13 bn 3 +0-1X3 3 +0/8.10
+0-1X3 4 4 +0-4B12 2 +0/4.8
0VDC +0-7K12 A2 4 +27Y16 +0/7.17
= +27Y20 4 +27Y18 +0/7.19
+0-8B13 blu 4 +0-1X3 4 +0/8.11
4 +0-9Y8 x2 +0/9.8
4 +0-9Y10 x2 +0/9.9
+0-1X3 10 10 +0-4B12 5 +0/4.12
+0-1X3 16 16 +0-8B5 11 +0/8.5
+0-1X3 20 20 +0-8B13 blk +0/8.10
+0-9Y8 x1 26 +0-1X3 26 +0/9.8
Discharge door +27Y18 30 +0-1X3 30 +0/7.19
+0-9Y10 x1 31 +0-1X3 31 +0/9.9
Discharge door +27Y16 32 +0-1X3 32 +0/7.17
+27Y20 33 +0-1X3 33 +0/7.22
Low level sensor +0-1X3 36 36 +0-8S14 14 +0/4.15
=0+0-4S4 11 101 +0-1X3 101 =0+0/4.4
-1X3 102 102 =0+0-4S4 12 =0+0/4.4
+0-1X3 103 103 =0+0/4.14

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+2-2X3 SP1905016-01-C 50 49
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 48 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=2+2-2X4

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

+0-1X4 390 390 +0/8.19


+0-1X4 391 391 +0/8.20

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+2-2X4 SP1905016-01-C 51 50
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 49 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=2+2-2X5

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

+0-1X5 350 350 +0/2.9


+0-1X5 352 352 +0/2.10

issue CAE-No. page text drawing-No. following page page


Terminal diagram =2+2-2X5 SP1905016-01-C 52 51
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 50 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=4+0-1X3

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

3 =0-10A8-24 /2.4
+4-1X3 3 3 /2.13
-3K18 B1 3 -3K18 15 /3.17
=0-0VDC 4 -6K4 A2 /2.4
=0-0VDC 4 +4-1X3 4 /2.13
-6K4 A2 4 -3K18 A2 /3.17
=2-00CR1 A1 18 +4-1X3 18 /3.12
=2-00CR2 A1 21 +4-1X3 21 /3.7
-6K4 A1
+4-1X3 28 28 =2-5A16 /3.22
-3K18 18

issue CAE-No. page text drawing-No. following page page


Terminal diagram =4+0-1X3 SP1905016-01-C 53 52
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 51 41
15/02/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Terminal diagram F13_001

Strip

Cable name

Cable name
=4+4-1X3

Connection

Connection
cable type

cable type
terminal

jumper
point

point
function text Target designation Target designation Page / column

+0-6S4 BN 3 +0-1X3 3 +0/3.5


-3S12 13 3 +0/3.12
+0-1X3 4 4 +0-6S8 BU +0/3.9
4 -3Y22 +0/3.22
15 -3S22 12 +0/3.22
-3Y22 15 +0/3.22
17 +0-6S4 BK +0/3.5
17 +0-6S8 BN +0/3.7
+0-1X3 18 18 -3S22 22 +0/3.12
19 -3S12 14 +0/3.12
-3S12.1 13 19 +0/3.12
20 -3S12.1 14 +0/3.12
-3S22 21 20 +0/3.12
+0-1X3 21 21 +0-6S8 BK +0/3.7
-3S22 11 28 +0-1X3 28 +0/3.22

issue CAE-No. page text drawing-No. following page page


Terminal diagram =4+4-1X3 SP1905016-01-C 53
modification
08/07/2019 RACP installation group site preceding page off
plotting date SPEEDAC IQ E55B+S4+AV+HM+CT+Release Clamp
RACP = TRML + 52 41
15/02/2018