1: SWL means

A- safe working light

B- safe work load✔️

C- site work limit

2: which one needs third party inspection

A- hammer

B- knife

C- Spreader Beam✔️

3: 3rd party inspection validity for slings is

A- 1 month

B- 3 months

C- 6 months✔️

4: which one is used to measure wind speed in crane

A- load cell

B- anemometer✔️

C- Tensionometer
5: which one is used to measure load on rope

A- Tensionometer✔️

B- anemometer

C- inclinometer

6: which device is used to measure angle of the boom

A- anemometer

B- inclinometer✔️

C- Tensionometer

7: which device is used to measure load on hook

A- Tensionometer

B- inclinometer

C- load cell✔️

8: operator's view should be clear

A- 180°

B- 360°✔️

C- 120°
9: crane operator should have

A- Aramco license

B- Heavy driving license

C- Both A & B✔️

10- PUC is required for

A- crane✔️

B- crane operator

C- Spreader Beam

11: safety factor for slings is

A- 5:1

B: 6:1✔️

C- 4:1

12: Which documents we need for slings.

A: third party certificate

B- Manufacturer certificate

C- Daily checklist

D- All✔️

13: Shackles don't need SWL written on them.


A- true

B- false✔️

14: Who's responsible for daily inspection of lifting gears.

A- Operator

B- Rigger✔️

C- work permit receiver

15: SWL should be marked on all lifting gears

A- true✔️

B- False

16- what should we check of web sling to know it's SWL

A- Color

B- Thread lines

C- Tag✔️

17: Lifting Hardware's weight will be included in total weight lifted by crane.

A- true✔️

B- False
18: SLI stands for

A- Site Light inspection

B- Safe load indicator✔️

C- Safety light indicator

19: Where is SLI found

A- on site

B- Inside crane cabin✔️

C- over crane boom

20: How can crane operator know the angle/length of boom.

A- using his experience

B- following computer screen front of him. ✔️

C- following Rigger

1- Type K Temperature means.

A- Low temperature

B- Normal room temperature

C- Very high temperature.✔️

2- Light is measured with

A- Anemometer
B- Lux Meter✔️

C- Thermometer

3- To follow heat index we need to measure.

A- Heat only

B- Relative humidity only

C- Heat+Relative humidity✔️

4- Outdoor Lifting is not allowed in

A- Cold weather

B- Night time

C- Thunderstorm ✔️

5- crane's outriggers should be away from excavation (A type soil)

A- 1 meter deep 1 meter away✔️

B- 1 meter deep 2 meter away

C- 1 meter deep 1.5 meter away

6- For Type C Soil,crane should be away.

A- 1 meter deep 1 meter away

B- 1 meter deep 2 meters away✔️


C- 1 meter deep 1.5 meter away

7- Crane should be away from Power lines,if voltage is 80000 v.?

A- 10 feet

B- 15 feet

C- 20 feet✔️

8- If only one sign board is required, which one is must for lifting

A- Ear protection

B- lifting in progress✔️

C- PPEs required

9- JSA means

A- Job site application

B- Job safety analysis✔️

C- Job standards apply

10- For lifting activity we need following documents available at site.

1- Work permit only

B- Work permit, JSA and method of statement✔️

C- JSA and method of statement.


1: before lifting ,hook should be centered

A-True✔️

B-False

2- Preferred angle for slings is

A- 50°

B- 40°

C- 60°✔️

3- Floating should be

A- 5 seconds

B- 10 Seconds

C- 3 seconds✔️

4- Operator can go to washroom if load is supposed.

A- True

B- False✔️

5- We should use tag line


A- Every time

B- Never

C- Only if they don't create additional hazard✔️

6- Excavation plan is required if depth of BC type Soil is

A- 5 feet

B- 3 feet

C- 9 feet✔️

7- Excavation plan is required for all types of Soils if depth is

A- 10 feet

B- 20 feet

C- 21 feet✔️

8- we must keep away excavating equipment from live pipe line minimum.

A- 5 meters

B- 4 meters

C- 3 meters✔️

9- We need Aramco work permit if we are going to work inside............. Radius from wellhead
A- 50 meters

B- 23 meters✔️

C- 15 meters

10- We can find underground utilities by

A- Using Excavator and digging the ground.

B- Using Cable detectors/Utilities detectors to find exact location✔️

C- Using bombs

1- write the names of 2 documents required before excavation activity

A-.. Pre-Excavation checklist

B... Work permit

2- A bus should stay away from excavation edge if excavation is 1.5 meter deep.

A- 1.5 meter

B-. 2 meters✔️

C- 3 meters

3-A bus should stay away from excavation edge if excavation is 3 meter deep.

A- 2 meters
B- 6 meters

C- 3 meters✔️

4- A loader is involved in backfilling activity, it should stay away from edge.

A- 2 meters

B- 4 meters

C- No limit ✔️

5- Barricade for pedestrians should be away from edge, minimum.

A- 2 meters

B- 1 meter✔️

C- 3 meters

6- Write 2 methods to protect an excavation from collapse/cave in.

A- Benching

B- Sloping

7- slope for B type soil should be

A- 1/1.5( 34°)

B- 1/1(45°)

C- 1/0.75(53°)

8- Excavation spoils should be away from edge, minimum

A- 1 foot
B- 3 feet

C- 2 feet✔️

9- Distance between 2 access/ladders in a trench should be, maximum

A- 7.5 meters(25 feet)

B- 15 meters ( 50 feet)✔️

C- 10 meters

10- An access should be away from a worker inside the trench maximum.

A- 50 feet

B- 15 feet

C- 25 feet✔️

11- at Saudi Aramco projects, restricted area is...... Meters radius from live pipelines.

A- 15 meters

B- 30 meters

C- 23 meters✔️

12- we are gonna dig a trench near 2 meters of live pipelines , we should

A- Use Excavator

B- We should excavate manually ✔️

C- We can use Backhoe loader


13- Daily excavation checklist is required if excavation depth is

A- 2 meters

B- 4 meters✔️

C- 3 meters

D 5 meters ✔️

14- Excavation plan is required if excavation depth is

A- 15 feet

B-. 20

C-. 21

15- What extra precaution we need for rock breaking

A- Fire protection

B- Hearing protection✔️

C- Barricades

1. What is the preferred space between two rungs as per Saudi Aramco?

1. 16"

2. 10"-14"✔️

3. 12"

4. 4"

2. Are we allowed to paint the ladder blue as per Aramco standards?

1. Yes, we can paint only blue.

2. No, no colours should be applied.✔️


3. What should be the ratio between the height at which ladder is laid and the base of the ladder?

1. 2:1 (16°)

2. 3:1 (22°)

3. 4:1 (75°)✔️

5. 4:1 (85°)

4. What should be the maximum height of first rung from the ground, if the ladder is attached to a
scaffolding at 90°?

1. 2 feet✔️

2. 1 feet

3. 5 feet

4. 0.6 feet

5. A ladder should be extended from landing area minimum

A- 3eet✔️

B- 4 feet

C- 5 feet

6. How many points of contact should be maintained while ascending, descending or working on a
ladder?

A- 2

B- 3 ✔️

C- 4
7-Without defector plates, minimum distance from the face of the ladder to nearest fixed object
(climbing side) should be

A- 12"

B- 30"✔️

C- 24"

8. What is minimum lateral distance between 2 Adjacent Ladders

A. 13"

B. 16"✔️

C. 14"

9. What is minimum toe clearance?

A. 8"

B. 4"✔️

C.9"

10. What is minimum overlap if extension ladder's total length is 36 feet?

A. 5 feet

B. 4 feet✔️

C. 6 feet

1- Backup alarm should be louder than ambient noise, minimum


A- 15 desibel

B- 10 desibel✔️

C- 20 desibel

2- PWAS stands for

A- Probably warning Aramco standards

B- Primary welfare allowance System

C- Proximity warning alarm system✔️

3- ROPs is the protection of

A- Operator's cabin✔️

B- Engine

C- Bucket

4- FOPs is the protection of cabin from

A- Fall of operator

B- Fire protection

C- Falling Objects ✔️

5- Cabin view should be clear

A- 220°

B- 250°

C- 360°✔️
6- When Equipment's noise is....... Desibel, Ear protection must be worn

A- 85 desibel

B- more than 85 desibel✔️

C- 90 desibel

7- when someone wants to talk to operate, he should

A- shout loudly

B- knock cabin door

C- make eye contact✔️

8- All machins should be away from excavation edge except excavating equipment s, if the depth is 1.5
meter

A- 1.5 meter

B- 2 meters✔️

C- 3 meters

9- Complete camera installation for heavy equipment's operator view is

A- 2 cameras ( front,back)

B- 1 camera front only

C- 4 Cameras, Front back, left right ✔️

10- Which person we need during heavy equipment operation in Armaco territory
A- Fire watch

B- Flagman

C- Both✔️

1- Base plate measurements.

A- 4x4" and 6mm thick

B- 6x4" and 4mm thick

C- 6x6" and 6mm thick √

D- 5x5" and 4 mm thick

2- Screw jack Should be engaged Maximum.

(Thread area outside the post)

A- 2/4th of total threaded area

B- 1/3rd of total threaded area

C- 2/3rd of total threaded area√

D- 1/4th of total threaded area

3- Sole board's width and thickness should be

A- 9" and 1.5" maximum

B- 9" and 1.5" minimum√

C- 2" and 10" maximum

D- 6" and 1" minimum

4- Sole board should be under 2 posts, if not practicable then it should be under 1 post but its length
should be
A- 20" maximum

B- 30" maximum

C- 30" minimum√

D- 25" minimum

5- We can make scaffolding without sole board on

A- Asphalt

B- Compacted soil

C- Levelled concrete √

D- Use it always

6- Cup lock scaffolding is an example of

A- Tube and coupler scaffold

B- Base supported system scaffold√

C- Suspended scaffold

D- Underhung scaffold

7- Scaffold for 280 kg per square meter is an example of

A- Light duty

B- Medium duty

C- Special duty√

D- Underhung scaffold

8- We can't use this fire extinguisher inside enclosed confined spaces.


A- Carbon dioxide√

B- Dry chemical

C- Wet chemical

D- Water

9- Which feature is the number one to declare some space as confined space

A- Oxygen deficiency

B- Hydrogen Sulphide presence

C- Limited access/egress and enclosed nature.√

D- Darkness

10- Who is must for all confined spaces

A- Fire watcher

B- Flagman

C- Stand-by man.√

D- foreman

11- When there's no smell of hydrogen Sulphide. It means there's no Hydrogen Sulphide present.

A- False√

B- True

12- PPM stands for

A- Pressure per meter

B- Part per meter


C- Part per million√

D- Part per month

13- At 8 PPM , we can

A- Work normally✓

B- We can't enter the area

C- We can work with SCBA only

D- 10 minutes work 50 minutes rest

14- When there's H2S release. Will will move towards assembly area following wind direction

A- Upwind or crosswind√

B- Downwind

C- Upwind

D- Any direction

15- Working in confined space required

A- Permit/Entry plan

B- Stand-by man

C- Confined space entry supervisor

D- All of above√

16- there are fixed attachment points with

A- Tube and coupler scaffold

B- System Scaffold√
C- Underhung scaffold

17- Which hazard is more dangerous in confined space when working in oil and gas

A- Oxygen deficiency

B- Hydrogen Sulphide√

C- Improper access

D- Darkness

18- Which hammer is safe to use for scaffold erection

A- Iron

B- Wood

C- Copper√

D- Glass

19- We need....... For scaffold erection

A- Method statement

B- JSA/Risk assessment

C- Work permit

D- All correct√

20- Vertical Tubes in base supported scaffold are called

A- Ledger

B- Transom

C- Post/standard√

D- Toe board
1- Oxidizers should be away from fuel gases horizontally

A- 20 feet maximum

B- 20 feet minimum ☑️

C- 5 feet maximum

D- 5 feet minimum

2- Oxidizers should be away from fuel gases vertically

A- 20 feet maximum

B- 20 feet minimum

C- 5 feet maximum

D- 5 feet minimum☑️

3- Cylinders should not be stored in temperature

A- less than 54 degree centigrade

B- more than 54°☑️

C- more than 52°

D- more than 50°

4- cylinder valve should not be turned more than.......turn

A- 2

B- 3
C- 1.5☑️

D- 2.5

5- adjustable base plate should not be adjusted more than........ Of total threaded area

A- 1/3

B- 1/4

C- 2/3☑️

D- 3/2

6- barrier between oxidizers and fuel gases should have fire rated capacity

A- 40 minutes minimum

B- 30 minutes minimum ☑️

C- 40 minutes maximum

D- 30 minutes maximum

7- Compressed gases cylinders' should be

A- labeled

B- Under Shade

C- in well ventilated are

D- all of above ☑️

8- Which one could be dangerous

A- Oxygen deficiency
B- oxygen enrichment

C- Both A and B ☑️

9- Base plate should be

A- 4x4" minimum

B- 6x6" maximum

C- 6x6 " Minimum ☑️

D- 5x5 " maximum

10- Who is must for all confined spaces

A- Fire watcher

B- Flagman

C- Stand-by man.☑️

D- foreman

1- Platform width must be

A- 25" minimum

B- 27" maximum

C- 40" minimum

D- 27" minimum ✔️

2- Top rail height should be


A- 38" minimum

B- 40" maximum

C- 45" maximum

D- A and C✔️

3- Toe board thickness

A- 2" maximum

B- 1" minimum✔️

C-. 1" maximum

D-. 1.5" minimum

4- Toe board height should be

A- 4" maximum

B- 6" minimum✔️ ❌

C- 4" minimum

D- 6" maximum

5- Gape between platform surface and toe board should be

A- 1" maximum

B- 6 mm. Minimum

C- 2 "

D- 6 mm. Maximum✔️

6- Toe board capacity


A- 30 kg minimum

B- 30 kg maximum

C- 23 kg minimum✔️

D- 25 kg maximum

7- Guardrail Capacity should be

A- 100 kg maximum

B- 90 kg maximum

C- 80 kg minimum

D- 90 kg minimum✔️

8- Gapes between platform planks should be

A- 1" minimum

B- 1" maximum✔️

C- 2" minimum

D- 2 " maximum

9- 1 foot Gape between platform planks should be covered

A- Using plywoods✔️

B- Using Fire blanket

C- Using cross planks

D- leave it open
10- Gaps more than 2 feet should be covered

A- Using plywoods

B- Using cross planks✔️

C- fire blanket

D- Leave it open

11- We need complete guardrail system When reaching the height

A- 6 feet✔️

B- 8 feet

C- 5 feet

D- 10 feet

12- protective mesh to protect material from falling is used. Holes' gape should be.....

A- 20mm maximum

B- 13 mm maximum✔️

C- 15 mm maximum

D- 10 mm maximum

13- Planks overlap over transom should be

A- 10" maximum

B- 12 " maximum

C- 12" minimum✔️

D- 15" minimum
14- LVL Planks should be thick

A- 2" minimum

B- 1" minimum

C- 1.5" minimum✔️

D-. 1.5" maximum

15- LVL Planks width should be

A- 10" minimum

B-. 10 " maximum

C-. 9" minimum✔️

D. 9" maximum.

1- Who can write lifting plan

A- Rigger 1

B- Rigger 2

C- Rigger 3

D- A and B ✓

2- Who can finally approve lifting plan

A- Rigger 3

B- Rigger 2
C- Rigger 1✓

D- A and C

3- For which critical lifting rigger level 1 must stay at site. Select all possible answers.

A- Lifting near railway line

B- Lifting Of man basket

C- Tandem lifting✓

D- Rubber lifting ✓

4- Which weight is critical lifting. Select all possible answers.

A- 39 Tons

B- 40 Tons✓

C- 41 Tons✓

D-. 20 tons

5- We have to place load on ground level.

A- Turning lift

B- Tailing lift ✓

C- Pick and carry

D- None of them

6- Which one is critical lift


A- Attaching Slings to Crane hook

B- Attaching fly jib to main bom✓

C- Attaching chain slings to main hook

D- None of above

7- Which percentage of rated load capacity is critical lifting

A- 85%✓

B- 86%❌

C- 75%

D- 70%

8- During Tandem, tailing turning lifts. Crane's load chart will be derated

A- 50%

B- 25% ✓

C- 75%

D- 85%

9- We are going to use 3 cranes for tandem lift.

How many critical lift plans required?

A- only one for all

B- 3 lift plans, one for each ✓


C- No lift plan required

10- We're going to lift near energized power lines. What extra thing to do?

1- JSA

B- method of statement

C- Approval from PDD(power distribution department)✓

D- Nothing new required

1- Who can write lifting plan

Select all options that apply.

A- Rigger 1✅

B- Rigger 2✅

C- Rigger 3

D- Crane operator

2- Who can finally approve lifting plan

A- Rigger 3

B- Rigger 2

C- Rigger 1✅

D- A and C
3- For man Basket Lift, Load chart will be de rated by

A- 75%

B- 25%

C- 50%✅

D- 40%

4- Who must stay at site during man Basket Lift .

A- Rigger level 1

B- Rigger level 2

C- Rigger level 3

D-. 1 or 2✅

5- Which extra document we need while using man Basket

A- Hot work permit

B- JSA

C- Critical lift plan

D- Man Basket Permit ✅

6- We are going to change the position of the crane, moving it from one place to another while Using
man Basket. We need

A- Same Man basket permit

B- New man Basket Permit ✅

C- New lift plan


D- New Cold work permit

7- Which percentage of rated load capacity is critical lifting

A- 85%

B- 86%✅

C- 75%

D- 70%

8- During Tandem, tailing turning lifts. Crane's load chart will be derated

A- 50%

B- 25%✅

C- 75%

D- 85%

9- We are going to use cranes for tandem lift.

How many critical lift plans required?

A- only one for all

B- 3 lift plans, one for each✅

C- No lift plan required

10- What should be written on man Basket's display plate. Select all that apply.

1- ID number
B- Empty weight

C- maximum riders

D- all above✅

1- Slope for type C soil is.

A- 34°√

B- 35°

C- 45°

D- 53°

2- Heavy equipment should stay away from excavation .

A- 2 meter or equal to the depth which ever is greater ❌

B- 3 meters √

D- 1 meter

3- Excavated waste should be away from excavation edge.

A- 1 foot minimum

B- 2 feet maximum

C- 2 feet minimum √

D- 3 feet

4- Which device is for wind speed measurement in crane


A- inclinometer

B- anemometre √

C- anti two block

D-. Load cell

5- Which fire extinguisher can't be used inside a Confined space

A- Foam

B- Dry chemical powder

C- Carbon dioxide √

D- water

6- Oxygen cylinder should store away from fuel gases, horizontally

A- 30 feet minimum

B- 20 feet maximum

C- 10 feet

D- 20 feet minimum √

7- maximum wind speed for crane lifting is

A- 30 Kph

B- 32 Kph√

C- 25 kph

D- 40 Kph
8- During Tandem, tailing turning lifts. Crane's load chart will be derated

A- 50%

B- 25%√

C- 75%

D- 85%

9- We can erect scaffold without sole Board on

A- Asphalt √

B- compacted soil

C- level concrete ❌

D- any concrete

10- maximum Top rail height should be .

1- 38"

B- 40"

C- 45"√

D- 35"

11- Toe board height should be

A- 12" minimum

B- 4" minimum❌

C- 6" minimum √

D- 8" minimum
12- Without SCBA work can be performed if H2S concentration is

A- Under 10 PPM√

B- 20 PPM

C- 50 ppm

D- 100 PPM

13- Base plate should be

A- 6x6" maximum

B- 4x4" maximum

C- 6x 6" minimum√

D- 8x8" minimum

14- ROPs is the protection of

A- Operator's cabin√

B- Engine

C- Bucket

D- Lights

15- PWAS means

A- Probably warning Aramco standards

B- proximity warning alarm system √

C- Primary welfare allowance system

16- When equipment noice is more than....... desibel, we need ear protection
A- 45

B- 85√

C- 80

D- 50

17- Ladder slope should be

A- 1:4

B- 3:1

C- 4:1√

D- 1:3

18- Ladder should be extended from landing point.

A- maximum 3 feet

B- minimum 3 feet √

C- maximum 4 feet

D- 3 meters

19- A loader is involved in backfilling activity. It should stay away from excavation edge

A- 2 meter √

B- 3 meters

C- 4 meters

D- No limit❌

20- Distance between 2 access in a trench should be


A- 7.5 meters minimum

B- 15 meters maximum❌

C- 15 meters minimum

D- 15 feet minimum √

1- We're going to install 3rd platform, which ladder is the best option.

A- External ladder

B- Stepladder

C- Internal ladder √

2- While using external ladder, step through opening in the guardrail should be wide

A- 27" - 30"❌

B- 25"- 30"√

C- 30"- 35"

D- None of them

3- For internal ladder, Opening in the platform should be....... Wide

A- 25"

B- 27" √

C- 30"

D- 36"

4- For internal ladder, Opening in the platform should be....... deep.

A- 30"
B- 35"

C- 27"

D-. 36" √

5- At what dimension of the Scaffold we must need a tie?

A- 1 meter width - 3 meters high

B- 1 meter width - 4 meters high √

C- 1 meter width - 2 meters high

D- 4 meter width - 1 meters high

6- We are going to apply ties on a scaffold, total number of the ties is 8. How many reveal ties can we
apply?

A- maximum 3

B- minimum 4

C- maximum 4 √

D- all 8

7- Vertical distance between 2 ties should be

A- 8 feet maximum

B- 9 meters minimum

C- 8 meters minimum

D- 8 meters maximum √
8- horizontal distance between 2 ties should be

A- 8 feet maximum

B- 9 meters minimum

C- 8 meters minimum

D- 9 meters maximum √

9- Racker's length should be

A- 6 meters minimum

B- 6.4 meters minimum

C- 6.4 meters maximum √

D. 6.5 meters minimum

10- Racker's angle should be

1- min 60 - max 70

B- min 65 - max 75 √

C- min 70 - max 80

D- max 50 - 70 min

1- A node point is the connection point of

A- Screw jack and post

B- Toe board and platform

C- Ledger and posts,,✓

D-. Ladder and platform


2- Minimum angle of vertical bracing is

A- 45°

B- 55°

C- 35°✓

D- 65°

3- Maximum angle for vertical bracing is

A- 45°

B- 55°✓

C- 35°

D- 65°

4- We're going to install X bracing on the width of the Scaffold, how many maximum Open lifts can be
without bracing vertically?

A- 3

B- 2✓

C- 1

D-. 4

5- Maximum distance between bracing tube and node point should be

A- 10"

B- 12"✓
C- 14"

D- 15"

6- We're going to make a splice of two bracing tube. Minimum area of the tubes should be spliced is

A- 10"

B- 14"

C- 12"✓

D- 15"

7- Toe board height should be

A- 6" maximum

B- 4" minimum ✓

C- 5" maximum

D- 4" maximum

8- Guardrail's minimum height should be

A- 36"

B- 35"

C- 38"✓

D- 45"

9- Ladder slope should be


A- 4:1✓

B- 1:4

C- 3:1

D. 1:3

10- Guardrail's Maximum height should be

A- 36"

B- 35"

C- 38"

D- 45"✓

1- Minimum diameter of a caster for medium duty should be

A- 7" √

B- 10"

C- 5"

D-. 4"

2- Height of mobile/tower scaffold should not exceed..........Times of the minimum Base dimension

A- 2

B- 3

C- 4 √

D- 5
3- We're going to push mobile scaffold to transfer from one place to another. At what height it should
be pushed.

A- at 2 meters height

B- Guardrail height

C- Within 1.5 meter √

D- Toe board height

4- Maximum distance between two posts of a Tower scaffolding for medium duty is

A- 2 meters

B- 2.5 meters

C- 1.5 meters √

D-. 3 meters

5- First rung of the ladder with mobile scaffold should be....... from ground level.

A- within 3 feet

B- within 2 feet √

C- 2.5

D- 4

6- Which ladder is preferred with mobile or tower scaffold

A- Step ladder

B- external

C- internal √
D- Extension

7- Mobile scaffolds are usually constructed for.......... duty. It means we're going to apply
maximum............kg of weight over one square meter of the paltfom

A- Medium, 120

B- Light, 240

C- Light, 120 √

D- Medium, 240

8- Which part of the scaffolding is not allowed to construct with mobile and tower according to
Aramco?

A- Guardrail

B- Lift

C- Bay

D- Cantilever √

9- Maximum distance between two posts of a Tower scaffolding for light duty is

A- 1.5 meters

B-. 2.5 meters

C-. 2 meters √

D-. 3 meters

10- Minimum Diameter of a Caster for a light duty mobile scaffold should be
A- 4"

B- 7"

C- 6"

D- 5" √

1- Who can write lifting plan

A- Rigger 1

B- Rigger 2

C- Rigger 3

D- A and B √

2. Excavation plan is required for all types of soils if total depth of the Excavation is more than

A- 15 feet √

B- 18 feet

C- 20 feet ❌

D- 30 feet

3- Minimum Diameter of the Caster for medium duty mobile scaffold is

A- 5"

B- 8"

C- 7"√

D- 10"

4- Which weight is critical lifting. Select all possible answers.


A- 39 Tons

B- 40 Tons√

C- 41 Tons√

D-. 20 tons

5- Slope for B type soil is

A- 34°

B- 45°√

C- 54°

D- 90°

6- Maximum distance between two access points in a trench should b

A- 20 meters

B- 15 meters √

C- 7.5 meters

D- 10 meters

7- Which percentage of rated load capacity is critical lifting

A- 85%

B- 86%√

C- 75%

D- 70%
8- During Tandem, tailing turning lifts. Crane's load chart will be derated

A- 50%

B- 25% √

C- 75%

D- 85%

9- Maximum...........part of the screw jack can b adjusted ( threaded area of the jack outside the post)

A- 1/3

B- 1/4

C- 2/3 √

10- Guardrail's maximum height is?

1- 38"

B- 40"

C- 45" √

D- 50"

1- A node point is the connection point of

A- Screw jack and post

B- Toe board and platform


C- Ledger and posts✔️

D-. Ladder and platform

2- Minimum angle of vertical bracing is

A- 45°

B- 55°

C- 35°✔️

D- 65°

3- Maximum angle for vertical bracing is

A- 45°

B- 55°✔️

C- 35°

D- 65°

4- We're going to install X bracing on the width of the Scaffold, how many maximum Open lifts can be
without bracing vertically?

A- 3

B- 2✔️

C- 1

D-. 4

5- Maximum distance between bracing tube and node point should be


A- 10"

B- 12"✔️

C- 14"

D- 15"

6- We're going to make a splice of two bracing tube. Minimum area of the tubes should be spliced is

A- 10"

B- 14"

C- 12"✔️

D- 15"

7- Toe board height should be

A- 6" maximum

B- 4" minimum✔️

C- 5" maximum

D- 4" maximum

8- Guardrail's minimum height should be

A- 36"

B- 35"

C- 38"✔️

D- 45"
9- Ladder slope should be

A- 4:1✔️

B- 1:4

C- 3:1

D. 1:3

10- Guardrail's Maximum height should be

A- 36"

B- 35"

C- 38"

D- 45"✔️

1- Example of a Confined space is

A- 2 feet deep excavation

B- 3 feet deep excavation

C- 4 feet and deeper √

D- 3.5 feet

2- a stand by man can leave the place only if

A- He's extreme need to use washroom

B- He's very hungry

C- if another stand by man is appointed √


D- If he's an important phone call

3- A stand by man only understands English language while a worker in the group only understands
Arabic language. What must be done here.

A- Arabic speaker can use Google translator

B- He can communicate with stand by man using hand signals

C- He can't enter confined space √

D- Language doesn't matter

4- Which one is a Confined space

A- Top of mountain because there's oxygen deficiency

B- An enclosed tank with no toxic gases and has good oxygen level √

C- 2 feet deep trench with H2S presence

D- ground level with carbon monoxide presence

5- A generator is being used outside an Excavation 5 feet deep. Workers are inside excavation. What
should be done?

A- Generator is outside excavation. No problem


B- Generator can't be used near excavation √❌

C- Wind direction should be checked, it can carry carbon monoxide into the Excavation. Wind direction
should be opposite to the Excavation √

D-. Workers must use masks inside excavation

6- Which fire extinguisher can't be used inside a Confined space

A- Dry chemical powder

B- Carbon dioxide /

C- Water

D- wet chemical

7- A confined space found with NORMs . How many hours a continuous mechanical ventilation must be
performed prior to gas test and entry?

A- Maximum 4 hours

B- Minimum 3 hours √

C- Minimum 4 Hours ❌

D- minimum 2 hours

8- Who should check work permit prior to enter a confined space

A- Safety officer

B- Stand by man

C- Entrants
D- All above √

9- Which one is the most important precaution for confined space

A- A ladder

B- A fire extinguisher

C- A gas test √

D- A Light

10- If all workers are unconscious inside confined space because of H2S leakage. What should a stand by
man do? Select more than one

A- Wear SCBA,Enter confined space and bring workers out

B- He can't enter confined space even in this situation, he's to call emergency rescue team.√

C- He should Call Saudi Aramco

D. He Can only bring workers out without entering, if this confined space is none-entry confined space
and they are using Retrieval System for rescue√

1- Which activities need continue ventilation all the time from entry to exit.

A- Masonry work

B- Scaffold erection

C- Welding and painting √

D- Carpentry work
2- Which one is safe oxygen level to work in confined space according to Aramco?

A- 19% - 23.5%

B- 19.5%- 23%

C- 20%- 23%

D- 20% - 23.5%√

3- We can work on normal routine without using SCBA in confined space if carbon monoxide level is.

A- 100PPM

B- 35 PPM

C- Under 35 PPM√

D- 10PPM

4- We can work on normal routine without using SCBA in confined space if Hydrogen Sulphide level is.

A- 20 PPM

B- Under 100 PPM

C- 10 PPM

D- Under 10 PPM √

5- PPM stands for?

A- Part per month

B- Part per minute

C- Part per million √


D-. Part per meter

6- IDLH level means ....?

A- We can work normal

B- We can't work without SCBA

C- We can't enter the area √

D- All above

7- To perform gas test we should stop mechanical ventilation........... minutes before ?

A- 20 minutes maximum

B- 15 minutes minimum

C- 15 minutes minimum √

D- 10 minutes minimum

8- To perform welding activity. LEL should be

A- 20%

B- 10%

C- 0 % √

D- 5%

9- If we cross this limit, it will be dangerous for us.

A- Daily sleeping limit

B- swimming limit
C- Walking limit

D- Threshold limit Value √

10- LEL stands for

A- least exposure limit

B- Lower explosive limit √

C- Lover Entertainment level

D. Light Exposure level

1- Which depth of excavation is a confined space? Select all correct options.

A- 3 feet

B- 4 feet√

C- 5 feet ❌

D- 6 feet ❌

2- Which one is safe oxygen level to work in confined space?

A- 19% - 23.5%

B- 19.5%- 23%

C- 20%- 23%

D- 20% - 23.5%√

3- Slope for B type soil excavation should be .


A- 53°

B- 45°√

C- 34°

D- 35°

4- Oxygen cylinder should be away from LPG cylinder vertically. Minimum .

A- 20 feet √

B- 20 feet

C- 5 feet ❌

D- 8 feet

5- Which percentage of the load chart is a critical lifting?

A- 80%

B- 85%

C- 86%√

D-. 70%

6- Which load is a critical lifting.?

Select all correct options.

A- 39 tons

B- 40 tons√

C- 45 tons √

D- 20 tons
7- Excavation plan is required for B and C type soil if depth is ?

A- 6 feet

B- 7 feet √

C- 8 feet

D- 9 feet ❌

8- Toe board's minimum height should be

A- 3"

B- 4"√

C- 6"

D- 8"

9- Guardrail minimum height should be

A- 35"

B- 45"

C- 38"√

D- 49"

10- Maximum allowable wind speed for man basket lifting is

A- 32 Kph

B- 25 Kph √

C- 20 kph

D. 35 kph
11. Crane's load chart will be derated.......% of the capacity for tandem lifting.

A. 75%

B. 50%

C. 25%√

D. 80%

12. We can work without SCBA if hydrogen Sulphide concentration is

A. 15 PPM

B. 20 PPM

C. 8 PPM√

D. 12 PPM

13. Rigger level............can write Lift plan but only rigger..... Can approve it

A. (2 and 3) (2)

B. (1 and 3) ( 1)√

C. ( 1 and 2) (1)√❌

D. ( 3 and 2) (3)

14. Select all safety devices in a crane.

A. Anemometre√

B. Anti two block√

C. Load cell❌

D. Hook
15. A ladder should be extended from landing point minimum.

Select all correct options.

A. 0.9 meter√

B. 3 feet√

C. 2 feet

D. 1 feet

16. Distance between 2 ladders in a trench should be

A. 7.5 meters

B. 50 meters

C. 15 meters√

D. 20 meters

17. Diameter of a Caster used for medium duty mobile scaffold should be, minimum?

A. 5"

B. 6"

C. 7"√

F. 10"

18. Minimum width of a scaffold platform should be.

A. 30"

B. 20"

C. 27"√

D. 15"
19. We can work normally in atmosphere if carbon monoxide level is

A. 34 PPM√

B. 40 PPM

C. 36 PPM

D. 50 PPM

20. We should not use machine to excavate within........ Meters of live pipeline. We should excavate
manually.

A. 10 meters

B. 6 meters

C. 3 meters√

D. 23 meters

1- Which depth of excavation is a confined space? Select all correct options.

A- 3 feet

B- 4 feet☑️

C- 5 feet ☑️

D- 2 feet

2- Excavation waste should be kept away from the edge ?

A- 2 meters minimum

B- 2 feet maximum

C- 4 feet minimum

D- 2 feet minimum ☑️
3- Pedestrian barricade should be away from the Excavation edge. Minimum?

A- 1 meter ☑️

B- 2 meter

C- 4 meter

D- 4 feet

4- A crane should be away from excavation

A- Double the depth

B- 2 meters

C- Equal to the depth ☑️

D- 5 feet

5- A loader is involved in backfilling activity. What's the safe distance from excavation for loader?

A- 2 meters

B- 3 meters

C- No limit ☑️

D-. 1 meter

6- Which excavation needs excavation plan, with following depths.?

Select all correct options.

A- 20 feet all type soil

B- 8 feet B,C type soil


C- 9 feet B,C type ☑️

D- 21 Feet all types of soils ☑️

7- Which excavation needs daily excavation checklist , with following depths?

Without underground utilities.

Select all correct options.

A- 4 Feet ☑️

B- 5 feet ☑️

C- 3 feet

D- 3.9 feet

8- What's the right slope for C type soil excavation?

A- 45°

B- 53°

C- 34°☑️

D- 35°

9- Within how many meters we can't use machines for excavation (digging)from live oil pipeline?.

A- 6 meters

B- 5 meters

C- 3 meters ☑️

D- 2 meters
10- Select all precautions you think will be applied for excavation?

A- Barricades☑️

B- Signages ☑️

C- Blinking lights☑️

D. Anti two block

11. Scaffolding should be away from excavation?

A. 2 meters

B. 3 meters

C. Double the depth

D. 1.5 times of the depth☑️

12. We have one 15 meters long trench. Apply minimum ladders for access?

A. 2 ☑️

B. 1❌

C. 3

D. 4

13. A pick up should stay away from excavation edge minimum? If excavation depth is 1 meter.

A. 1 meter

B. 2 meters☑️

C. 3 meters
D. 4 meters

14. A pick up should stay away from excavation edge minimum, if depth is 3 meters?

A. 6 meters

B. 2 meters

C. 3 meters☑️

D. 2 meters

15. An Excavation checklist is required for which depth?

If underground utilities are present?

Select all correct options.

A. 1 foot

B. 2 feet☑️

C. 1.9 feet☑️

D. 3 feet☑️

1- We don't need sole board under scaffolding if base support is

A- Asphalt

B- Level Ground

C- Level concrete✔️

D- over blocks

2- Top rail's maximum height is......


A- 40"

B- 38"

C- 45"✔️

D- 35"

3- Toe board's minimum height is..... .

A- 12"

B- 4"✔️

C- 6"

D- 5"

4- Toe board's minimum thickness is...... .

A- 1.5"

B- 1"✔️

C- 2 "

D- 3"

5- Distance between bracing and node point should be ?

A- Within 10"

B- 15"

C- 8"
D-. Within 12"✔️

6- 230 kg weight over one square meter of the Scaffolding platform is.....?

A- light duty

B- medium duty ❌

C- special duty ✔️

D- heavy duty

7- Base plate measurement is..... Minimum?

A- 4"X4"

B- 5"X5"

C- 6"X6"✔️

D- 10"X10"

8- A lift height can not be more than........ Meter high?

A- 1

B- 2✔️

C- 4

D- 3

9- A screw Jack's threaded area should be outside of the post maximum......?

A- 1/3
B- 2/3✔️

C- 1/4

D- 1/2

10- Vertical distance between 2 ties should not be more than......?

A- 8 meter ✔️

B- 9 meter

C- 5 meters

D- 10 meters

11. Gape between platform planks should not be more than.....?

A. 2"

B. 1"✔️

C. 4"

D. 3"

12. Overlap of the platform planks should be

A. 10" maximum

B. 12" maximum✔️

C. 12" minimum❌

D. 15" minimum

13. Diameter of the Caster for light duty mobile scaffold should be
A. 7" maximum

B. 5" minimum✔️

C. 5" maximum

D. 8" minimum

14. We can't provide single sole board under two posts .

In this case we can provide a sole board under only one post but it's length should be....... minimum.

A. 20"

B. 15"

C. 30"✔️

D. 40"

15. A guardrail should be capable to bear minimum.........kg of force from all directions?

A. 23 kg

B. 200 kg

C. 90 kg✔️

D. 500 kg

16. We can make a raker splicing two or more tubes to support scaffold if this joint is made with 4
couplers.

A. True

B. False

C. We can't make raker splicing tubes. Raker is always single tube.✔️

D. We can make splice if height is under 6 meters


17. Any base supported scaffold needs a tie when it reaches the........ Height

A. 4:1✔️

B. 1:4

C. 3:1

D. 1:3

18. To reach over platform, step through opening in guardrail should be.......wide

A. 27" maximum✔️ minimum

B. 30" maximum❌

C. 27" maximum

D. 36"

19. Maximum gape between platform surface and toe board should be.......

A. 6 mm✔️

B. 8 mm

C. 10 mm

D. 12mm

20. We're going to install ties.

We've to install total 10 ties on a scaffold.

How many reveal ties can we install?

A. All 10

B. 8
C. 5 maximum✔️

D. 2

Maximum distance between two posts of a Tower scaffolding for light duty is

A- 1.5 meters

B-. 2.5 meters √

C-. 2 meters ❌

D-. 3 meters

2- Which part of the scaffolding is not allowed to construct with mobile and tower according to
Aramco?

A- Guardrail

B- Lift

C- Bay

D- Cantilever √

3-First rung of the ladder with mobile scaffold should be....... from ground level.

A- within 3 feet

B- within 2 feet √

C- 2.5

D- 4

4- Height of mobile/tower scaffold should not exceed..........Times of the minimum Base dimension

A- 2
B- 3√

C- 4❌

D- 5

5-During Tandem, tailing turning lifts. Crane's load chart will be derated

A- 50%

B- 25% √

C- 75%

D- 85%

6-Which percentage of rated load capacity is critical, lifting

A- 85%

B- 86%√

C- 75%

D- 70%

7-Maximum distance between two ladders in a trench should b

A- 20 meters

B- 15 meters √

C- 7.5 meters

D- 10 meters

8-Slope for B type soil is


A- 34°

B- 45°√

C- 54°

D- 90°

9-Which weight is critical lifting. Select all possible answers.

A- 39 Tons

B- 40 Tons√

C- 41 Tons√

D-. 20 tons

10-An excavation plan is required for all types of soils if the total depth of the excavation is more than

A- 15 feet

B- 18 feet

C- 20 feet √

D- 30 feet

11-Ladder slope should be

A- 4:1(75°)√

B- 4:1(70°)

C- 1:4(80°)

D. 1:3 (60°)

12:We're going to make a splice of two bracing tube. Minimum area of the tubes should be spliced is

A- 10"
B- 14"

C- 12"√

D- 15"

13: Maximum distance between bracing tube and node point should be

A- 10"

B- 12"√

C- 14"

D- 15"

14: Vertical bracing angle should be between.

A- 20-40°

B- 35-55°√

C- 35-59°

D- 40-70°

15-We are going to use 3 cranes for tandem lift.

How many critical lift plans required?

A- only one for all

B- 3 lift plans, one for each √

C- No lift plan required

16-Which activities need continue ventilation all the time from entry to exit.

A- Masonry work

B- Scaffold erection
C- Welding and painting √

D- Carpentry work

17-Which one is safe oxygen level to work in confined space according to Aramco?

A- 19% - 23.5%

B- 19.5%- 23%

C- 20%- 23%

D- 20% - 23.5%√

18- We can work on normal routine without using SCBA in confined space if carbon monoxide level is.

A- 100PPM

B- 35 PPM

C- Under 35 PPM√

D- 10PPM

19-To perform welding activity. LEL should be

A- 20%

B- 10%

C- 0 %√

D- 5%

20- Which depth of excavation is a confined space? Select all correct options.

A- 3 feet

B- 4 feet√

C- 5 feet √
D- 6 feet√

1- Which activities need continue ventilation all the time from entry to exit.

A- Masonry work

B- Scaffold erection

C- Welding and painting √

D- Carpentry work

2- Which one is safe oxygen level to work in confined space according to Aramco?

A- 19% - 23.5%

B- 19.5%- 23%

C- 20%- 23%

D- 20% - 23.5%√

3- We can work on normal routine without using SCBA in confined space if carbon monoxide level is.

A- 100PPM

B- 35 PPM

C- Under 35 PPM√

D- 10PPM

4- We can work on normal routine without using SCBA in confined space if Hydrogen Sulphide level is.

A- 20 PPM
B- Under 100 PPM

C- 10 PPM

D- Under 10 PPM √

5- PPM stands for?

A- Part per month

B- Part per minute

C- Part per million √

D-. Part per meter

6- IDLH level means ....?

A- We can work normal

B- We can't work without SCBA

C- We can't enter the area √

D- All above

7- To perform gas test we should stop mechanical ventilation........... minutes before ?

A- 20 minutes maximum

B- 15 minutes minimum √

C- 15 minutes maximum

D- 10 minutes minimum

8- To perform welding activity. LEL should be


A- 20%

B- 10%

C- 0 %√

D- 5%

9- If we cross this limit, it will be dangerous for us.

A- Daily sleeping limit

B- swimming limit

C- Walking limit

D- Threshold limit Value √

10- LEL stands for

A- least exposure limit

B- Lower explosive limit √

C- Lover Entertainment level

D. Light Exposure level

11- Guardrail's capacity should be......... Minimum

A. 100 kg

B. 200 kg

C. 90 kg√

D. 50 kg

12. We have to follow complete fall protection when we reach....... Height


A. 5 feet

B. 10 feet

C. 6 feet and more √

D. 20 feet

13. A person falls from height wearing full body harness and connected with anchor point is an example
of.....

A. Fall Restrain System

B. Fall Protection (fixed)

C. Fall arrest system√

F. Falling object

14. We're going to work on flat roof top.

We must keep our workers away from edge......... Minimum

A. 4 feet

B. 3 feet

C. 5 feet

D. 6 feet √

15. Toe board is installed to protect........ From falling

A. Workers

B. Material √

C. Top rail

D. Platform planks
1- We use toe board to protect………. From falling
A- Workers
B- Material ☑️
C- Guardrail
D- Platform

2- We need complete fall protection from……….. Height?


A- 2 feet height
B- 50 feet
C- 6 feet and more ☑️
D- 18.5 feet

3- Which type of device is preferred to connect lanyard with harness?


A- Manual Locking Hooks
B- Hooks
C- Self closing hooks ☑️
D- Nothing

4- After a fall arrest We can use system again


A- Only Changing lanyard
B- Replacing Harness
C- We can’t use it again ☑️
D- We can use the same system

5- You are working at 4 feet high platform. Which Safety device with full body harness you need to
hold you after fall ?
A- Shock absorbing lanyard
B- Guardrail
C- Self Retracting Lifeline/Lanyard ✓
D- Toe board

6- Minimum Capacity of Harness?


A- 2300 kg ☑️
B- 1500 kg
C- 2500 kg
D- 1500 kg
7- Minimum Capacity of D ring?.
A- 2300 kg ☑️
B- 1500 kg
C- 2500 kg
D- 1500 kg

8- Minimum Capacity of Self closing hooks ?


A- 2268 kg ☑️
B- 1500 kg
C- 2500 kg
D- 1500 kg

9- Minimum Capacity of Lanyard ?.


A- 6000 pounds
B- 4000 pounds
C- 4500 pounds
D- 5000 pounds ☑️

10- Minimum Capacity of Anchor point ?


A- 2300 kg (5000, lbs) ☑️
B- 1500 kg (4000, lbs)
C- 2500 kg (6000, lbs)
D- 2300 kg(6000 ,lbs)

11. Minimum diameter of horizontal life line ?

A. 15 mm

B. 10 mm

C. 13 mm

D. 25 mm

12. Minimum diameter of vertical life line ?

A. 13 mm

B. 12 mm
C. 10 mm

D. 8 mm

13. How many Clamps required at the end of a life line .

A. 2 minimum

B. 3 maximum

C. 3 minimum

D. 4 minimum

14. Maximum allowable sag in life line between 2 anchor points ?

A. 10”

B. 15”

C. 12”

D. 8”

15. Minimum breaking strength of a horizontal life line?.

A. 5000 pounds

B. 2300 kg

C. 9000 kg(20000 pounds)

D. 2268 kg(5000 pounds)

16. How many persons can anchor their lanyard to lifeline between 2 anchor points at a time?

A. 2 maximum

B. 3 minimum

C. 4 minimum

D. 3 maximum
17. Minimum Capacity of vertical lifeline?

A. 6000 lbs

B. 5000 lbs

C. 4000 lbs

D. 3000 lbs

18. How many persons can anchor vertical lifeline at a time?

A. 2

B. Only one person at a time

C. 3

D. 4

19. While attaching clamps to the lifeline,U -Bolt of the clamp should be at…….

A. Dead End Side

B. Live End Side

C. In the center of both

20. Maximum distance between 2 clamps should be

A. 3 times of the lifeline diameter

B. 5 times of the lifeline diameter

C. 4 times of the lifeline diameter

D. Double of the lifeline diameter

21. Fall Arrest Equipment Limits the arresting force to……

A. 900 kg

B. 818 kg( 1800 lbs)

C. 2300 kg(5000 lbs)

D. 2268 kg( 6000 lbs)


22. Shock absorbing lanyard limits the arresting force to…..

A. 400 kg ( 1000 ,lbs)

B. 500 kg ( 1500, lbs)

C. 408 kg(900,lbs)

D. 900 kg ( 1800 lbs)

23. After a fall arrest, what must be used? To prevent trauma?

A. Panadol

B. Safety helmet

C. Gloves

D. Suspension Trauma relief Straps

24. For roof work, Using fall restrain system, Workers and material should be kept……… Feet away from
edge.

A. 5 feet minimum

B. 6 feet maximum

C. 6 feet minimum

D. 4 feet minimum

25. You are going to use fall arrest system with shock absorbing lanyard. At what height from ground
level will you anchor your lanyard ?

A. Maximum 15 feet

B. Minimum 18.5 feet

C. 10 feet

D. Maximum 18.5 feet