The daily machine roving report requires mechanics and specialists to check all machines, report any machines not in use or with problems, and report any machines still undergoing repairs. The report tracks the status of each machine by area and barcode number, noting whether it is ready or damaged each day.
The daily machine roving report requires mechanics and specialists to check all machines, report any machines not in use or with problems, and report any machines still undergoing repairs. The report tracks the status of each machine by area and barcode number, noting whether it is ready or damaged each day.
The daily machine roving report requires mechanics and specialists to check all machines, report any machines not in use or with problems, and report any machines still undergoing repairs. The report tracks the status of each machine by area and barcode number, noting whether it is ready or damaged each day.
Mechanics/Specialist Are Responsible for testing and checking the machines not in u Report Submitted By: 1.Roving all the machines. 2.Report the machine not in use for all shift 3.Report the machines have problem on any of the machine Report Confirmed By: 4.Report the machines yet unfinished repairing . __________________ (SSMS) R=Ready, D=Damaged Responsible Area Machine MMS (CUT , 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb Finding/Major Function Error Barcode HT ,PPA,..ETC)