Professional Documents
Culture Documents
AVRAMESCU ANDREI
Electrical & Instrumentation Supervisor - Blueprojects
Ploiesti
Contact details
Online interview
About me
I have 13 years experience in instrumentation design for oil & gas projects (basic, feed & detail design engineering)
I issued documents like :
- datasheets, technical specifications, hook-upsmain cable routing, material take-off, junction boxes wiring diagram, fire & gas
specifications, loop diagrams, technical specifications, bid evaluation reports, sections for main cable routing, DCS/ESD
input-output lists, Wellhead control unit specification, CCTV, telecommunication system (PAGA), Power supply diagrams,
Cabinet drawings and wiring diagrams for automation/system cabinets (DCS/ESD/Marshalling/Network/Power distribution) in
Eplan/Autocad, Interconnection diagrams, Workflow Quotations, Tender/Proposals for instrumentation.
Procurement projects for instrumentation delivery - execution phase.
Construction projects related to electrical & instrumentation, supervisor for the execution phases including commissioning until
final reception of a project.
I obtained a certificate in Germany for Automotive Safety oriented hardware development acc to ISO 26262.
I have passed also the assessment for IEC 61508 Functional safety training.
Like a hobby i handle also with automotive VCDS Codings & Diagnose for VW. etc
Professional experience
www.ejobs.ro
CV Avramescu Andrei | Pag. 1/6
contact@ejobs.ro
Blue Projects Industries - https://www.blueprojects.com
Location : Dusseldorf, Germany - assigned to Cargill Butterfly expansion factory project in Krefeld.
Projects:
- site supervisor for construction of new factory (transformation from corn to wheat processing).
- responsible for more areas/buildings/systems : Wet Separation, Flour Mill, Electrical Building,
Control Room, Liquid Feed tanks, Wheat Precleaning, Gluten drying, Gluten loading etc.
- coordinate together with all contractors in site : civil (Mainka), mechanic (Fincimec, IMO, Ocrim),
steel structure (Frijns), tanks (Lipp), electrical & instrumentation (Actemium, Siemens, ABB).
- technical collaboration with engineering in site (Tehnip Spain).
- solving construction issues during execution and managing the contractors to fullfill the time
schedule and main scope of work.
- propose technical solutions in various phases of the project, submit site instructions for
engineering deviations.
- supervise electrical works : earthing layout, installation of underground HV cables, transformers
and switchgears in electrical building, HVAC panels, Lighting panels, MCC panels etc.
- supervise instrumentation works : installation of cable trays, instruments, junction boxes, fiber optic
patch panels, DCS/SIS cabinets.
Aug 2019 - Feb 2022 Lead Instrumentation Engineer - Habau PPS Pipeline Systems
2 years and 7 months Ploiesti | Engineering | Oil / Gas
o Participate in EPC (engineering,procurement, construction) tender phase for new gas compression station in
Serbia and 42km of gas pipeline to the border of Hungary.
- review of scope of work for EPC activities.
- check the basic design documentation submitted by South Stream Netherlands/Gazprom and prepare
proposals for E&I works/ equipments/ feed & detail design engineering phases.
o BRUA Transgaz:
- supervise fiber optic installation team on LOT 3 (including mounting of concrete chambers, perform splices,
junction boxes connections and final measurements of continuity for ~92km).
o SAT phase with new rest gas compressor system - checking loop test and the devices installed in container
(pressure/temperature transmitters, on-off valves, pneumatic control valves, instrument air pressure regulator
etc).
o Coordinate activities with client OMV and project engineering Bilfinger/ PSE Engineering Germany.
Installation of fiber optic from well sites to main station, integration in network cabinet with FO patch panels.
o Modify Siemens emergency control system cabinet (ESD) adding SIL3 relays for shutdown command of the
new compressor.
o Issue final as-built documentation, quality certificates and manufacturer declarations of conformity.
o Commissioning & E&I Inspector Engineer for Gas compression station Tintea.
May 2017 - Aug 2019 Hardware & System Engineer - Yokogawa Europe
2 years and 4 months Bucharest | Engineering | Oil / Gas
Main duties:
www.ejobs.ro
CV Avramescu Andrei | Pag. 2/6
contact@ejobs.ro
- Using Smart Plant Instrumentation (SPI INtools) to generate loop diagrams, I/O assignment to PLC modules,
cable connection to junction box & DCS/SIS.
- EPLAN Electric P8 - electrical schematics and build automation cabinet projects for Yokogawa
Germany/Netherlands/Russia.
- Using both English and German language for projects in EPLAN.
- Build entire structure of a cabinet generating table of contents, summarized parts list, outline, internal layout,
top view, name plates components, earthing principles, fault circuits, power supply 230Vac & 24Vdc, fan
supply, main feeders, terminal diagrams.
- Design of various type of cabinets like DCS with Centum VP / Safety Instrument Systems with Prosafe RS /
Power Distribution / Network / Server / Marshalling / Fiber Optic including Patch Panels and also detailed
network and system architecture for oil&gas projects.
- Procurement project for Instruments delivery (Transmitters, Flowmeters) : Spare Parts List for
Commissioning, Dimensional Drawings, SIL Declaration of Conformity, Inspection and Test Plan (ITP), Work
hours quotation for instrumentation etc.
- Visual Inspection and Functional Test for instruments using Fieldmate software at Yokogawa Germany.
- Logistic documentation for transport by sea.
- Prepare documentation hard-copy to be sent in Russia.
- Good relation with suppliers/contractors: Rota, Badotherm, Wika, Linde, Sami etc.
- Internal test for Yokogawa automation cabinet : Test Record System, Test Specification, Punch List.
- Around 15 projects involved until now, most of them with high value and
budget (10-20 million €).
- Project manager duties - second support.
Projects:
www.ejobs.ro
CV Avramescu Andrei | Pag. 3/6
contact@ejobs.ro
- Generate loop diagrams for ~15000 I/O signals with Smart Plant Instrumentation.
- Modify sequence of cable signals.
- Rearrange the link of cables from field, junction boxes up to control room (Marshalling/DCS/ESD).
Jul 2016 - Apr 2017 Design Instrumentation & Electrical Engineer - Syscom 18
10 months Bucharest | Engineering | Oil / Gas
Projects:
The burner plant for dryer chloride/potassium sulphate - S.C Azomures Targu Mures Romania:
- Electrical wirings for PLC automation cabinet for burner - (Unitronics V570)
Working like design engineer at Petrostar S.A. Ploiesti for instrumentation projects.
Experience in various type of documents for different oil & gas projects in Romania and abroad.
Projects:
www.ejobs.ro
CV Avramescu Andrei | Pag. 4/6
contact@ejobs.ro
Gas compression system Sinca Noua Brasov Romania (Transgaz):
- New gas station with 2 new compressors and manifold, instrumentation design with datasheets for all
instruments, valve sizing calculations, layout of cables in plant etc
IDU Flowstation - IDU phase 2 completion project and LP compressor installation for gas flare down , Nigeria:
- design of instrumentation project - 3 years
Education
2001 - 2005 High School / Vocational school - National College Mihai Viteazul
mathematical informatics | Ploiesti
Skills
General skills
Microsoft Excel, Adobe Photoshop, MATLAB, Simulink, target 3000, Aspen HYSYS, Microsoft Project, Microsoft PowerPoint,
Siemens Simatic Step 7, simatic tia portal, eplan electric p8, Adobe Acrobat Professional
www.ejobs.ro
CV Avramescu Andrei | Pag. 5/6
contact@ejobs.ro
Skills from work experience
AutoCAD, Progecad, Aspen HYSYS, Eplan, smart plant instrumentation
Foreign languages
Other info
Certifications
ISO 26262 Safety Hardware Development
acquired on Jun 2019
Attented at SGS Tuv Dortmund
Driving license
Category B
acquired on 17 Aug 2005
Desired job
CV saved in folders
www.ejobs.ro
CV Avramescu Andrei | Pag. 6/6
contact@ejobs.ro