You are on page 1of 24

ACTIVITIES OUTPUT PE

3 WORKER PRODUCTI
ITEM NO. WORK DESCRIPTION
LOW UNIT

A. UNDERGROUND PIPING AND PLUMBING WORKS -


1.00 LAYING ASBESTOS PIPES: -
1//2Ø 0.76 L.M.per hour
3/4" Ø 0.76 L.M.per hour
1 1/4" 0.68 L.M.per hour
1 1/2 TO 2" Ø 0.61 L.M.per hour
2 1/2" Ø 0.51 L.M.per hour
3" Ø 0.46 L.M.per hour
3 1/2" Ø 0.43 L.M.per hour
4" Ø 0.38 L.M.per hour
2.00 CAST IRON PIPE -
2" Ø 0.23 L.M.per hour
4" Ø 0.15 L.M.per hour
6" Ø 0.10 L.M.per hour
8" Ø 0.08 L.M.per hour
10" Ø 0.05 L.M.per hour
12" Ø 0.05 L.M.per hour
14" Ø 0.04 L.M.per hour
16" Ø 0.04 L.M.per hour
18" Ø 0.03 L.M.per hour
20" Ø 0.03 L.M.per hour
24" Ø 0.03 L.M.per hour
30" Ø 0.02 L.M.per hour
3.00 LAYING PVC PIPE -
1/2 TO 3/4" Ø 2.63 L.M.per hour
1 TO 1 1/4" Ø 0.68 L.M.per hour
1 1/2 TO 2" Ø 0.61 L.M.per hour
2 1/2" Ø 0.51 L.M.per hour
3" Ø 0.46 L.M.per hour
4" Ø 0.38 L.M.per hour
5" Ø 0.30 L.M.per hour
6" Ø 0.20 L.M.per hour
4.00 LAYING RCP 8 MEN (1 TEAM) -
24"Ø 0.11 L.M.per hour
36"Ø 0.08 L.M.per hour
48"Ø 0.05 L.M.per hour
6-18"Ø 0.38 L.M.per hour
-
LAYING OF 24"Ø RCP 0.13 PIPEper hour
LAYING OF 36"Ø RCP 0.08 PIPEper hour
LAYING OF 48"Ø RCP 0.05 PIPEper hour
-
B. INSULATION -
EQUIPMENT INSTALLATION -
VESSEL, EXCHANGE & TANKS -
FIELD FABRICATION INSULATION 0.20 S.M.per hour
FIELD FABRICATION SHEET METAL COVER 0.04 S.M.per hour
APPLY INSULATION 0.10 S.M.per hour
APPLY SHEET METAL COVER 0.10 S.M.per hour
PUMPS, COMPRESSORS & TURBINES -
FABRICATE 0.03 S.M.per hour
APPLY 0.02 S.M.per hour
PIPINGS AND COMPONENT INSULATION -
FIELD FABRICATE 0.13 FLG.per hour
FIELD FABRICATESHEET METAL COVER 0.63 S.M.per hour
APPLY INSULATION 0.19 L.M.per hour
APPLY SHEET METAL COVER OR METAL COVER 0.33 EACHper hour
FABRICATE INSTRUMENT COVER 0.06 EACHper hour
INSTALL INSTRUMENT COVER 0.08 EACHper hour
INSULATE PIPE HANGERS 0.13 EACHper hour
FOR STREAM TRACED LINES 0.14 L.M.per hour
REMOVAL OF OLD OR EXISTING INSTALLATION 0.33 L.M.per hour
-
C. FIRE PROOFING -
INSTALL STUDS 1.00 EACHper hour
INSTALL MESH 0.42 S.M.per hour
POURED -
FORMING 0.04 S.M.per hour
STRIP FORMS 0.08 S.M.per hour
POUR CONCRETE 0.01 S.M.per hour
CURING/PATCHING 0.83 S.M.per hour
FINISHING 0.71 S.M.per hour
TROWEL, PLASTERED 0.19 S.M.per hour
PNEUMATIC APPLICATION -
GUNITE 0.42 S.M.per hour
APPLY FINEBRICK OR BLOCK 0.63 PC.per hour
REMOVAL OF EXISTING OR OLD FIREPROOFING 0.20 S.M.per hour
APPLY FIREPROOFING PAINT 0.17 S.M.per hour
FIRE PROTERCTION: -
FIRE PROTECTION EQUIPMENT INSTALLATION: -
MONITOR 0.10 EACHper hour
HOSE REELS AND CARTS 0.03 EACHper hour
FIRE EXTINGUISHERS 0.10 EACHper hour
PERSONAL EQUIPMENT: -
EYE WASH 0.05 EACHper hour
SAFETY SHOWERS 0.05 EACHper hour
BREATHING APPARATUS 0.10 EACHper hour
SPRINKLER SYSTEM -
SPRAY NOZZLES 0.50 EACHper hour
WATER CANNONS 0.10 EACHper hour

D. HEATING, VENTILATING AND CONDITIONING -


HEAVY PIPING 0.14 L.M.per hour
DUCT WORK INSTALL 0.08 S.M.per hour
DUCT WORK FAB. 0.03 S.M.per hour
PACKAGE UNIT AIR CONDITIONER 0.02 EACHper hour
UNIT HEATER 0.04 EACHper hour
FINNED CONVERTER 0.10 EACHper hour
EXHAUST FAN PROPELLER 0.06 EACHper hour
GRAVITY ROOF PAINT 0.07 L.M.per hour
POWER ROOF VENT 0.02 EACHper hour
ROUND ROOF VENT 0.06 EACHper hour
PLUMBING PIPING 0.14 L.M.per hour
-
Q. MISCELLANEOUS -
WATER STOP INSTALLATION 0.75 L.M.per hour
CAULKING SLAB JOINT 2.50 L.M.per hour
ASPHALTING 0.63 S.M.per hour
GROUTNG AND TOOL PLASTERING 0.30 S.M.per hour
WATER PROOFING RUBBERIZED 0.91 S.M.per hour
COPPER CLADDING ROOF DECK 1.00 L.M.per hour
WATER PROOFING FLINKOTE 1.85 S.M.per hour
DEMOLITION OF ADOBE WALL 0.31 CU.M.per hour
PAINTING 1.47 S.M.per hour
COPPER WATER STOP CUT AND SHAPE 0.09 L.M.per hour
COPPER WATER STOP CUT AND INSTALLATION 0.05 L.M.per hour
SETTING ANCHOR BOLT 0.01 KGper hour
SETTING ANCHOR BOXES 0.27 CU.M.per hour
MANHOUR EQUIVALENT
OUTPUT PER HOUR ₱ 83.62 per hour in area of NCR
EQUIVALENT LABOR COST
3 WORKER PRODUCTIVITY RATE
AVERAGE UNIT HIGH UNIT LOW PESOS PER AVERAGE PESOS PER

- - ₱ - ₱ -
- - ₱ - ₱ -
1.52 L.M.per hour 1.89 L.M.per hour ₱ 110.38 per L.M. ₱ 55.19 per L.M.
1.52 L.M.per hour 1.89 L.M.per hour ₱ 110.38 per L.M. ₱ 55.19 per L.M.
1.35 L.M.per hour 1.69 L.M.per hour ₱ 123.76 per L.M. ₱ 61.88 per L.M.
1.22 L.M.per hour 1.52 L.M.per hour ₱ 137.14 per L.M. ₱ 68.57 per L.M.
1.02 L.M.per hour 1.43 L.M.per hour ₱ 164.73 per L.M. ₱ 81.95 per L.M.
0.93 L.M.per hour 1.16 L.M.per hour ₱ 180.62 per L.M. ₱ 90.31 per L.M.
0.87 L.M.per hour 1.09 L.M.per hour ₱ 192.33 per L.M. ₱ 96.16 per L.M.
0.76 L.M.per hour 0.94 L.M.per hour ₱ 220.76 per L.M. ₱ 110.38 per L.M.
- - ₱ - ₱ -
0.46 L.M.per hour 0.57 L.M.per hour ₱ 366.25 per L.M. ₱ 183.13 per L.M.
0.30 L.M.per hour 0.38 L.M.per hour ₱ 550.22 per L.M. ₱ 275.11 per L.M.
0.20 L.M.per hour 0.25 L.M.per hour ₱ 822.82 per L.M. ₱ 411.41 per L.M.
0.15 L.M.per hour 0.19 L.M.per hour ₱ 1,098.76 per L.M. ₱ 549.38 per L.M.
0.10 L.M.per hour 0.13 L.M.per hour ₱ 1,647.31 per L.M. ₱ 823.65 per L.M.
0.10 L.M.per hour 0.12 L.M.per hour ₱ 1,724.24 per L.M. ₱ 862.12 per L.M.
0.08 L.M.per hour 0.10 L.M.per hour ₱ 2,015.24 per L.M. ₱ 1,007.62 per L.M.
0.07 L.M.per hour 0.09 L.M.per hour ₱ 2,289.51 per L.M. ₱ 1,144.75 per L.M.
0.07 L.M.per hour 0.08 L.M.per hour ₱ 2,565.46 per L.M. ₱ 1,282.73 per L.M.
0.06 L.M.per hour 0.08 L.M.per hour ₱ 2,747.75 per L.M. ₱ 1,373.87 per L.M.
0.06 L.M.per hour 0.07 L.M.per hour ₱ 3,022.02 per L.M. ₱ 1,511.01 per L.M.
0.05 L.M.per hour 0.06 L.M.per hour ₱ 3,435.10 per L.M. ₱ 1,717.55 per L.M.
- - ₱ - ₱ -
5.26 L.M.per hour 6.67 L.M.per hour ₱ 31.78 per L.M. ₱ 15.89 per L.M.
1.35 L.M.per hour 1.69 L.M.per hour ₱ 123.76 per L.M. ₱ 61.88 per L.M.
1.22 L.M.per hour 1.52 L.M.per hour ₱ 137.14 per L.M. ₱ 68.57 per L.M.
1.02 L.M.per hour 1.28 L.M.per hour ₱ 163.89 per L.M. ₱ 81.95 per L.M.
0.93 L.M.per hour 1.16 L.M.per hour ₱ 180.62 per L.M. ₱ 90.31 per L.M.
0.76 L.M.per hour 0.95 L.M.per hour ₱ 219.08 per L.M. ₱ 109.54 per L.M.
0.61 L.M.per hour 0.76 L.M.per hour ₱ 274.27 per L.M. ₱ 137.14 per L.M.
0.41 L.M.per hour 0.51 L.M.per hour ₱ 411.41 per L.M. ₱ 205.70 per L.M.
- - ₱ - ₱ -
0.25 L.M.per hour 0.31 L.M.per hour ₱ 752.58 per L.M. ₱ 334.48 per L.M.
0.16 L.M.per hour 0.20 L.M.per hour ₱ 1,070.33 per L.M. ₱ 535.17 per L.M.
0.09 L.M.per hour 0.12 L.M.per hour ₱ 1,784.45 per L.M. ₱ 892.22 per L.M.
0.75 L.M.per hour 0.94 L.M.per hour ₱ 222.43 per L.M. ₱ 111.21 per L.M.
- - ₱ - ₱ -
0.25 PIPEper hour 0.31 PIPEper hour ₱ 668.96 per PIPE ₱ 334.48 per PIPE
0.16 PIPEper hour 0.20 PIPEper hour ₱ 1,070.33 per PIPE ₱ 535.17 per PIPE
0.09 PIPEper hour 0.12 PIPEper hour ₱ 1,782.77 per PIPE ₱ 891.39 per PIPE
- - ₱ - ₱ -
- - ₱ - ₱ -
- - ₱ - ₱ -
- - ₱ - ₱ -
0.40 S.M.per hour 0.50 S.M.per hour ₱ 418.10 per S.M. ₱ 209.05 per S.M.
0.08 S.M.per hour 0.10 S.M.per hour ₱ 2,006.88 per S.M. ₱ 1,003.44 per S.M.
0.20 S.M.per hour 0.25 S.M.per hour ₱ 836.20 per S.M. ₱ 418.10 per S.M.
0.20 S.M.per hour 0.25 S.M.per hour ₱ 836.20 per S.M. ₱ 418.10 per S.M.
- - ₱ - ₱ -
0.06 S.M.per hour 0.07 S.M.per hour ₱ 2,843.07 per S.M. ₱ 1,421.54 per S.M.
0.03 S.M.per hour 0.04 S.M.per hour ₱ 5,017.19 per S.M. ₱ 2,508.59 per S.M.
- - ₱ - ₱ -
0.25 FLG.per hour 0.31 FLG.per hour ₱ 668.96 per FLG. ₱ 334.48 per FLG.
1.25 S.M.per hour 1.56 S.M.per hour ₱ 133.79 per S.M. ₱ 66.90 per S.M.
0.37 L.M.per hour 0.46 L.M.per hour ₱ 451.55 per L.M. ₱ 225.77 per L.M.
0.67 EACHper hour 0.83 EACHper hour ₱ 250.86 per EACH ₱ 125.43 per EACH
0.13 EACHper hour 0.16 EACHper hour ₱ 1,337.92 per EACH ₱ 668.96 per EACH
0.17 EACHper hour 0.21 EACHper hour ₱ 1,003.44 per EACH ₱ 501.72 per EACH
0.25 EACHper hour 0.31 EACHper hour ₱ 668.96 per EACH ₱ 334.48 per EACH
0.27 L.M.per hour 0.34 L.M.per hour ₱ 618.79 per L.M. ₱ 309.39 per L.M.
0.67 L.M.per hour 0.83 L.M.per hour ₱ 250.86 per L.M. ₱ 125.43 per L.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
2.00 EACHper hour 2.50 EACHper hour ₱ 83.62 per EACH ₱ 41.81 per EACH
0.83 S.M.per hour 1.04 S.M.per hour ₱ 200.69 per S.M. ₱ 100.34 per S.M.
- - ₱ - ₱ -
0.07 S.M.per hour 0.09 S.M.per hour ₱ 2,341.35 per S.M. ₱ 1,170.68 per S.M.
0.17 S.M.per hour 0.21 S.M.per hour ₱ 1,003.44 per S.M. ₱ 501.72 per S.M.
0.01 S.M.per hour 0.02 S.M.per hour ### per S.M. ₱ 5,853.39 per S.M.
1.67 S.M.per hour 2.08 S.M.per hour ₱ 100.34 per S.M. ₱ 50.17 per S.M.
1.43 S.M.per hour 1.79 S.M.per hour ₱ 117.07 per S.M. ₱ 58.53 per S.M.
0.37 S.M.per hour 0.46 S.M.per hour ₱ 451.55 per S.M. ₱ 225.77 per S.M.
- - ₱ - ₱ -
0.83 S.M.per hour 1.04 S.M.per hour ₱ 200.69 per S.M. ₱ 100.34 per S.M.
1.25 PC.per hour 1.56 PC.per hour ₱ 133.79 per PC. ₱ 66.90 per PC.
0.40 S.M.per hour 0.50 S.M.per hour ₱ 418.10 per S.M. ₱ 209.05 per S.M.
0.33 S.M.per hour 0.42 S.M.per hour ₱ 501.72 per S.M. ₱ 250.86 per S.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
0.20 EACHper hour 0.25 EACHper hour ₱ 836.20 per EACH ₱ 418.10 per EACH
0.07 EACHper hour 0.08 EACHper hour ₱ 2,508.59 per EACH ₱ 1,254.30 per EACH
0.20 EACHper hour 0.25 EACHper hour ₱ 836.20 per EACH ₱ 418.10 per EACH
- - ₱ - ₱ -
0.10 EACHper hour 0.13 EACHper hour ₱ 1,672.40 per EACH ₱ 836.20 per EACH
0.10 EACHper hour 0.13 EACHper hour ₱ 1,672.40 per EACH ₱ 836.20 per EACH
0.20 EACHper hour 0.25 EACHper hour ₱ 836.20 per EACH ₱ 418.10 per EACH
- - ₱ - ₱ -
1.00 EACHper hour 0.01 EACHper hour ₱ 167.24 per EACH ₱ 83.62 per EACH
0.20 EACHper hour 0.25 EACHper hour ₱ 836.20 per EACH ₱ 418.10 per EACH

- - ₱ - ₱ -
0.29 L.M.per hour 0.36 L.M.per hour ₱ 585.34 per L.M. ₱ 292.67 per L.M.
0.17 S.M.per hour 0.21 S.M.per hour ₱ 1,003.44 per S.M. ₱ 501.72 per S.M.
0.06 S.M.per hour 0.07 S.M.per hour ₱ 3,010.31 per S.M. ₱ 1,505.16 per S.M.
0.04 EACHper hour 0.05 EACHper hour ₱ 4,013.75 per EACH ₱ 2,006.88 per EACH
0.08 EACHper hour 0.10 EACHper hour ₱ 2,006.88 per EACH ₱ 1,003.44 per EACH
0.20 EACHper hour 0.25 EACHper hour ₱ 836.20 per EACH ₱ 418.10 per EACH
0.13 EACHper hour 0.16 EACHper hour ₱ 1,337.92 per EACH ₱ 668.96 per EACH
0.14 L.M.per hour 0.17 L.M.per hour ₱ 1,170.68 per L.M. ₱ 610.42 per L.M.
0.04 EACHper hour 0.05 EACHper hour ₱ 4,013.75 per EACH ₱ 2,006.88 per EACH
0.13 EACHper hour 0.16 EACHper hour ₱ 1,337.92 per EACH ₱ 668.96 per EACH
0.29 L.M.per hour 0.36 L.M.per hour ₱ 585.34 per L.M. ₱ 292.67 per L.M.
- - ₱ - ₱ -
- - ₱ - ₱ -
1.49 L.M.per hour 1.85 L.M.per hour ₱ 112.05 per L.M. ₱ 56.03 per L.M.
5.00 L.M.per hour 6.25 L.M.per hour ₱ 33.45 per L.M. ₱ 16.72 per L.M.
1.25 S.M.per hour 1.56 S.M.per hour ₱ 133.79 per S.M. ₱ 66.90 per S.M.
0.60 S.M.per hour 1.19 S.M.per hour ₱ 279.29 per S.M. ₱ 139.65 per S.M.
1.82 S.M.per hour 3.57 S.M.per hour ₱ 91.98 per S.M. ₱ 45.99 per S.M.
2.00 L.M.per hour 4.00 L.M.per hour ₱ 83.62 per L.M. ₱ 41.81 per L.M.
3.70 S.M.per hour 7.14 S.M.per hour ₱ 45.15 per S.M. ₱ 22.58 per S.M.
0.63 CU.M.per hour 1.25 CU.M.per hour ₱ 267.58 per CU.M. ₱ 133.79 per CU.M.
2.94 S.M.per hour 5.88 S.M.per hour ₱ 56.86 per S.M. ₱ 28.43 per S.M.
0.17 L.M.per hour 33.33 L.M.per hour ₱ 919.82 per L.M. ₱ 501.72 per L.M.
0.09 L.M.per hour 16.67 L.M.per hour ₱ 1,839.64 per L.M. ₱ 919.82 per L.M.
0.02 KGper hour 4.17 KGper hour ₱ 8,111.12 per KG ₱ 4,097.37 per KG
0.55 CU.M.per hour 1.10 CU.M.per hour ₱ 304.38 per CU.M. ₱ 152.19 per CU.M.
LENT

ABOR COST

HIGH PESOS PER

₱ -
₱ -
₱ 44.32 per L.M.
₱ 44.32 per L.M.
₱ 49.34 per L.M.
₱ 55.19 per L.M.
₱ 58.53 per L.M.
₱ 71.91 per L.M.
₱ 76.93 per L.M.
₱ 88.64 per L.M.
₱ -
₱ 146.33 per L.M.
₱ 219.92 per L.M.
₱ 329.46 per L.M.
₱ 439.84 per L.M.
₱ 667.29 per L.M.
₱ 689.86 per L.M.
₱ 806.09 per L.M.
₱ 915.64 per L.M.
₱ 1,026.01 per L.M.
₱ 1,098.76 per L.M.
₱ 1,209.14 per L.M.
₱ 1,373.87 per L.M.
₱ -
₱ 12.54 per L.M.
₱ 49.34 per L.M.
₱ 55.19 per L.M.
₱ 65.22 per L.M.
₱ 71.91 per L.M.
₱ 87.80 per L.M.
₱ 109.54 per L.M.
₱ 164.73 per L.M.
₱ -
₱ 267.58 per L.M.
₱ 428.13 per L.M.
₱ 714.11 per L.M.
₱ 88.64 per L.M.
₱ -
₱ 267.58 per PIPE
₱ 428.13 per PIPE
₱ 713.28 per PIPE
₱ -
₱ -
₱ -
₱ -
₱ 167.24 per S.M.
₱ 802.75 per S.M.
₱ 334.48 per S.M.
₱ 334.48 per S.M.
₱ -
₱ 1,137.23 per S.M.
₱ 2,006.88 per S.M.
₱ -
₱ 267.58 per FLG.
₱ 53.52 per S.M.
₱ 180.62 per L.M.
₱ 100.34 per EACH
₱ 535.17 per EACH
₱ 401.38 per EACH
₱ 267.58 per EACH
₱ 247.51 per L.M.
₱ 100.34 per L.M.
₱ -
₱ -
₱ 33.45 per EACH
₱ 80.28 per S.M.
₱ -
₱ 936.54 per S.M.
₱ 401.38 per S.M.
₱ 4,682.71 per S.M.
₱ 40.14 per S.M.
₱ 46.83 per S.M.
₱ 180.62 per S.M.
₱ -
₱ 80.28 per S.M.
₱ 53.52 per PC.
₱ 167.24 per S.M.
₱ 200.69 per S.M.
₱ -
₱ -
₱ 334.48 per EACH
₱ 1,003.44 per EACH
₱ 334.48 per EACH
₱ -
₱ 668.96 per EACH
₱ 668.96 per EACH
₱ 334.48 per EACH
₱ -
₱ 6,689.58 per EACH
₱ 334.48 per EACH

₱ -
₱ 234.14 per L.M.
₱ 401.38 per S.M.
₱ 1,204.13 per S.M.
₱ 1,605.50 per EACH
₱ 802.75 per EACH
₱ 334.48 per EACH
₱ 535.17 per EACH
₱ 488.34 per L.M.
₱ 1,605.50 per EACH
₱ 535.17 per EACH
₱ 234.14 per L.M.
₱ -
₱ -
₱ 45.15 per L.M.
₱ 13.38 per L.M.
₱ 53.52 per S.M.
₱ 70.24 per S.M.
₱ 23.41 per S.M.
₱ 20.90 per L.M.
₱ 11.71 per S.M.
₱ 66.90 per CU.M.
₱ 14.22 per S.M.
₱ 2.51 per L.M.
₱ 5.02 per L.M.
₱ 20.07 per KG
₱ 76.09 per CU.M.
MANHOUR
EQUIVALENT RATE
(Drop-Down List)
CHOOSE RATE : NCR
Total Daily Rate Hourly Pay
Position Quantity Rate
Foreman 1 ₱ 926.25 ₱ 926.25 ₱ 115.78
Skilled 3 ₱ 748.13 ₱ 2,244.38 ₱ 280.55
Labor 5 ₱ 570.00 ₱ 2,850.00 ₱ 356.25
Total Rate per Manhour = ₱ 83.62

NOTE :
You can change the quantities of the manpower per position and their
respective rates in the Table.
Table of Rates
Position
Area Foreman Skilled Labor
NCR 926.25 748.13 570.00
CAR 650.00 525.00 400.00 1.3125
Region 1 650.00 525.00 400.00 1.63
Region 2 650.00 525.00 400.00
Region 3 747.50 603.75 460.00
Region 4A 763.75 616.88 470.00
Region 4B 576.88 465.94 355.00
Region 5 593.13 479.06 365.00
Region 6 731.25 590.63 450.00
Region 7 706.88 570.94 435.00
Region 8 609.38 492.19 375.00
Region 9 570.38 460.69 351.00
Region 10 658.13 531.56 405.00
Region 11 719.88 581.44 443.00
Region 12 598.00 483.00 368.00
Region 13 568.75 459.38 350.00
BARMM 554.13 447.56 341.00
ACTIVITIES INPUT HERE

ITEM NO. WORK DESCRIPTION


QUANTITY UNIT
LOW AVERAG
A. TRADE: UNDERGROUND PIPING AND PLUMBING WORKS -
1.00 LAYING ASBESTOS PIPES: -
1//2Ø L.M.
3/4" Ø L.M.
1 1/4" L.M.
1 1/2 TO 2" Ø L.M.
2 1/2" Ø L.M.
3" Ø L.M.
3 1/2" Ø L.M.
4" Ø L.M.
2.00 CAST IRON PIPE -
2" Ø L.M.
4" Ø L.M.
6" Ø L.M.
8" Ø L.M.
10" Ø L.M.
12" Ø L.M.
14" Ø L.M.
16" Ø L.M.
18" Ø L.M.
20" Ø L.M.
24" Ø L.M.
30" Ø L.M.
3.00 LAYING PVC PIPE -
1/2 TO 3/4" Ø L.M.
1 TO 1 1/4" Ø L.M.
1 1/2 TO 2" Ø L.M.
2 1/2" Ø L.M.
3" Ø L.M.
4" Ø L.M.
5" Ø L.M.
6" Ø L.M.
4.00 LAYING RCP 8 MEN (1 TEAM) -
24"Ø L.M.
36"Ø L.M.
48"Ø L.M.
6-18"Ø L.M.
-
LAYING OF 24"Ø RCP PIPE
LAYING OF 36"Ø RCP PIPE
LAYING OF 48"Ø RCP PIPE
-
B. TRADE INSULATION -
EQUIPMENT INSTALLATION -
VESSEL, EXCHANGE & TANKS -
FIELD FABRICATION INSULATION S.M.
FIELD FABRICATION SHEET METAL COVER S.M.
APPLY INSULATION S.M.
APPLY SHEET METAL COVER S.M.
PUMPS, COMPRESSORS & TURBINES -
FABRICATE S.M.
APPLY S.M.
PIPINGS AND COMPONENT INSULATION -
FIELD FABRICATE FLG.
FIELD FABRICATESHEET METAL COVER S.M.
APPLY INSULATION L.M.
APPLY SHEET METAL COVER OR METAL COVER EACH
FABRICATE INSTRUMENT COVER EACH
INSTALL INSTRUMENT COVER EACH
INSULATE PIPE HANGERS EACH
FOR STREAM TRACED LINES L.M.
REMOVAL OF OLD OR EXISTING INSTALLATION L.M.
-
C. TRADE:FIRE PROOFING -
INSTALL STUDS EACH
INSTALL MESH S.M.
POURED -
FORMING S.M.
STRIP FORMS S.M.
POUR CONCRETE S.M.
CURING/PATCHING S.M.
FINISHING S.M.
TROWEL, PLASTERED S.M.
PNEUMATIC APPLICATION -
GUNITE S.M.
APPLY FINEBRICK OR BLOCK PC.
REMOVAL OF EXISTING OR OLD FIREPROOFING S.M.
APPLY FIREPROOFING PAINT S.M.
FIRE PROTERCTION: -
FIRE PROTECTION EQUIPMENT INSTALLATION: -
MONITOR EACH
HOSE REELS AND CARTS EACH
FIRE EXTINGUISHERS EACH
PERSONAL EQUIPMENT: -
EYE WASH EACH
SAFETY SHOWERS EACH
BREATHING APPARATUS EACH
SPRINKLER SYSTEM -
SPRAY NOZZLES EACH
WATER CANNONS EACH

D. TRADE:HEATING VENTILATING AND CONDITIONING -


HEAVY PIPING L.M.
DUCT WORK INSTALL S.M.
DUCT WORK FAB. S.M.
PACKAGE UNIT AIR CONDITIONER EACH
UNIT HEATER EACH
FINNED CONVERTER EACH
EXHAUST FAN PROPELLER EACH
GRAVITY ROOF PAINT L.M.
POWER ROOF VENT EACH
ROUND ROOF VENT EACH
PLUMBING PIPING L.M.
-
E. MISCELLANEOUS -
WATER STOP INSTALLATION L.M.
CAULKING SLAB JOINT L.M.
ASPHALTING S.M.
GROUTNG AND TOOL PLASTERING S.M.
WATER PROOFING RUBBERIZED S.M.
COPPER CLADDING ROOF DECK L.M.
WATER PROOFING FLINKOTE S.M.
DEMOLITION OF ADOBE WALL CU.M.
PAINTING S.M.
COPPER WATER STOP CUT AND SHAPE L.M.
COPPER WATER STOP CUT AND INSTALLATION L.M.
SETTING ANCHOR BOLT KG
SETTING ANCHOR BOXES CU.M.
TOTAL LABOR COST
choose labor productivity
rate BELOW

LABOR PRODUCTIVITY
HIGH
RATE PER UNIT TOTAL COST
HIGH
₱ - ₱ -
₱ - ₱ -
₱ 44.32 ₱ -
₱ 44.32 ₱ -
₱ 49.34 ₱ -
₱ 55.19 ₱ -
₱ 58.53 ₱ -
₱ 71.91 ₱ -
₱ 76.93 ₱ -
₱ 88.64 ₱ -
₱ - ₱ -
₱ 146.33 ₱ -
₱ 219.92 ₱ -
₱ 329.46 ₱ -
₱ 439.84 ₱ -
₱ 667.29 ₱ -
₱ 689.86 ₱ -
₱ 806.09 ₱ -
₱ 915.64 ₱ -
₱ 1,026.01 ₱ -
₱ 1,098.76 ₱ -
₱ 1,209.14 ₱ -
₱ 1,373.87 ₱ -
₱ - ₱ -
₱ 12.54 ₱ -
₱ 49.34 ₱ -
₱ 55.19 ₱ -
₱ 65.22 ₱ -
₱ 71.91 ₱ -
₱ 87.80 ₱ -
₱ 109.54 ₱ -
₱ 164.73 ₱ -
₱ - ₱ -
₱ 267.58 ₱ -
₱ 428.13 ₱ -
₱ 714.11 ₱ -
₱ 88.64 ₱ -
₱ - ₱ -
₱ 267.58 ₱ -
₱ 428.13 ₱ -
₱ 713.28 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 167.24 ₱ -
₱ 802.75 ₱ -
₱ 334.48 ₱ -
₱ 334.48 ₱ -
₱ - ₱ -
₱ 1,137.23 ₱ -
₱ 2,006.88 ₱ -
₱ - ₱ -
₱ 267.58 ₱ -
₱ 53.52 ₱ -
₱ 180.62 ₱ -
₱ 100.34 ₱ -
₱ 535.17 ₱ -
₱ 401.38 ₱ -
₱ 267.58 ₱ -
₱ 247.51 ₱ -
₱ 100.34 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 33.45 ₱ -
₱ 80.28 ₱ -
₱ - ₱ -
₱ 936.54 ₱ -
₱ 401.38 ₱ -
₱ 4,682.71 ₱ -
₱ 40.14 ₱ -
₱ 46.83 ₱ -
₱ 180.62 ₱ -
₱ - ₱ -
₱ 80.28 ₱ -
₱ 53.52 ₱ -
₱ 167.24 ₱ -
₱ 200.69 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 334.48 ₱ -
₱ 1,003.44 ₱ -
₱ 334.48 ₱ -
₱ - ₱ -
₱ 668.96 ₱ -
₱ 668.96 ₱ -
₱ 334.48 ₱ -
₱ - ₱ -
₱ 6,689.58 ₱ -
₱ 334.48 ₱ -

₱ - ₱ -
₱ 234.14 ₱ -
₱ 401.38 ₱ -
₱ 1,204.13 ₱ -
₱ 1,605.50 ₱ -
₱ 802.75 ₱ -
₱ 334.48 ₱ -
₱ 535.17 ₱ -
₱ 488.34 ₱ -
₱ 1,605.50 ₱ -
₱ 535.17 ₱ -
₱ 234.14 ₱ -
₱ - ₱ -
₱ - ₱ -
₱ 45.15 ₱ -
₱ 13.38 ₱ -
₱ 53.52 ₱ -
₱ 70.24 ₱ -
₱ 23.41 ₱ -
₱ 20.90 ₱ -
₱ 11.71 ₱ -
₱ 66.90 ₱ -
₱ 14.22 ₱ -
₱ 2.51 ₱ -
₱ 5.02 ₱ -
₱ 20.07 ₱ -
₱ 76.09 ₱ -
TOTAL LABOR COST =
₱ -
PROBABLE OUTPUT OF HEAVY EQUIPMENT

EQUIPMENT PROBABLE OUTPUT

A.1 DOZER 165 HP


Cutting & Stockpiling 30.00 cu.m./hr. 0.033 hr/m³
Clearing & Grubbing 300.00 sq.m./hr 0.003 hr/m²
A.2 DOZER D65P-7
Stripping 200.00 sq.m./hr 0.005 hr/m²
Excavation 25.00 cu.m./hr. 0.040 hr/m³
Quarrying 50.00 cu.m./hr. 0.020 hr/m³
Pushing 3.00 sq.m./hr 0.333 hr/m²

B.1 LOADER -1.91 CU.M.


Loading 70.00 cu.m./hr. 0.014 hr/m³
B.2 LOADER 950

C. DUMP TRUCK - 10 CU.M.


Hauling (dist. = 600M) 90.00 cu.m./hr. 0.011 hr/m³

D. GRADER- 130G
10 Passes 700.00 sq.m./hr 0.001 hr/m²
Subgrading 300.00 sq.m./hr 0.003 hr/m²
Spreading 40.00 cu.m./hr. 0.025 hr/m³

E.1 ROLLER VIBRATORY


10 Passes 600.00 sq.m./hr 0.002 hr/m²
SHEETS FOOT ROLLER
Static Rolling 12 passes-15m3 lift
Vibratory Rolling-4 pases-15m3 lift 135.00 cu.m./hr. 0.007 hr/m³
No.3W Road Roller-static rolling
4 passes-15 m3 lift 24.00 cu.m./hr. 0.042 hr/m³
Tractor Drawn Roller (1-d)
Static Rolling 6 passes-20m3 lift 240.00 cu.m./hr. 0.004 hr/m³
Tandem Roller-static rolling
6 passes-20 m3 lift 24.00 cu.m./hr. 0.042 hr/m³

E.2 VIBRATORY COMPACTOR CA25D

G. WATER TRUCK - 10 CU.M.


Watering 1,600.00 sq.m./hr 0.001 hr/m²

ASPHALT PAVER
ASPHALT DISTRIBUTOR SPRAYING PHALT
PLATE COMPACTOR
Grave Bedding 8.00 cu.m./hr. 0.125 hr/m³
Concrete Vibrator:
Vibrating Concrete 40.00 cu.m./hr. 0.025 hr/m³
Clearing & Grubbing Lot Grading (Cut & Fill) m3 Trench Excavation

300 30 m3/hr

232.55 m3/hr

232.55 m3/hr

384.62 m3/hr

303.03 m3/hr

769.23 m3/hr
Disposal of Unsuitable Materials m3-km Road way Excavation (m3)

29.41 m3/hr

125.00 m3/hr

125.00 m3/hr
Embankment/Imported Backfill (m3) Subgrade Preparation (m2)

142.86 m3/hr 769.23 sq.m./hr

125.00 m3/hr 588.23 sq.m./hr

333.33 m3/hr 1,666.67 sq.m./hr


Aggregate Sub-base Course (m3) Aggregate Base Course (m3)

76.92 m3/hr 115.38 m3/hr

58.82 m3/hr 88.23 m3/hr

166.67 m3/hr 250.00 m3/hr


Bituminous Asphalt Pavement (MT) Concrete Pavement (m3)

65.00 MT/hr

32.50 MT/hr
300 SQ.M.