Professional Documents
Culture Documents
Presentation of Equipment Pouilley Les Vignes School Group
Presentation of Equipment Pouilley Les Vignes School Group
school group
Contents
ENERGY SUPPLY
Primary gas
network...............................................................
Connection.........................................................................
Heat production............................................................
Gas boiler...............................................................................
HEATING EQUIPMENT................................................................
Underfloor heating.............................................................................
Power 140Kw
Condensation for heating and hot water
Flue gas discharge from the boiler will be through a vertical vent
HEATING EQUIPMENT
The entire project will be heated by low temperature hot water underfloor
heating.
The building's general drinking water supply will be provided from the general
cold water supply left on standby by the civil engineering works package in the
cleaning room. From this cold water inlet, a set of connections will be set up.