Presentation of equipment Pouilley les Vignes

school group

Contents

ENERGY SUPPLY
Primary gas
network...............................................................
Connection.........................................................................

Heat production............................................................
Gas boiler...............................................................................

HEATING EQUIPMENT................................................................
Underfloor heating.............................................................................

DRINKING WATER SUPPLY............................................................


Connection set.................................................................

DOMESTIC HOT WATER PRODUCTION...........................................


Collective DHW cylinder...................................................................

DOUBLE FLOW VENTILATION PRIMARY ZONE/RESTAURANT..........


Air handling unit................................................................
Heat production

Modulating floor standing gas condensing boiler composed internally of two


independent boilers ensuring the production of domestic hot water and
condensing heating.

Power 140Kw
Condensation for heating and hot water
Flue gas discharge from the boiler will be through a vertical vent

HEATING EQUIPMENT

The entire project will be heated by low temperature hot water underfloor
heating.

DRINKING WATER SUPPLY

The building's general drinking water supply will be provided from the general
cold water supply left on standby by the civil engineering works package in the
cleaning room. From this cold water inlet, a set of connections will be set up.