PROJECT: SOLAR POWER PLANT

Scope Statement: The project aims to design, procure, construct, and commission
a 1MW solar power plant in Mainwali. The project will include installation of solar
panels, inverters, transformers, switchgear, and other equipment required for the
functioning of the power plant.

Objective: The objective of the project is to provide renewable energy to the local
community and reduce carbon emissions in Pakistan. The solar power plant will
generate electricity that can be supplied to the national grid or used to power
local businesses and homes.

Cost: 50million

Time: 1year

Brief summary:

 Since a 1kW solar system generates = 4 units/day


Accordingly, 1MW will generate,
 4 units x 1000kW = 4,000 units/day (1MW = 1000kW), & 4,000 units x 30
days = 1,20,000 units/month.
 1,20,000 units x 12 months = 14,40,000 units/year.

1MW capacity or more can be considered as a “Ground Mounted Solar Power


Plant

On-Grid Solar System – Saving + Grid Export

CAPEX Model: pay the complete system’s cost to the solar system
installation company in one shot ,will be get benefited from free electricity for
the next 25+ years

In this solar system, solar panels will generate the DC electricity by absorbing
sunlight and the solar inverter will convert the same DC electricity into AC
electricity which can then be used directly at home or business. Expected
reduction of 517 tones in the annual carbon-emissions.