APPENDIX 9- ABSTRACT OF PROPOSED DISTRIBUTION

PIPELINE
BREAKUP OF PIPELINE LENGTH (M)
Existing UPVC to be Replaced 20203
Existing GI to be Replaced 85
Proposed New DI Pipeline 37173
Existing DI to be retained 30147
Existing CI to be Replaced 10918
Existing DI to be Replaced 1437
Existing MS to be Replaced 773
TOTAL LENGTH (M) 100736

ABSTRACT OF DISTRIBUTION PIPELINE


DESCRIPTION LENGTH (M)
Existing to be Replaced 33416
Proposed New DI Pipeline 37173
Existing DI to be retained 30147
TOTAL LENGTH (M) 100736
HYDRAULIC MODEL INVENTORY (Pipe) OF DMA-1 (Rairangpur)

Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic


ID Label Start Node Elevation Stop Elevation Diameter Material Velocity Flow Headloss Remarks
(Scaled) Williams Gradient (Start) (m (Stop) (m Grade Grade
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

120 P-229 J-61 265.5 J-62 265.4 5 150 DI 130 0.72 1.094 4.094 0.02 26 26 291.6 291.5 Existing DI to be retained
2073 P-932 R-1 (ZONE-1) 275 J-61 265.5 838 150 DI 130 0.72 1.094 4.095 3.43 0 26 295 291.6 Existing DI to be retained
1739 P-800 J-62 265.4 J-807 265.1 109 150 DI 130 0.71 1.082 4.008 0.44 26 26 291.5 291.1 Existing DI to be retained
1472 P-687 J-807 265.1 J-94 265.9 72 150 DI 130 0.7 1.072 3.945 0.29 26 25 291.1 290.8 Existing DI to be retained
530 P-343 J-94 265.9 J-161 265.3 28 150 DI 130 0.51 0.786 2.218 0.06 25 25 290.8 290.8 Existing DI to be retained
1768 P-816 J-161 265.3 J-7 265 127 100 DI 140 1.01 0.688 10.899 1.39 25 24 290.8 289.4 Existing DI to be Replaced
39 P-216 J-7 265 J-8 265 1 100 DI 140 0.98 0.667 10.289 0.01 24 24 289.4 289.4 Existing DI to be Replaced
1691 P-137 J-628 259.5 J-249 258.2 98 100 DI 140 0.6 0.407 4.115 0.4 28 29 288 287.6 Existing UPVC to be Replaced
412 P-27 J-249 258.2 J-250 258 21 100 DI 140 0.59 0.4 3.994 0.09 29 29 287.6 287.5 Existing UPVC to be Replaced
578 P-41 J-250 258 J-347 258 29 100 DI 140 0.54 0.367 3.397 0.1 29 29 287.5 287.4 Existing UPVC to be Replaced
1855 P-162 J-347 258 J-953 256.7 142 100 DI 140 0.54 0.364 3.349 0.47 29 30 287.4 286.9 Existing UPVC to be Replaced
1785 P-825 J-8 265 J-305 264.7 119 100 DI 130 0.51 0.346 3.497 0.42 24 24 289.4 289 Existing DI to be retained
505 P-335 J-305 264.7 J-306 264.4 26 100 DI 130 0.47 0.321 3.045 0.08 24 24 289 288.9 Existing DI to be retained
824 P-445 J-306 264.4 J-487 263.9 39 100 DI 130 0.46 0.315 2.932 0.12 24 25 288.9 288.8 Existing DI to be retained
2004 P-906 J-8 265 J-119 262.5 306 100 DI 130 0.46 0.314 2.917 0.89 24 26 289.4 288.5 Existing DI to be retained
2077 P-1057 J-162 265.2 J-641 256.2 1,150 100 DI 140 0.46 0.309 2.48 2.85 25 32 290.8 287.9 Existing CI to be Replaced
209 P-15 J-119 262.5 J-120 262.4 10 100 DI 140 0.46 0.309 2.474 0.02 26 26 288.5 288.5 Existing UPVC to be Replaced
1103 P-73 J-487 263.9 J-130 263.3 50 100 DI 140 0.46 0.309 2.474 0.12 25 25 288.8 288.6 Existing UPVC to be Replaced
926 P-60 J-120 262.4 J-381 261.9 43 100 DI 140 0.45 0.303 2.379 0.1 26 26 288.5 288.3 Existing UPVC to be Replaced
226 P-16 J-130 263.3 J-131 263.1 11 100 DI 140 0.44 0.302 2.365 0.03 25 25 288.6 288.6 Existing UPVC to be Replaced
908 P-57 J-131 263.1 J-535 262.7 42 100 DI 140 0.43 0.293 2.246 0.09 25 26 288.6 288.5 Existing UPVC to be Replaced
1919 P-180 J-381 261.9 J-628 259.5 172 100 DI 140 0.42 0.287 2.155 0.37 26 28 288.3 288 Existing UPVC to be Replaced
934 P-61 J-535 262.7 J-35 261.6 43 100 DI 140 0.42 0.285 2.129 0.09 26 27 288.5 288.4 Existing UPVC to be Replaced
81 P-7 J-35 261.6 J-36 261.6 3 100 DI 140 0.4 0.269 1.913 0.01 27 27 288.4 288.4 Existing UPVC to be Replaced
1654 P-133 J-36 261.6 J-319 260.2 92 100 DI 140 0.36 0.242 1.579 0.15 27 28 288.4 288.3 Existing UPVC to be Replaced
1914 P-178 J-412 252 J-215 252 163 100 DI 140 0.34 0.233 1.461 0.24 34 34 286.3 286.1 Existing UPVC to be Replaced
531 P-36 J-319 260.2 J-259 260.1 28 100 DI 140 0.34 0.231 1.447 0.04 28 28 288.3 288.2 Existing UPVC to be Replaced
428 P-30 J-259 260.1 J-5 259.2 22 100 DI 140 0.33 0.227 1.394 0.03 28 29 288.2 288.2 Existing UPVC to be Replaced
666 P-389 J-93 265.7 J-162 265.2 33 100 DI 130 0.31 0.212 1.41 0.05 25 25 290.8 290.8 Existing DI to be retained
2092 P-1064 J-641 256.2 J-688 255.3 62 100 DI 140 0.31 0.211 1.223 0.08 32 32 287.9 287.8 Existing CI to be Replaced
360 P-25 J-215 252 J-216 252 18 100 DI 140 0.31 0.21 1.206 0.02 34 34 286.1 286.1 Existing UPVC to be Replaced
2093 P-1065 J-688 255.3 J-755 255.3 2 100 DI 140 0.31 0.208 1.192 0 32 33 287.8 287.8 Existing CI to be Replaced
2090 P-1062 J-755 255.3 J-462 251.9 482 100 DI 140 0.3 0.202 1.124 0.54 33 35 287.8 287.3 Existing CI to be Replaced
780 P-430 J-462 251.9 J-245 251 37 100 DI 130 0.3 0.201 1.278 0.05 35 36 287.3 287.2 Existing DI to be retained
1118 P-74 J-216 252 J-644 251.6 51 100 DI 140 0.28 0.189 0.998 0.05 34 34 286.1 286 Existing UPVC to be Replaced
1490 P-695 J-245 251 J-85 250.9 73 100 DI 130 0.27 0.183 1.078 0.08 36 36 287.2 287.2 Existing DI to be retained
1708 P-140 J-644 251.6 J-847 252 102 100 DI 140 0.24 0.162 0.752 0.08 34 34 286 286 Existing UPVC to be Replaced
2051 P-197 J-953 256.7 J-3 251.7 459 100 DI 140 0.21 0.143 0.597 0.27 30 35 286.9 286.6 Existing UPVC to be Replaced
2052 P-198 J-953 256.7 J-4 251.7 459 100 DI 140 0.21 0.143 0.596 0.27 30 35 286.9 286.6 Existing UPVC to be Replaced
158 P-238 J-85 250.9 J-86 250.9 7 100 DI 130 0.2 0.134 0.607 0 36 36 287.2 287.2 Existing DI to be retained
1606 P-127 J-847 252 J-571 252 86 100 DI 140 0.16 0.11 0.364 0.03 34 34 286 285.9 Existing UPVC to be Replaced
275 P-269 J-161 265.3 J-162 265.2 13 100 DI 130 0.14 0.098 0.336 0 25 25 290.8 290.8 Existing DI to be retained
559 P-352 J-336 249.6 J-337 249.6 29 100 DI 130 0.14 0.096 0.328 0.01 37 37 287.1 287.1 Existing DI to be retained
1927 P-181 J-337 249.6 J-955 249 198 100 DI 140 0.12 0.081 0.206 0.04 37 38 287.1 287.1 Existing UPVC to be Replaced
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

499 P-332 J-86 250.9 J-302 250.7 26 100 DI 130 0.12 0.08 0.233 0.01 36 36 287.2 287.2 Existing DI to be retained
976 P-63 J-571 252 J-57 252 45 100 DI 140 0.12 0.08 0.204 0.01 34 34 285.9 285.9 Existing UPVC to be Replaced
1866 P-856 J-955 249 J-522 248.5 142 100 DI 140 0.11 0.077 0.189 0.03 38 38 287.1 287.1 Proposed New DI Pipeline
1679 P-781 J-302 250.7 J-336 249.6 97 100 DI 130 0.08 0.052 0.103 0.01 36 37 287.2 287.1 Existing DI to be retained
114 P-9 J-57 252 J-58 251.9 5 100 DI 140 0.08 0.051 0.089 0 34 34 285.9 285.9 Existing UPVC to be Replaced
1774 P-820 J-86 250.9 J-336 249.6 195 100 DI 140 0.07 0.049 0.082 0.02 36 37 287.2 287.1 Proposed New DI Pipeline
1214 P-586 J-522 248.5 J-690 248.4 57 100 DI 140 0.05 0.037 0.049 0 38 39 287.1 287.1 Proposed New DI Pipeline
1075 P-531 J-625 251.3 J-324 251.8 49 100 DI 140 0.05 0.037 0.048 0 35 34 286.3 286.3 Proposed New DI Pipeline
1468 P-111 J-58 251.9 J-615 252 72 100 DI 140 0.05 0.037 0.048 0 34 34 285.9 285.9 Existing UPVC to be Replaced
886 P-471 J-522 248.5 J-523 248.2 42 100 DI 140 0.05 0.036 0.046 0 38 39 287.1 287.1 Proposed New DI Pipeline
1270 P-605 J-85 250.9 J-403 251.3 59 100 DI 130 0.05 0.033 0.046 0 36 36 287.2 287.2 Existing DI to be retained
972 P-498 J-559 264.8 J-569 264.2 46 100 DI 140 0.05 0.032 0.038 0 26 26 290.8 290.8 Proposed New DI Pipeline
1957 P-886 J-523 248.2 J-873 249.6 281 100 DI 140 0.05 0.031 0.036 0.01 39 37 287.1 287.1 Proposed New DI Pipeline
677 P-393 J-403 251.3 J-404 251.3 33 100 DI 130 0.04 0.028 0.033 0 36 36 287.2 287.2 Existing DI to be retained
1055 P-523 J-615 252 J-616 252 47 100 DI 130 0.04 0.028 0.032 0 34 34 285.9 285.9 Existing DI to be retained
1643 P-767 J-873 249.6 J-513 250.9 118 100 DI 140 0.03 0.022 0.019 0 37 36 287.1 287 Proposed New DI Pipeline
1519 P-708 J-324 251.8 J-826 251.5 91 100 DI 140 0.03 0.022 0.018 0 34 35 286.3 286.3 Proposed New DI Pipeline
1996 P-902 J-690 248.4 J-989 250.9 273 100 DI 140 0.03 0.022 0.018 0 39 36 287.1 287.1 Proposed New DI Pipeline
2027 P-917 J-995 252 J-996 251.1 346 100 DI 130 0.03 0.02 0.017 0.01 34 35 285.9 285.9 Existing DI to be retained
1238 P-593 J-569 264.2 J-702 263.7 68 100 DI 140 0.03 0.019 0.015 0 26 27 290.8 290.8 Proposed New DI Pipeline
1729 P-144 J-36 261.6 J-258 261.7 105 100 DI 140 0.03 0.018 0.014 0 27 27 288.4 288.4 Existing UPVC to be Replaced
784 P-432 J-215 252 J-357 251.8 37 100 DI 140 0.02 0.016 0.011 0 34 34 286.1 286.1 Proposed New DI Pipeline
2265 P-215 J-996 251.1 J-96 251 1 100 DI 140 0.02 0.016 0.015 0 35 35 285.9 285.9 Proposed New DI Pipeline
1640 P-765 J-7 265 J-872 263.7 90 100 DI 130 0.02 0.016 0.011 0 24 26 289.4 289.4 Existing DI to be retained
1624 P-130 J-317 250.7 J-341 249 88 100 DI 140 0.02 0.014 0.008 0 37 39 287.9 287.9 Existing UPVC to be Replaced
1492 P-112 J-305 264.7 J-605 263.6 73 100 DI 140 0.02 0.014 0.008 0 24 25 289 289 Existing UPVC to be Replaced
1871 P-166 J-957 259.5 J-958 258 146 100 DI 140 0.02 0.014 0.008 0 28 30 288 288 Existing UPVC to be Replaced
1694 P-785 J-404 251.3 J-895 251.2 99 100 DI 140 0.02 0.014 0.008 0 36 36 287.2 287.2 Proposed New DI Pipeline
595 P-363 J-357 251.8 J-183 250.7 41 100 DI 140 0.02 0.013 0.007 0 34 35 286.1 286.1 Proposed New DI Pipeline
1970 P-188 J-96 251 J-977 249.9 263 100 DI 140 0.02 0.013 0.007 0 35 36 285.9 285.9 Existing UPVC to be Replaced
1233 P-591 J-352 259 J-700 259.3 80 100 DI 140 0.02 0.012 0.006 0 29 29 288 288 Proposed New DI Pipeline
2045 P-921 J-872 263.7 J-147 268 477 100 DI 130 0.02 0.012 0.007 0 26 21 289.4 289.4 Existing DI to be retained
1942 P-880 J-977 249.9 J-941 253.4 191 100 DI 130 0.01 0.01 0.005 0 36 32 285.9 285.9 Existing DI to be retained
406 P-306 J-245 251 J-246 250.9 20 100 DI 140 0.01 0.008 0.003 0 36 36 287.2 287.2 Proposed New DI Pipeline
1599 P-746 J-807 265.1 J-860 264.7 98 100 DI 140 0.01 0.008 0.003 0 26 26 291.1 291.1 Proposed New DI Pipeline
690 P-396 J-379 260.4 J-411 258.9 34 100 DI 140 0.01 0.007 0.002 0 28 29 288.1 288.1 Proposed New DI Pipeline
1962 P-889 J-616 252 J-95 251.1 214 100 DI 130 0.01 0.007 0.003 0 34 35 285.9 285.9 Existing DI to be retained
947 P-487 J-202 258.9 J-556 258.4 44 100 DI 140 0.01 0.006 0.002 0 29 29 288 288 Proposed New DI Pipeline
1159 P-564 J-319 260.2 J-275 259.5 54 100 DI 140 0.01 0.006 0.002 0 28 29 288.3 288.3 Proposed New DI Pipeline
1921 P-871 J-523 248.2 J-971 248.5 182 100 DI 140 0.01 0.005 0.001 0 39 38 287.1 287.1 Proposed New DI Pipeline
1758 P-809 J-513 250.9 J-919 250.8 152 100 DI 140 0.01 0.005 0.001 0 36 36 287 287 Proposed New DI Pipeline
1982 P-896 J-96 251 J-986 250.6 243 100 DI 140 0.01 0.005 0.001 0 35 35 285.9 285.9 Proposed New DI Pipeline
996 P-503 J-569 264.2 J-582 264.8 50 100 DI 140 0.01 0.005 0.001 0 26 26 290.8 290.8 Proposed New DI Pipeline
1959 P-888 J-616 252 J-982 251 210 100 DI 140 0.01 0.005 0.001 0 34 35 285.9 285.9 Proposed New DI Pipeline
1579 P-738 J-605 263.6 J-852 262.3 101 100 DI 140 0.01 0.004 0.001 0 25 27 289 289 Proposed New DI Pipeline
252 P-264 J-147 268 J-148 268 12 100 DI 140 0.01 0.004 0 0 21 21 289.4 289.4 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

582 P-359 J-306 264.4 J-349 264.1 29 100 DI 140 0.01 0.004 0.001 0 24 25 288.9 288.9 Proposed New DI Pipeline
762 P-423 J-394 260 J-452 259.5 46 100 DI 140 0.01 0.004 0 0 28 29 288 288 Proposed New DI Pipeline
1257 P-601 J-535 262.7 J-711 263.7 66 100 DI 140 0.01 0.004 0.001 0 26 25 288.5 288.5 Proposed New DI Pipeline
1531 P-715 J-58 251.9 J-830 249.4 77 100 DI 140 0.01 0.004 0.001 0 34 36 285.9 285.9 Proposed New DI Pipeline
899 P-475 J-530 253.8 J-531 253.4 42 100 DI 140 0 0.003 0 0 34 34 287.9 287.9 Proposed New DI Pipeline
1026 P-513 J-599 252 J-600 251.3 47 100 DI 140 0 0.003 0 0 35 36 287.2 287.2 Proposed New DI Pipeline
1727 P-797 J-347 258 J-908 256.4 132 100 DI 140 0 0.003 0 0 29 31 287.4 287.4 Proposed New DI Pipeline
1761 P-811 J-872 263.7 J-920 262.2 122 100 DI 140 0 0.003 0 0 26 27 289.4 289.4 Proposed New DI Pipeline
309 P-278 J-183 250.7 J-184 250.5 16 100 DI 140 0 0.003 0.001 0 35 36 286.1 286.1 Proposed New DI Pipeline
1692 P-138 J-258 261.7 J-894 259.6 98 100 DI 140 0 0.003 0 0 27 29 288.4 288.4 Existing UPVC to be Replaced
1827 P-841 J-941 253.4 J-942 255.8 131 100 DI 130 0 0.003 0 0 32 30 285.9 285.9 Existing DI to be retained
173 P-14 J-95 251.1 J-96 251 8 100 DI 140 0 0.003 0.002 0 35 35 285.9 285.9 Existing UPVC to be Replaced
970 P-497 J-317 250.7 J-568 251.7 46 100 DI 140 0 0.002 0 0 37 36 287.9 287.9 Proposed New DI Pipeline
486 P-326 J-262 260.2 J-295 259.2 25 100 DI 140 0 0.002 0 0 28 29 288.1 288.1 Proposed New DI Pipeline
846 P-454 J-261 260 J-500 259 40 100 DI 140 0 0.002 0 0 28 29 288.1 288.1 Proposed New DI Pipeline
1211 P-585 J-688 255.3 J-689 255.3 65 100 DI 140 0 0.002 0 0 32 33 287.8 287.8 Proposed New DI Pipeline
1505 P-703 J-120 262.4 J-819 262.6 75 100 DI 140 0 0.002 0 0 26 26 288.5 288.5 Proposed New DI Pipeline
1568 P-734 J-130 263.3 J-846 264 81 100 DI 140 0 0.002 0 0 25 25 288.6 288.6 Proposed New DI Pipeline
1036 P-517 J-605 263.6 J-606 263.8 47 100 DI 140 0 0.001 0 0 25 25 289 289 Proposed New DI Pipeline
1687 P-783 J-873 249.6 J-892 250 96 100 DI 140 0 0.001 0 0 37 37 287.1 287.1 Proposed New DI Pipeline
36 P-2 J-5 259.2 J-6 259.2 1 100 DI 140 0 0 0 0 29 29 288.2 288.2 Existing UPVC to be Replaced
538 P-346 J-323 251.8 J-324 251.8 28 100 DI 140 0 0 0 0 34 34 286.3 286.3 Proposed New DI Pipeline
2263 P-977 J-991 251 J-995 252 322 100 DI 140 0 0 0 0 35 34 285.9 285.9 Proposed New DI Pipeline
2049 P-924 J-941 253.4 J-1002 255.4 466 100 DI 130 0 0 0 0 32 30 285.9 285.9 Existing DI to be retained
454 P-317 J-275 259.5 J-276 259.4 23 100 DI 140 0 0 0 0 29 29 288.3 288.3 Proposed New DI Pipeline
2078 P-201 J-1012 270 J-953 256.7 1,011 100 DI 140 0 0 0 0 17 30 286.9 286.9 Existing UPVC to be Replaced
2164 P-966 J-1024 251.4 J-62 265.4 1,578 100 DI 130 0 0 0 0 40 26 291.5 291.5 Existing DI to be retained
1820 P-838 J-937 251.9 J-938 251.3 127 100 DI 140 0 0 0 0 35 36 287.3 287.3 Proposed New DI Pipeline
1244 P-596 J-704 255 J-594 254.3 57 100 DI 140 0 0 0 0 33 33 287.9 287.9 Proposed New DI Pipeline
2167 P-967 J-1025 251.4 J-625 251.3 31 100 DI 130 0 0 0 0 35 35 286.3 286.3 Existing DI to be retained
2091 P-1063 J-462 251.9 J-937 251.9 3 100 DI 140 0 0 0 0 35 35 287.3 287.3 Existing CI to be Replaced
1188 P-576 J-677 251.3 J-357 251.8 66 100 DI 140 0 -0.002 0 0 35 34 286.1 286.1 Proposed New DI Pipeline
959 P-492 J-562 258 J-249 258.2 45 100 DI 140 0 -0.002 0 0 30 29 287.6 287.6 Proposed New DI Pipeline
1088 P-537 J-631 250.9 J-28 251.9 67 100 DI 140 0 -0.002 0 0 35 34 286 286 Proposed New DI Pipeline
1093 P-540 J-633 260.7 J-200 261.5 73 100 DI 140 0 -0.002 0 0 28 27 288.3 288.3 Proposed New DI Pipeline
1280 P-610 J-721 258.6 J-275 259.5 90 100 DI 140 0 -0.002 0 0 30 29 288.3 288.3 Proposed New DI Pipeline
334 P-284 J-199 261.4 J-200 261.5 17 100 DI 140 0 -0.003 0 0 27 27 288.3 288.3 Proposed New DI Pipeline
488 P-327 J-296 261 J-259 260.1 25 100 DI 140 0.01 -0.004 0.001 0 27 28 288.2 288.2 Proposed New DI Pipeline
620 P-372 J-372 252 J-183 250.7 31 100 DI 140 0.01 -0.004 0.001 0 34 35 286.1 286.1 Proposed New DI Pipeline
1442 P-108 J-795 252 J-644 251.6 70 100 DI 140 0.01 -0.004 0.001 0 34 34 286 286 Existing UPVC to be Replaced
567 P-356 J-340 249.1 J-341 249 30 100 DI 140 0.01 -0.004 0.001 0 39 39 287.9 287.9 Proposed New DI Pipeline
727 P-409 J-432 263 J-131 263.1 35 100 DI 140 0.01 -0.004 0.001 0 26 25 288.6 288.6 Proposed New DI Pipeline
1563 P-731 J-844 249.8 J-644 251.6 80 100 DI 140 0.01 -0.004 0.001 0 36 34 286 286 Proposed New DI Pipeline
1709 P-791 J-901 262 J-902 262.7 131 100 DI 140 0.01 -0.004 0.001 0 26 26 288.4 288.4 Proposed New DI Pipeline
1557 P-728 J-842 248 J-27 251.9 79 100 DI 140 0.01 -0.004 0.001 0 38 34 286 286 Proposed New DI Pipeline
1105 P-545 J-638 250.6 J-571 252 50 100 DI 140 0.01 -0.005 0.001 0 35 34 285.9 285.9 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

69 P-221 J-27 251.9 J-28 251.9 3 100 DI 130 0.01 -0.005 0 0 34 34 286 286 Existing DI to be retained
868 P-464 J-512 251 J-513 250.9 41 100 DI 140 0.01 -0.005 0.001 0 36 36 287 287 Proposed New DI Pipeline
1205 P-582 J-685 250.8 J-163 251 58 100 DI 140 0.01 -0.005 0.002 0 37 37 287.9 287.9 Proposed New DI Pipeline
1724 P-143 J-902 262.7 J-232 262.5 122 100 DI 140 0.01 -0.006 0.001 0 26 26 288.4 288.4 Existing UPVC to be Replaced
1107 P-546 J-599 252 J-403 251.3 50 100 DI 140 0.01 -0.006 0.001 0 35 36 287.2 287.2 Proposed New DI Pipeline
1546 P-722 J-837 251.7 J-216 252 79 100 DI 140 0.01 -0.006 0.002 0 34 34 286.1 286.1 Proposed New DI Pipeline
1928 P-875 J-973 250 J-690 248.4 185 100 DI 140 0.01 -0.006 0.002 0 37 39 287.1 287.1 Proposed New DI Pipeline
470 P-321 J-285 263.3 J-141 263.3 24 100 DI 140 0.01 -0.007 0.002 0 27 27 290.8 290.8 Proposed New DI Pipeline
1178 P-571 J-672 253.3 J-594 254.3 78 100 DI 140 0.01 -0.007 0.002 0 35 33 287.9 287.9 Proposed New DI Pipeline
386 P-301 J-232 262.5 J-233 262.5 19 100 DI 130 0.01 -0.008 0.004 0 26 26 288.4 288.4 Existing DI to be retained
338 P-24 J-201 258.8 J-202 258.9 17 100 DI 140 0.01 -0.008 0.002 0 29 29 288 288 Existing UPVC to be Replaced
1875 P-167 J-959 264.1 J-140 263.4 151 100 DI 140 0.02 -0.012 0.006 0 27 27 290.8 290.8 Existing UPVC to be Replaced
1125 P-551 J-233 262.5 J-257 261.9 51 100 DI 130 0.02 -0.012 0.007 0 26 26 288.4 288.4 Existing DI to be retained
1851 P-161 J-951 261 J-35 261.6 136 100 DI 140 0.02 -0.012 0.006 0 27 27 288.4 288.4 Existing UPVC to be Replaced
425 P-29 J-257 261.9 J-258 261.7 23 100 DI 140 0.02 -0.013 0.006 0 26 27 288.4 288.4 Existing UPVC to be Replaced
636 P-378 J-200 261.5 J-381 261.9 31 100 DI 140 0.02 -0.013 0.007 0 27 26 288.3 288.3 Proposed New DI Pipeline
241 P-261 J-140 263.4 J-141 263.3 12 100 DI 130 0.03 -0.018 0.013 0 27 27 290.8 290.8 Existing DI to be retained
2262 P-214 J-957 259.5 J-1042 259.5 5 100 DI 140 0.03 -0.018 0.014 0 28 28 288 288 Proposed New DI Pipeline
1570 P-735 J-28 251.9 J-847 252 82 100 DI 130 0.03 -0.018 0.015 0 34 34 286 286 Existing DI to be retained
1156 P-562 J-664 250.1 J-302 250.7 52 100 DI 140 0.03 -0.02 0.016 0 37 36 287.1 287.2 Proposed New DI Pipeline
741 P-415 J-439 251.7 J-159 251.3 36 100 DI 140 0.03 -0.022 0.018 0 36 36 287.9 287.9 Proposed New DI Pipeline
525 P-35 J-317 250.7 J-163 251 27 100 DI 140 0.03 -0.022 0.019 0 37 37 287.9 287.9 Existing UPVC to be Replaced
1018 P-511 J-594 254.3 J-595 254.7 46 100 DI 140 0.04 -0.024 0.022 0 33 33 287.9 287.9 Proposed New DI Pipeline
587 P-42 J-202 258.9 J-352 259 30 100 DI 140 0.04 -0.026 0.024 0 29 29 288 288 Existing UPVC to be Replaced
2264 P-978 J-995 252 J-57 252 1 100 DI 140 0.04 -0.026 0.028 0 34 34 285.9 285.9 Proposed New DI Pipeline
949 P-488 J-557 258 J-250 258 45 100 DI 140 0.04 -0.029 0.031 0 29 29 287.5 287.5 Proposed New DI Pipeline
1491 P-696 J-141 263.3 J-559 264.8 87 100 DI 130 0.05 -0.032 0.042 0 27 26 290.8 290.8 Existing DI to be retained
278 P-20 J-163 251 J-159 251.3 14 100 DI 140 0.05 -0.034 0.042 0 37 36 287.9 287.9 Existing UPVC to be Replaced
1649 P-770 J-625 251.3 J-412 252 91 100 DI 130 0.06 -0.039 0.06 0.01 35 34 286.3 286.3 Existing DI to be retained
2260 P-204 J-352 259 J-1042 259.5 49 100 DI 140 0.06 -0.04 0.057 0 29 28 288 288 Existing UPVC to be Replaced
2037 P-194 J-998 260.1 J-953 256.7 376 100 DI 140 0.07 -0.051 0.087 0.03 27 30 286.9 286.9 Existing UPVC to be Replaced
272 P-19 J-159 251.3 J-160 251.6 13 100 DI 140 0.08 -0.056 0.103 0 36 36 287.9 287.9 Existing UPVC to be Replaced
1662 P-775 J-160 251.6 J-530 253.8 93 100 DI 130 0.09 -0.059 0.13 0.01 36 34 287.9 287.9 Existing DI to be retained
2261 P-205 J-1042 259.5 J-628 259.5 1 100 DI 140 0.09 -0.059 0.114 0 28 28 288 288 Existing UPVC to be Replaced
1072 P-529 J-530 253.8 J-595 254.7 49 100 DI 130 0.1 -0.067 0.166 0.01 34 33 287.9 287.9 Existing DI to be retained
954 P-490 J-559 264.8 J-93 265.7 45 100 DI 130 0.11 -0.072 0.191 0.01 26 25 290.8 290.8 Existing DI to be retained
1111 P-547 J-595 254.7 J-641 256.2 52 100 DI 130 0.14 -0.093 0.305 0.02 33 32 287.9 287.9 Existing DI to be retained
33 P-1 J-3 251.7 J-4 251.7 1 100 DI 140 0.21 -0.143 0.605 0 35 35 286.6 286.6 Existing UPVC to be Replaced
1341 P-100 J-628 259.5 J-394 260 63 100 DI 140 0.27 -0.182 0.932 0.06 28 28 288 288 Existing UPVC to be Replaced
659 P-46 J-394 260 J-261 260 33 100 DI 140 0.28 -0.193 1.03 0.03 28 28 288 288.1 Existing UPVC to be Replaced
432 P-31 J-261 260 J-262 260.2 22 100 DI 140 0.3 -0.203 1.133 0.02 28 28 288.1 288.1 Existing UPVC to be Replaced
632 P-44 J-262 260.2 J-379 260.4 31 100 DI 140 0.31 -0.208 1.191 0.04 28 28 288.1 288.1 Existing UPVC to be Replaced
1153 P-78 J-379 260.4 J-5 259.2 52 100 DI 140 0.32 -0.217 1.291 0.07 28 29 288.1 288.2 Existing UPVC to be Replaced
692 P-397 J-412 252 J-413 251.9 34 100 DI 130 0.41 -0.278 2.338 0.08 34 34 286.3 286.4 Existing DI to be retained
1714 P-1027 J-413 251.9 J-3 251.7 102 100 DI 140 0.42 -0.283 2.101 0.21 34 35 286.4 286.6 Existing CI to be Replaced
170 P-241 J-93 265.7 J-94 265.9 8 100 DI 130 0.42 -0.286 2.465 0.02 25 25 290.8 290.8 Existing DI to be retained
HYDRAULIC MODEL INVENTORY (Junction) OF DMA-1 (Rairangpur)

Elevation Demand Hydraulic Pressure (m


ID Label
(m) (ML/day) Grade (m) H2O)

34 J-3 251.7 0.004 286.6 35


35 J-4 251.7 0 286.6 35
37 J-5 259.2 0.009 288.2 29
38 J-6 259.2 0 288.2 29
40 J-7 265 0.006 289.4 24
41 J-8 265 0.007 289.4 24
70 J-27 251.9 0.001 286 34
71 J-28 251.9 0.012 286 34
82 J-35 261.6 0.004 288.4 27
83 J-36 261.6 0.008 288.4 27
115 J-57 252 0.003 285.9 34
116 J-58 251.9 0.011 285.9 34
121 J-61 265.5 0 291.6 26
122 J-62 265.4 0.013 291.5 26
159 J-85 250.9 0.016 287.2 36
160 J-86 250.9 0.005 287.2 36
171 J-93 265.7 0.003 290.8 25
172 J-94 265.9 0 290.8 25
174 J-95 251.1 0.005 285.9 35
175 J-96 251 0.001 285.9 35
210 J-119 262.5 0.005 288.5 26
211 J-120 262.4 0.005 288.5 26
227 J-130 263.3 0.006 288.6 25
228 J-131 263.1 0.005 288.6 25
242 J-140 263.4 0.006 290.8 27
243 J-141 263.3 0.007 290.8 27
253 J-147 268 0.008 289.4 21
254 J-148 268 0.004 289.4 21
273 J-159 251.3 0 287.9 36
274 J-160 251.6 0.003 287.9 36
276 J-161 265.3 0 290.8 25
277 J-162 265.2 0 290.8 25
279 J-163 251 0.006 287.9 37
310 J-183 250.7 0.006 286.1 35
311 J-184 250.5 0.003 286.1 36
335 J-199 261.4 0.003 288.3 27
336 J-200 261.5 0.008 288.3 27
339 J-201 258.8 0.008 288 29
340 J-202 258.9 0.011 288 29
361 J-215 252 0.006 286.1 34
362 J-216 252 0.014 286.1 34
387 J-232 262.5 0.003 288.4 26
388 J-233 262.5 0.004 288.4 26
407 J-245 251 0.009 287.2 36
408 J-246 250.9 0.008 287.2 36
413 J-249 258.2 0.005 287.6 29
Elevation Demand Hydraulic Pressure (m
ID Label
(m) (ML/day) Grade (m) H2O)

414 J-250 258 0.005 287.5 29


426 J-257 261.9 0.001 288.4 26
427 J-258 261.7 0.003 288.4 27
429 J-259 260.1 0.001 288.2 28
433 J-261 260 0.008 288.1 28
434 J-262 260.2 0.004 288.1 28
455 J-275 259.5 0.005 288.3 29
456 J-276 259.4 0 288.3 29
471 J-285 263.3 0.007 290.8 27
487 J-295 259.2 0.002 288.1 29
489 J-296 261 0.004 288.2 27
500 J-302 250.7 0.008 287.2 36
506 J-305 264.7 0.011 289 24
507 J-306 264.4 0.003 288.9 24
526 J-317 250.7 0.006 287.9 37
532 J-319 260.2 0.005 288.3 28
539 J-323 251.8 0 286.3 34
540 J-324 251.8 0.015 286.3 34
560 J-336 249.6 0.005 287.1 37
561 J-337 249.6 0.016 287.1 37
568 J-340 249.1 0.004 287.9 39
569 J-341 249 0.01 287.9 39
579 J-347 258 0 287.4 29
583 J-349 264.1 0.004 288.9 25
588 J-352 259 0.003 288 29
596 J-357 251.8 0.002 286.1 34
621 J-372 252 0.004 286.1 34
633 J-379 260.4 0.002 288.1 28
637 J-381 261.9 0.003 288.3 26
660 J-394 260 0.006 288 28
678 J-403 251.3 0 287.2 36
679 J-404 251.3 0.014 287.2 36
691 J-411 258.9 0.007 288.1 29
693 J-412 252 0.007 286.3 34
694 J-413 251.9 0.005 286.4 34
728 J-432 263 0.004 288.6 26
742 J-439 251.7 0.022 287.9 36
763 J-452 259.5 0.004 288 29
781 J-462 251.9 0.001 287.3 35
825 J-487 263.9 0.006 288.8 25
847 J-500 259 0.002 288.1 29
869 J-512 251 0.005 287 36
870 J-513 250.9 0.013 287 36
887 J-522 248.5 0.004 287.1 38
888 J-523 248.2 0 287.1 39
900 J-530 253.8 0.006 287.9 34
901 J-531 253.4 0.003 287.9 34
Elevation Demand Hydraulic Pressure (m
ID Label
(m) (ML/day) Grade (m) H2O)

909 J-535 262.7 0.005 288.5 26


948 J-556 258.4 0.006 288 29
950 J-557 258 0.029 287.5 29
955 J-559 264.8 0.008 290.8 26
960 J-562 258 0.002 287.6 30
971 J-568 251.7 0.002 287.9 36
973 J-569 264.2 0.008 290.8 26
977 J-571 252 0.025 285.9 34
997 J-582 264.8 0.005 290.8 26
1019 J-594 254.3 0.017 287.9 33
1020 J-595 254.7 0.002 287.9 33
1027 J-599 252 0.003 287.2 35
1028 J-600 251.3 0.003 287.2 36
1037 J-605 263.6 0.009 289 25
1038 J-606 263.8 0.001 289 25
1056 J-615 252 0.009 285.9 34
1057 J-616 252 0.016 285.9 34
1076 J-625 251.3 0.002 286.3 35
1083 J-628 259.5 0.004 288 28
1089 J-631 250.9 0.002 286 35
1094 J-633 260.7 0.002 288.3 28
1106 J-638 250.6 0.005 285.9 35
1112 J-641 256.2 0.006 287.9 32
1119 J-644 251.6 0.019 286 34
1157 J-664 250.1 0.02 287.1 37
1179 J-672 253.3 0.007 287.9 35
1189 J-677 251.3 0.002 286.1 35
1206 J-685 250.8 0.005 287.9 37
1212 J-688 255.3 0.001 287.8 32
1213 J-689 255.3 0.002 287.8 33
1215 J-690 248.4 0.009 287.1 39
1234 J-700 259.3 0.012 288 29
1239 J-702 263.7 0.019 290.8 27
1245 J-704 255 0 287.9 33
1258 J-711 263.7 0.004 288.5 25
1281 J-721 258.6 0.002 288.3 30
1353 J-755 255.3 0.007 287.8 33
1443 J-795 252 0.004 286 34
1473 J-807 265.1 0.001 291.1 26
1506 J-819 262.6 0.002 288.5 26
1520 J-826 251.5 0.022 286.3 35
1532 J-830 249.4 0.004 285.9 36
1547 J-837 251.7 0.006 286.1 34
1558 J-842 248 0.004 286 38
1564 J-844 249.8 0.004 286 36
1569 J-846 264 0.002 288.6 25
1571 J-847 252 0.034 286 34
Elevation Demand Hydraulic Pressure (m
ID Label
(m) (ML/day) Grade (m) H2O)

1580 J-852 262.3 0.004 289 27


1600 J-860 264.7 0.008 291.1 26
1641 J-872 263.7 0.001 289.4 26
1644 J-873 249.6 0.008 287.1 37
1688 J-892 250 0.001 287.1 37
1693 J-894 259.6 0.003 288.4 29
1695 J-895 251.2 0.014 287.2 36
1710 J-901 262 0.004 288.4 26
1711 J-902 262.7 0.002 288.4 26
1728 J-908 256.4 0.003 287.4 31
1759 J-919 250.8 0.005 287 36
1762 J-920 262.2 0.003 289.4 27
1821 J-937 251.9 0 287.3 35
1822 J-938 251.3 0 287.3 36
1828 J-941 253.4 0.007 285.9 32
1829 J-942 255.8 0.003 285.9 30
1852 J-951 261 0.012 288.4 27
1856 J-953 256.7 0.026 286.9 30
1867 J-955 249 0.004 287.1 38
1872 J-957 259.5 0.004 288 28
1873 J-958 258 0.014 288 30
1876 J-959 264.1 0.012 290.8 27
1922 J-971 248.5 0.005 287.1 38
1929 J-973 250 0.006 287.1 37
1943 J-977 249.9 0.003 285.9 36
1960 J-982 251 0.005 285.9 35
1983 J-986 250.6 0.005 285.9 35
1997 J-989 250.9 0.022 287.1 36
2006 J-991 251 0 285.9 35
2028 J-995 252 0.006 285.9 34
2029 J-996 251.1 0.004 285.9 35
2038 J-998 260.1 0.051 286.9 27
2050 J-1002 255.4 0 285.9 30
2079 J-1012 270 0 286.9 17
2162 J-1024 251.4 0 291.5 40
2165 J-1025 251.4 0 286.3 35
2259 J-1042 259.5 0.001 288 28
HYDRAULIC MODEL INVENTORY (Pipe) OF DMA-2 (Rairangpur)
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
ID Label Start Elevation Stop Node Elevation (Scaled) Diameter Material Williams Velocity Flow Gradient Headloss (Start) (m (Stop) (m Grade Grade Remarks
Node Start Stop (m) (mm) C (m/s) (MLD) (m/km) (m) H2O) H2O) (Start) (m) (Stop) (m)

1740 P-801 J-903 264.4 J-885 263.3 107 150 DI 130 0.71 1.08 3.999 0.43 19 20 283.8 283.3 Existing DI to be retained
1712 P-792 J-897 264.6 J-903 264.4 102 150 DI 130 0.71 1.08 3.999 0.41 19 19 284.2 283.8 Existing DI to be retained
2152 P-960 J-885 263.3 J-1021 263.2 14 150 DI 130 0.7 1.063 3.883 0.05 20 20 283.3 283.3 Existing DI to be retained
1863 P-854 J-532 263.1 J-174 262.5 140 100 DI 130 0.71 0.482 6.477 0.91 20 19 282.9 282 Existing DI to be retained
822 P-444 J-174 262.5 J-486 262 39 100 DI 130 0.56 0.381 4.183 0.16 19 20 282 281.8 Existing DI to be retained
42 P-217 J-9 263.7 J-10 263.7 1 100 DI 130 0.51 0.348 3.537 0 19 19 282.6 282.6 Existing DI to be retained
2011 P-909 J-486 262 J-332 255.9 305 100 DI 130 0.51 0.348 3.53 1.08 20 25 281.8 280.8 Existing DI to be retained
1092 P-539 J-10 263.7 J-526 263.5 49 100 DI 130 0.5 0.339 3.368 0.17 19 19 282.6 282.4 Existing DI to be retained
1504 P-702 J-526 263.5 J-303 264.4 74 100 DI 130 0.45 0.308 2.828 0.21 19 18 282.4 282.2 Existing DI to be retained
515 P-338 J-311 262.8 J-312 262.5 26 100 DI 130 0.45 0.304 2.759 0.07 20 20 282.9 282.8 Existing DI to be retained
2155 P-963 J-1021 263.2 J-841 264.3 112 100 DI 130 0.45 0.303 2.734 0.31 20 19 283.3 283 Existing DI to be retained
866 P-463 J-312 262.5 J-511 263.1 41 100 DI 130 0.42 0.283 2.412 0.1 20 20 282.8 282.7 Existing DI to be retained
699 P-399 J-303 264.4 J-416 264.6 34 100 DI 130 0.4 0.272 2.236 0.08 18 18 282.2 282.2 Existing DI to be retained
533 P-344 J-320 263.3 J-9 263.7 28 100 DI 130 0.38 0.257 2.02 0.06 19 19 282.7 282.6 Existing DI to be retained
986 P-501 J-416 264.6 J-333 264.3 46 100 DI 130 0.37 0.25 1.922 0.09 18 18 282.2 282.1 Existing DI to be retained
2153 P-961 J-1021 263.2 J-604 261.7 92 100 DI 130 0.37 0.25 1.918 0.18 20 21 283.3 283.1 Existing DI to be retained
2150 P-959 J-841 264.3 J-838 264.2 35 100 DI 130 0.36 0.244 1.829 0.06 19 19 283 282.9 Existing DI to be retained
1767 P-815 J-333 264.3 J-707 264.9 114 100 DI 130 0.35 0.237 1.743 0.2 18 17 282.1 281.9 Existing DI to be retained
933 P-482 J-12 262.6 J-311 262.8 43 100 DI 130 0.35 0.235 1.713 0.07 20 20 283 282.9 Existing DI to be retained
1250 P-599 J-707 264.9 J-440 264 57 100 DI 140 0.34 0.234 1.476 0.08 17 18 281.9 281.8 Proposed New DI Pipeline
1113 P-548 J-604 261.7 J-457 262.4 50 100 DI 130 0.34 0.232 1.664 0.08 21 21 283.1 283 Existing DI to be retained
771 P-427 J-457 262.4 J-11 262.6 37 100 DI 130 0.31 0.208 1.359 0.05 21 20 283 283 Existing DI to be retained
45 P-218 J-11 262.6 J-12 262.6 1 100 DI 130 0.29 0.195 1.199 0 20 20 283 283 Existing DI to be retained
142 P-233 J-75 259.7 J-76 259.8 6 100 DI 140 0.27 0.18 0.913 0.01 20 20 279.5 279.5 Proposed New DI Pipeline
902 P-476 J-511 263.1 J-320 263.3 42 100 DI 130 0.26 0.177 1.015 0.04 20 19 282.7 282.7 Existing DI to be retained
2148 P-958 J-838 264.2 J-857 264.8 219 100 DI 130 0.23 0.157 0.806 0.18 19 18 282.9 282.7 Existing DI to be retained
803 P-52 J-474 264.9 J-475 265 39 100 DI 140 0.17 0.117 0.412 0.02 18 18 282.7 282.6 Existing UPVC to be Replaced
2036 P-920 J-440 264 J-591 265.3 693 100 DI 140 0.17 0.116 0.402 0.28 18 16 281.8 281.5 Proposed New DI Pipeline
1356 P-637 J-440 264 J-33 262 64 100 DI 140 0.15 0.103 0.322 0.02 18 20 281.8 281.8 Proposed New DI Pipeline
1480 P-690 J-511 263.1 J-169 261.1 73 100 DI 140 0.14 0.097 0.292 0.02 20 22 282.7 282.7 Proposed New DI Pipeline
1559 P-729 J-169 261.1 J-320 263.3 92 100 DI 140 0.13 0.086 0.233 0.02 22 19 282.7 282.7 Proposed New DI Pipeline
1548 P-723 J-838 264.2 J-311 262.8 81 100 DI 140 0.11 0.075 0.182 0.01 19 20 282.9 282.9 Proposed New DI Pipeline
78 P-223 J-33 262 J-34 261.9 3 100 DI 140 0.09 0.064 0.136 0 20 20 281.8 281.8 Proposed New DI Pipeline
1393 P-651 J-591 265.3 J-301 264.7 67 100 DI 140 0.09 0.06 0.119 0.01 16 17 281.5 281.5 Proposed New DI Pipeline
1013 P-510 J-591 265.3 J-592 264.5 50 100 DI 140 0.08 0.052 0.091 0 16 17 281.5 281.5 Proposed New DI Pipeline
1021 P-512 J-34 261.9 J-596 261.1 46 100 DI 140 0.07 0.048 0.08 0 20 21 281.8 281.8 Proposed New DI Pipeline
1907 P-865 J-792 263 J-409 261.3 209 100 DI 130 0.07 0.044 0.078 0.02 18 20 281.5 281.5 Existing DI to be retained
1554 P-726 J-841 264.3 J-12 262.6 80 100 DI 140 0.06 0.043 0.065 0.01 19 20 283 283 Proposed New DI Pipeline
1164 P-567 J-592 264.5 J-79 264.3 52 100 DI 130 0.06 0.043 0.073 0 17 17 281.5 281.5 Existing DI to be retained
529 P-342 J-33 262 J-228 261.4 36 100 DI 140 0.05 0.035 0.043 0 20 20 281.8 281.8 Proposed New DI Pipeline
2012 P-910 J-174 262.5 J-552 259.9 307 100 DI 130 0.05 0.031 0.041 0.01 19 22 282 282 Existing DI to be retained
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
ID Label Start Elevation Stop Node Elevation (Scaled) Diameter Material Williams Velocity Flow Gradient Headloss (Start) (m (Stop) (m Grade Grade Remarks
Node Start Stop (m) (mm) C (m/s) (MLD) (m/km) (m) H2O) H2O) (Start) (m) (Stop) (m)

1436 P-672 J-80 264.2 J-792 263 70 100 DI 130 0.05 0.031 0.04 0 17 18 281.5 281.5 Existing DI to be retained
1642 P-766 J-301 264.7 J-792 263 100 100 DI 140 0.04 0.03 0.033 0 17 18 281.5 281.5 Proposed New DI Pipeline
1029 P-514 J-44 255.6 J-601 254.1 47 100 DI 140 0.04 0.025 0.023 0 24 25 279.2 279.2 Proposed New DI Pipeline
892 P-472 J-526 263.5 J-219 262.7 42 100 DI 140 0.03 0.023 0.02 0 19 20 282.4 282.4 Proposed New DI Pipeline
1524 P-711 J-79 264.3 J-244 263 77 100 DI 140 0.03 0.02 0.016 0 17 18 281.5 281.5 Proposed New DI Pipeline
802 P-438 J-312 262.5 J-460 261.1 40 100 DI 140 0.03 0.019 0.014 0 20 22 282.8 282.8 Proposed New DI Pipeline
430 P-310 J-260 264.5 J-80 264.2 22 100 DI 140 0.03 0.019 0.014 0 17 17 281.5 281.5 Proposed New DI Pipeline
148 P-235 J-79 264.3 J-80 264.2 6 100 DI 130 0.03 0.018 0.012 0 17 17 281.5 281.5 Existing DI to be retained
1948 P-881 J-885 263.3 J-979 262.6 194 100 DI 130 0.02 0.017 0.013 0 20 21 283.3 283.3 Existing DI to be retained
557 P-351 J-228 261.4 J-335 261 38 100 DI 140 0.02 0.016 0.011 0 20 21 281.8 281.8 Proposed New DI Pipeline
497 P-331 J-301 264.7 J-260 264.5 25 100 DI 140 0.02 0.014 0.008 0 17 17 281.5 281.5 Proposed New DI Pipeline
504 P-334 J-301 264.7 J-260 264.5 25 100 DI 140 0.02 0.014 0.008 0 17 17 281.5 281.5 Proposed New DI Pipeline
501 P-333 J-303 264.4 J-304 263.8 26 100 DI 140 0.02 0.013 0.007 0 18 18 282.2 282.2 Proposed New DI Pipeline
383 P-300 J-230 257 J-231 256.8 19 100 DI 140 0.02 0.012 0.007 0 22 23 279.5 279.5 Proposed New DI Pipeline
981 P-64 J-573 258.8 J-574 258.5 48 100 DI 140 0.02 0.012 0.006 0 21 21 279.8 279.8 Existing UPVC to be Replaced
1129 P-552 J-574 258.5 J-650 257.3 71 100 DI 140 0.02 0.012 0.006 0 21 22 279.8 279.8 Proposed New DI Pipeline
527 P-341 J-115 257.5 J-318 257.3 28 100 DI 140 0.02 0.012 0.006 0 23 23 280.5 280.5 Proposed New DI Pipeline
1721 P-794 J-457 262.4 J-576 259.4 103 100 DI 140 0.02 0.012 0.006 0 21 24 283 283 Proposed New DI Pipeline
2058 P-199 J-956 264.4 J-1004 260.7 556 100 DI 140 0.02 0.012 0.006 0 18 22 282.6 282.6 Existing UPVC to be Replaced
1454 P-678 J-482 260.2 J-801 258.5 71 100 DI 140 0.02 0.011 0.005 0 19 21 279.5 279.5 Proposed New DI Pipeline
1396 P-653 J-614 260.9 J-775 258.7 82 100 DI 140 0.02 0.011 0.005 0 19 21 279.6 279.6 Proposed New DI Pipeline
2041 P-196 J-475 265 J-1000 268.3 382 100 DI 140 0.01 0.009 0.004 0 18 14 282.6 282.6 Existing UPVC to be Replaced
1372 P-644 J-11 262.6 J-764 261.4 65 100 DI 140 0.01 0.009 0.004 0 20 21 283 283 Proposed New DI Pipeline
687 P-395 J-409 261.3 J-410 262.7 43 100 DI 140 0.01 0.009 0.003 0 20 19 281.5 281.5 Proposed New DI Pipeline
521 P-339 J-116 257.4 J-315 256.9 27 100 DI 140 0.01 0.009 0.003 0 23 24 280.5 280.5 Proposed New DI Pipeline
380 P-299 J-228 261.4 J-229 261.4 19 100 DI 140 0.01 0.008 0.003 0 20 20 281.8 281.8 Proposed New DI Pipeline
927 P-481 J-546 263.3 J-547 264.7 45 100 DI 140 0.01 0.008 0.003 0 18 17 281.5 281.5 Proposed New DI Pipeline
1006 P-506 J-244 263 J-588 262.9 46 100 DI 140 0.01 0.008 0.003 0 18 19 281.5 281.5 Proposed New DI Pipeline
541 P-347 J-10 263.7 J-325 263.1 28 100 DI 140 0.01 0.008 0.003 0 19 20 282.6 282.6 Proposed New DI Pipeline
1376 P-645 J-601 254.1 J-766 253 66 100 DI 140 0.01 0.005 0.001 0 25 26 279.2 279.2 Proposed New DI Pipeline
1974 P-893 J-979 262.6 J-180 260.5 229 100 DI 130 0.01 0.005 0.001 0 21 23 283.3 283.3 Existing DI to be retained
1885 P-859 J-409 261.3 J-128 265 196 100 DI 130 0.01 0.005 0.001 0 20 16 281.5 281.5 Existing DI to be retained
1240 P-594 J-331 256.4 J-703 255.4 57 100 DI 140 0.01 0.004 0.001 0 24 25 280.7 280.7 Proposed New DI Pipeline
743 P-416 J-440 264 J-441 263.8 36 100 DI 140 0.01 0.004 0.001 0 18 18 281.8 281.8 Proposed New DI Pipeline
675 P-392 J-289 259.8 J-402 258.7 33 100 DI 140 0.01 0.004 0.001 0 20 21 279.9 279.9 Proposed New DI Pipeline
288 P-273 J-169 261.1 J-170 261 15 100 DI 140 0.01 0.004 0 0 22 22 282.7 282.7 Proposed New DI Pipeline
1162 P-566 J-332 255.9 J-666 255 52 100 DI 140 0 0.002 0 0 25 26 280.8 280.8 Proposed New DI Pipeline
1764 P-813 J-870 258.9 J-921 258.8 114 100 DI 140 0 0.002 0 0 21 21 280.2 280.2 Proposed New DI Pipeline
554 P-350 J-333 264.3 J-334 263.5 29 100 DI 140 0 0.002 0.001 0 18 19 282.1 282.1 Proposed New DI Pipeline
223 P-257 J-128 265 J-129 265.1 11 100 DI 130 0 0.001 0 0 16 16 281.5 281.5 Existing DI to be retained
366 P-294 J-219 262.7 J-220 262.4 20 100 DI 140 0 0.001 0 0 20 20 282.4 282.4 Proposed New DI Pipeline
859 P-460 J-334 263.5 J-507 263.9 41 100 DI 140 0 0.001 0 0 19 18 282.1 282.1 Proposed New DI Pipeline
941 P-485 J-552 259.9 J-553 259.3 44 100 DI 130 0 0.001 0 0 22 23 282 282 Existing DI to be retained
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
ID Label Start Elevation Stop Node Elevation (Scaled) Diameter Material Williams Velocity Flow Gradient Headloss (Start) (m (Stop) (m Grade Grade Remarks
Node Start Stop (m) (mm) C (m/s) (MLD) (m/km) (m) H2O) H2O) (Start) (m) (Stop) (m)

1219 P-587 J-693 264.1 J-694 263.2 56 100 DI 140 0 0.001 0 0 17 18 281.5 281.5 Proposed New DI Pipeline
2227 P-975 J-180 260.5 J-1034 257.8 208 100 DI 130 0 0 0 0 23 25 283.3 283.3 Existing DI to be retained
2236 P-1069 J-179 260.2 J-1037 258.1 185 100 DI 140 0 0 0 0 23 25 283.3 283.3 Existing CI to be Replaced
2233 P-208 J-553 259.3 J-1036 258.3 67 100 DI 140 0 0 0 0 23 24 282 282 Existing MS to be Replaced
2066 P-200 J-474 264.9 J-1007 260.5 675 100 DI 140 0 0 0 0 18 22 282.7 282.7 Existing UPVC to be Replaced
2203 P-969 J-903 264.4 J-1026 264.2 239 100 DI 130 0 0 0 0 19 20 283.8 283.8 Existing DI to be retained
903 P-477 J-532 263.1 J-533 262.4 42 100 DI 140 0 0 0 0 20 20 282.9 282.9 Proposed New DI Pipeline
1100 P-542 J-460 261.1 J-637 261 49 100 DI 140 0 0 0 0 22 22 282.8 282.8 Proposed New DI Pipeline
2210 P-971 J-1028 264.1 J-956 264.4 238 100 DI 130 0 -0.002 0 0 19 18 282.6 282.6 Existing DI to be retained
1971 P-1049 J-984 262.4 J-179 260.2 225 100 DI 140 0 -0.002 0 0 21 23 283.3 283.3 Existing CI to be Replaced
775 P-428 J-459 262.4 J-460 261.1 37 100 DI 140 0 -0.003 0 0 20 22 282.8 282.8 Proposed New DI Pipeline
1528 P-713 J-693 264.1 J-128 265 82 100 DI 130 0 -0.003 0 0 17 16 281.5 281.5 Existing DI to be retained
460 P-319 J-279 264 J-280 263.4 23 100 DI 140 0.01 -0.004 0.001 0 18 19 282.4 282.4 Proposed New DI Pipeline
303 P-992 J-179 260.2 J-180 260.5 15 100 DI 140 0.01 -0.005 0.001 0 23 23 283.3 283.3 Existing CI to be Replaced
1246 P-597 J-705 260.7 J-460 261.1 68 100 DI 140 0.01 -0.006 0.002 0 22 22 282.8 282.8 Proposed New DI Pipeline
492 P-329 J-298 264 J-280 263.4 30 100 DI 140 0.01 -0.006 0.001 0 18 19 282.4 282.4 Proposed New DI Pipeline
403 P-305 J-243 262.7 J-244 263 20 100 DI 140 0.01 -0.006 0.002 0 19 18 281.5 281.5 Proposed New DI Pipeline
983 P-500 J-575 259.2 J-576 259.4 45 100 DI 140 0.01 -0.006 0.002 0 24 24 283 283 Proposed New DI Pipeline
1288 P-613 J-725 255.1 J-601 254.1 60 100 DI 140 0.01 -0.006 0.002 0 24 25 279.2 279.2 Proposed New DI Pipeline
1151 P-560 J-662 256.4 J-230 257 58 100 DI 140 0.01 -0.007 0.003 0 23 22 279.5 279.5 Proposed New DI Pipeline
1033 P-516 J-603 260.9 J-604 261.7 47 100 DI 140 0.01 -0.007 0.002 0 22 21 283.1 283.1 Proposed New DI Pipeline
1391 P-104 J-773 262.9 J-416 264.6 75 100 DI 140 0.01 -0.008 0.003 0 19 18 282.2 282.2 Existing UPVC to be Replaced
1066 P-526 J-621 262.6 J-34 261.9 48 100 DI 140 0.01 -0.008 0.003 0 19 20 281.8 281.8 Proposed New DI Pipeline
1896 P-862 J-966 258.3 J-866 255 154 100 DI 130 0.01 -0.008 0.003 0 21 24 279.2 279.2 Existing DI to be retained
1572 P-736 J-848 257.8 J-552 259.9 108 100 DI 140 0.01 -0.008 0.003 0 24 22 282 282 Proposed New DI Pipeline
2213 P-972 J-1029 263 J-979 262.6 215 100 DI 130 0.01 -0.009 0.004 0 20 21 283.3 283.3 Existing DI to be retained
661 P-386 J-280 263.4 J-219 262.7 34 100 DI 140 0.02 -0.017 0.011 0 19 20 282.4 282.4 Proposed New DI Pipeline
1359 P-639 J-546 263.3 J-409 261.3 93 100 DI 130 0.03 -0.019 0.017 0 18 20 281.5 281.5 Existing DI to be retained
662 P-387 J-395 256 J-43 255.7 33 100 DI 140 0.03 -0.019 0.015 0 23 23 279.2 279.2 Proposed New DI Pipeline
1084 P-535 J-230 257 J-629 258 49 100 DI 140 0.03 -0.022 0.019 0 22 21 279.5 279.5 Proposed New DI Pipeline
1904 P-864 J-969 257.7 J-43 255.7 220 100 DI 140 0.03 -0.024 0.021 0 21 23 279.2 279.2 Proposed New DI Pipeline
1058 P-524 J-617 261.6 J-486 262 48 100 DI 140 0.04 -0.025 0.023 0 20 20 281.8 281.8 Proposed New DI Pipeline
1667 P-1024 J-883 257.4 J-75 259.7 94 100 DI 140 0.04 -0.025 0.024 0 22 20 279.5 279.5 Existing CI to be Replaced
1853 P-851 J-952 256.1 J-629 258 136 100 DI 130 0.04 -0.026 0.03 0 23 21 279.5 279.5 Existing DI to be retained
1868 P-164 J-956 264.4 J-474 264.9 142 100 DI 140 0.05 -0.037 0.049 0.01 18 18 282.6 282.7 Existing UPVC to be Replaced
1817 P-836 J-629 258 J-76 259.8 127 100 DI 130 0.08 -0.053 0.11 0.01 21 20 279.5 279.5 Existing DI to be retained
93 P-226 J-43 255.7 J-44 255.6 4 100 DI 140 0.09 -0.058 0.108 0 23 24 279.2 279.2 Proposed New DI Pipeline
294 P-274 J-173 262.6 J-174 262.5 15 100 DI 130 0.1 -0.067 0.169 0 19 19 282 282 Existing DI to be retained
1617 P-753 J-44 255.6 J-866 255 87 100 DI 140 0.12 -0.085 0.225 0.02 24 24 279.2 279.2 Proposed New DI Pipeline
1619 P-128 J-9 263.7 J-475 265 87 100 DI 140 0.14 -0.096 0.282 0.02 19 18 282.6 282.6 Existing UPVC to be Replaced
978 P-499 J-572 260.3 J-573 258.8 45 100 DI 130 0.15 -0.103 0.371 0.02 19 21 279.7 279.8 Existing DI to be retained
1631 P-759 J-866 255 J-211 253.4 111 100 DI 130 0.16 -0.111 0.429 0.05 24 26 279.2 279.3 Existing DI to be retained
220 P-256 J-126 253.7 J-127 253.8 10 100 DI 130 0.18 -0.122 0.509 0.01 26 25 279.3 279.3 Existing DI to be retained
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
ID Label Start Elevation Stop Node Elevation (Scaled) Diameter Material Williams Velocity Flow Gradient Headloss (Start) (m (Stop) (m Grade Grade Remarks
Node Start Stop (m) (mm) C (m/s) (MLD) (m/km) (m) H2O) H2O) (Start) (m) (Stop) (m)

353 P-290 J-211 253.4 J-126 253.7 18 100 DI 140 0.18 -0.122 0.444 0.01 26 26 279.3 279.3 Proposed New DI Pipeline
1300 P-617 J-127 253.8 J-730 254.7 61 100 DI 140 0.18 -0.122 0.444 0.03 25 25 279.3 279.3 Proposed New DI Pipeline
1926 P-874 J-730 254.7 J-948 256.9 178 100 DI 130 0.18 -0.122 0.509 0.09 25 22 279.3 279.4 Existing DI to be retained
1842 P-846 J-948 256.9 J-76 259.8 133 100 DI 140 0.18 -0.124 0.457 0.06 22 20 279.4 279.5 Proposed New DI Pipeline
1614 P-751 J-573 258.8 J-288 259.6 90 100 DI 140 0.18 -0.125 0.463 0.04 21 20 279.8 279.8 Proposed New DI Pipeline
1592 P-122 J-474 264.9 J-857 264.8 97 100 DI 140 0.23 -0.157 0.703 0.07 18 18 282.7 282.7 Existing UPVC to be Replaced
1537 P-118 J-572 260.3 J-288 259.6 77 100 DI 140 0.24 -0.163 0.76 0.06 19 20 279.7 279.8 Existing UPVC to be Replaced
815 P-53 J-75 259.7 J-482 260.2 39 100 DI 140 0.32 -0.217 1.291 0.05 20 19 279.5 279.5 Existing UPVC to be Replaced
1052 P-70 J-482 260.2 J-614 260.9 47 100 DI 140 0.35 -0.238 1.523 0.07 19 19 279.5 279.6 Existing UPVC to be Replaced
1527 P-117 J-614 260.9 J-572 260.3 77 100 DI 140 0.38 -0.26 1.795 0.14 19 19 279.6 279.7 Existing UPVC to be Replaced
475 P-33 J-288 259.6 J-289 259.8 24 100 DI 140 0.43 -0.291 2.216 0.05 20 20 279.8 279.9 Existing UPVC to be Replaced
1877 P-168 J-289 259.8 J-870 258.9 150 100 DI 140 0.44 -0.298 2.308 0.35 20 21 279.9 280.2 Existing UPVC to be Replaced
1632 P-760 J-870 258.9 J-115 257.5 90 100 DI 130 0.46 -0.309 2.839 0.25 21 23 280.2 280.5 Existing DI to be retained
203 P-251 J-115 257.5 J-116 257.4 9 100 DI 130 0.47 -0.321 3.045 0.03 23 23 280.5 280.5 Existing DI to be retained
1242 P-595 J-116 257.4 J-331 256.4 57 100 DI 130 0.49 -0.33 3.203 0.18 23 24 280.5 280.7 Existing DI to be retained
551 P-349 J-331 256.4 J-332 255.9 29 100 DI 130 0.49 -0.336 3.307 0.09 24 25 280.7 280.8 Existing DI to be retained
2154 P-962 J-532 263.1 J-1021 263.2 52 100 DI 130 0.74 -0.501 6.957 0.36 20 20 282.9 283.3 Existing DI to be retained
1699 P-788 J-897 264.6 R-2 (ZONE-2) 264.78 152 150 DI 130 0.72 -1.095 4.103 0.62 19 0 284.2 284.8 Existing DI to be retained
HYDRAULIC MODEL INVENTORY (Junction) OF DMA-2 (Rairangpur)

Elevation Demand Hydraulic Pressure (m


ID Label
(m) (ML/day) Grade (m) H2O)

43 J-9 263.7 0.005 282.6 19


44 J-10 263.7 0.001 282.6 19
46 J-11 262.6 0.004 283 20
47 J-12 262.6 0.003 283 20
79 J-33 262 0.004 281.8 20
80 J-34 261.9 0.007 281.8 20
94 J-43 255.7 0.015 279.2 23
95 J-44 255.6 0.002 279.2 24
143 J-75 259.7 0.012 279.5 20
144 J-76 259.8 0.003 279.5 20
149 J-79 264.3 0.005 281.5 17
150 J-80 264.2 0.006 281.5 17
204 J-115 257.5 0 280.5 23
205 J-116 257.4 0 280.5 23
221 J-126 253.7 0 279.3 26
222 J-127 253.8 0 279.3 25
224 J-128 265 0.001 281.5 16
225 J-129 265.1 0.001 281.5 16
289 J-169 261.1 0.007 282.7 22
290 J-170 261 0.004 282.7 22
295 J-173 262.6 0.067 282 19
296 J-174 262.5 0.003 282 19
304 J-179 260.2 0.003 283.3 23
305 J-180 260.5 0 283.3 23
354 J-211 253.4 0.011 279.3 26
367 J-219 262.7 0.006 282.4 20
368 J-220 262.4 0.001 282.4 20
381 J-228 261.4 0.01 281.8 20
382 J-229 261.4 0.008 281.8 20
384 J-230 257 0.003 279.5 22
385 J-231 256.8 0.012 279.5 23
404 J-243 262.7 0.006 281.5 19
405 J-244 263 0.006 281.5 18
431 J-260 264.5 0.009 281.5 17
461 J-279 264 0.004 282.4 18
462 J-280 263.4 0.007 282.4 19
476 J-288 259.6 0.003 279.8 20
477 J-289 259.8 0.003 279.9 20
493 J-298 264 0.006 282.4 18
498 J-301 264.7 0.002 281.5 17
502 J-303 264.4 0.024 282.2 18
503 J-304 263.8 0.013 282.2 18
516 J-311 262.8 0.006 282.9 20
517 J-312 262.5 0.002 282.8 20
522 J-315 256.9 0.009 280.5 24
528 J-318 257.3 0.012 280.5 23
Elevation Demand Hydraulic Pressure (m
ID Label
(m) (ML/day) Grade (m) H2O)

534 J-320 263.3 0.006 282.7 19


542 J-325 263.1 0.008 282.6 20
552 J-331 256.4 0.002 280.7 24
553 J-332 255.9 0.01 280.8 25
555 J-333 264.3 0.011 282.1 18
556 J-334 263.5 0.001 282.1 19
558 J-335 261 0.016 281.8 21
663 J-395 256 0.019 279.2 23
676 J-402 258.7 0.004 279.9 21
688 J-409 261.3 0.011 281.5 20
689 J-410 262.7 0.009 281.5 19
700 J-416 264.6 0.013 282.2 18
744 J-440 264 0.011 281.8 18
745 J-441 263.8 0.004 281.8 18
772 J-457 262.4 0.012 283 21
776 J-459 262.4 0.003 282.8 20
777 J-460 261.1 0.011 282.8 22
804 J-474 264.9 0.002 282.7 18
805 J-475 265 0.013 282.6 18
816 J-482 260.2 0.009 279.5 19
823 J-486 262 0.008 281.8 20
860 J-507 263.9 0.001 282.1 18
867 J-511 263.1 0.008 282.7 20
893 J-526 263.5 0.007 282.4 19
904 J-532 263.1 0.019 282.9 20
905 J-533 262.4 0 282.9 20
928 J-546 263.3 0.011 281.5 18
929 J-547 264.7 0.008 281.5 17
942 J-552 259.9 0.022 282 22
943 J-553 259.3 0.001 282 23
979 J-572 260.3 0.006 279.7 19
980 J-573 258.8 0.01 279.8 21
982 J-574 258.5 0 279.8 21
984 J-575 259.2 0.006 283 24
985 J-576 259.4 0.006 283 24
1007 J-588 262.9 0.008 281.5 19
1014 J-591 265.3 0.004 281.5 16
1015 J-592 264.5 0.009 281.5 17
1022 J-596 261.1 0.048 281.8 21
1030 J-601 254.1 0.014 279.2 25
1034 J-603 260.9 0.007 283.1 22
1035 J-604 261.7 0.011 283.1 21
1053 J-614 260.9 0.011 279.6 19
1059 J-617 261.6 0.025 281.8 20
1067 J-621 262.6 0.008 281.8 19
1085 J-629 258 0.005 279.5 21
1101 J-637 261 0 282.8 22
Elevation Demand Hydraulic Pressure (m
ID Label
(m) (ML/day) Grade (m) H2O)

1130 J-650 257.3 0.012 279.8 22


1152 J-662 256.4 0.007 279.5 23
1163 J-666 255 0.002 280.8 26
1220 J-693 264.1 0.002 281.5 17
1221 J-694 263.2 0.001 281.5 18
1241 J-703 255.4 0.004 280.7 25
1247 J-705 260.7 0.006 282.8 22
1251 J-707 264.9 0.004 281.9 17
1289 J-725 255.1 0.006 279.2 24
1301 J-730 254.7 0 279.3 25
1373 J-764 261.4 0.009 283 21
1377 J-766 253 0.005 279.2 26
1392 J-773 262.9 0.008 282.2 19
1397 J-775 258.7 0.011 279.6 21
1437 J-792 263 0.017 281.5 18
1455 J-801 258.5 0.011 279.5 21
1549 J-838 264.2 0.012 282.9 19
1555 J-841 264.3 0.016 283 19
1573 J-848 257.8 0.008 282 24
1593 J-857 264.8 0 282.7 18
1618 J-866 255 0.019 279.2 24
1633 J-870 258.9 0.01 280.2 21
1668 J-883 257.4 0.025 279.5 22
1673 J-885 263.3 0 283.3 20
1700 J-897 264.6 0.015 284.2 19
1713 J-903 264.4 0 283.8 19
1765 J-921 258.8 0.002 280.2 21
1843 J-948 256.9 0.002 279.4 22
1854 J-952 256.1 0.026 279.5 23
1869 J-956 264.4 0.023 282.6 18
1897 J-966 258.3 0.008 279.2 21
1905 J-969 257.7 0.024 279.2 21
1949 J-979 262.6 0.003 283.3 21
1972 J-984 262.4 0.002 283.3 21
2042 J-1000 268.3 0.009 282.6 14
2059 J-1004 260.7 0.012 282.6 22
2067 J-1007 260.5 0 282.7 22
2151 J-1021 263.2 0.009 283.3 20
2202 J-1026 264.2 0 283.8 20
2208 J-1028 264.1 0.002 282.6 19
2211 J-1029 263 0.009 283.3 20
2226 J-1034 257.8 0 283.3 25
2232 J-1036 258.3 0 282 24
2235 J-1037 258.1 0 283.3 25
HYDRAULIC MODEL INVENTORY (Pipe) OF DMA-3 (Rairangpur)
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

2256 P-212 R-3 (ZONE-3) 260 J-19 260.4 15 300 DI 140 0.6 3.676 1.151 0.02 0 24 284 284 Proposed New DI Pipeline
57 P-3 J-19 260.4 J-20 260.4 2 300 DI 140 0.55 3.376 0.981 0 24 24 284 284 Existing UPVC to be Replaced
1202 P-83 J-20 260.4 J-177 260.6 55 150 DI 140 1.05 1.601 7.223 0.4 24 23 284 283.6 Existing UPVC to be Replaced
300 P-276 J-177 260.6 J-178 260.6 16 150 DI 140 1.05 1.6 7.216 0.11 23 23 283.6 283.5 Existing DI to be Replaced
1190 P-577 J-178 260.6 J-678 259.4 55 150 DI 140 1 1.527 6.617 0.36 23 24 283.5 283.1 Existing DI to be Replaced
1818 P-158 J-678 259.4 J-909 257 127 150 DI 140 0.97 1.479 6.236 0.79 24 25 283.1 282.3 Existing UPVC to be Replaced
2084 P-934 J-281 258.5 J-122 258.6 11 150 DI 140 0.93 1.418 5.771 0.06 23 23 281.6 281.5 Proposed New DI Pipeline
1731 P-146 J-909 257 J-154 257 110 150 DI 140 0.82 1.25 4.57 0.5 25 25 282.3 281.8 Existing UPVC to be Replaced
263 P-17 J-154 257 J-155 257 13 150 DI 140 0.81 1.237 4.483 0.06 25 25 281.8 281.7 Existing UPVC to be Replaced
1296 P-94 J-155 257 J-728 259.2 61 150 DI 140 0.79 1.213 4.323 0.26 25 22 281.7 281.5 Existing UPVC to be Replaced
1417 P-106 J-728 259.2 J-545 261 70 150 DI 140 0.78 1.188 4.158 0.29 22 20 281.5 281.2 Existing UPVC to be Replaced
2033 P-1054 J-291 256.4 J-47 258.2 347 150 DI 140 0.67 1.022 3.147 1.09 22 19 278.4 277.4 Existing CI to be Replaced
99 P-985 J-47 258.2 J-48 258.3 4 100 DI 140 0.81 0.548 7.142 0.03 19 19 277.4 277.3 Existing CI to be Replaced
1836 P-1034 J-48 258.3 J-945 260.4 130 100 DI 140 0.77 0.526 6.619 0.86 19 16 277.3 276.5 Existing CI to be Replaced
512 P-997 J-309 259.5 J-310 259.1 26 100 DI 140 0.68 0.46 5.161 0.13 17 17 276.1 276 Existing CI to be Replaced
1810 P-156 J-158 260.1 J-519 260.9 124 100 DI 140 0.61 0.412 4.22 0.52 24 22 283.8 283.3 Existing UPVC to be Replaced
549 P-38 J-241 263.1 J-330 263.1 28 100 DI 140 0.53 0.357 3.24 0.09 14 14 277.5 277.4 Existing UPVC to be Replaced
648 P-382 J-168 261.1 J-388 262 32 100 DI 140 0.51 0.346 3.058 0.1 22 21 282.8 282.7 Proposed New DI Pipeline
1605 P-126 J-519 260.9 J-481 261.4 86 100 DI 140 0.5 0.337 2.912 0.25 22 22 283.3 283.1 Existing UPVC to be Replaced
1410 P-660 J-388 262 J-781 261 68 100 DI 140 0.49 0.335 2.871 0.2 21 21 282.7 282.5 Proposed New DI Pipeline
1902 P-174 J-330 263.1 J-968 263.2 157 100 DI 140 0.49 0.334 2.863 0.45 14 14 277.4 277 Existing UPVC to be Replaced
1604 P-125 J-481 261.4 J-66 261.2 85 100 DI 140 0.46 0.313 2.54 0.22 22 22 283.1 282.9 Existing UPVC to be Replaced
128 P-11 J-66 261.2 J-67 261.2 5 100 DI 140 0.43 0.293 2.245 0.01 22 22 282.9 282.8 Existing UPVC to be Replaced
1918 P-869 J-284 260.3 J-42 264 165 100 DI 130 0.43 0.292 2.549 0.42 24 19 283.9 283.5 Existing DI to be retained
286 P-272 J-67 261.2 J-168 261.1 15 100 DI 140 0.42 0.284 2.112 0.03 22 22 282.8 282.8 Proposed New DI Pipeline
176 P-242 J-97 251.5 J-98 251.5 8 100 DI 140 0.4 0.269 1.921 0.02 23 23 274.9 274.9 Proposed New DI Pipeline
2119 P-948 J-98 251.5 J-697 251.4 4 100 DI 130 0.4 0.269 2.199 0.01 23 23 274.9 274.9 Existing DI to be retained
2120 P-949 J-697 251.4 J-822 251 97 100 DI 130 0.39 0.268 2.174 0.21 23 24 274.9 274.7 Existing DI to be retained
1874 P-1038 J-945 260.4 J-891 261 144 100 DI 140 0.35 0.24 1.552 0.22 16 15 276.5 276.2 Existing CI to be Replaced
108 P-987 J-53 256.9 J-54 256.8 5 100 DI 140 0.34 0.234 1.478 0.01 19 19 275.8 275.8 Existing CI to be Replaced
1630 P-1023 J-310 259.1 J-53 256.9 90 100 DI 140 0.34 0.233 1.47 0.13 17 19 276 275.8 Existing CI to be Replaced
1685 P-1026 J-891 261 J-309 259.5 96 100 DI 140 0.34 0.232 1.452 0.14 15 17 276.2 276.1 Existing CI to be Replaced
670 P-47 J-310 259.1 J-399 258.8 33 100 DI 140 0.31 0.211 1.217 0.04 17 17 276 275.9 Existing UPVC to be Replaced
1317 P-97 J-699 261.5 J-226 261.6 64 100 DI 140 0.31 0.209 1.201 0.08 15 15 276.9 276.8 Existing UPVC to be Replaced
1886 P-171 J-945 260.4 J-646 258.6 148 100 DI 140 0.3 0.202 1.124 0.17 16 18 276.5 276.3 Existing UPVC to be Replaced
377 P-298 J-226 261.6 J-227 261.6 19 100 DI 140 0.3 0.201 1.114 0.02 15 15 276.8 276.8 Proposed New DI Pipeline
139 P-988 J-73 266.1 J-74 266.1 6 100 DI 140 0.28 0.189 0.993 0.01 11 11 277.5 277.5 Existing CI to be Replaced
1541 P-720 J-227 261.6 J-834 261.4 104 100 DI 140 0.27 0.181 0.923 0.1 15 15 276.8 276.7 Proposed New DI Pipeline
1318 P-623 J-118 258.5 J-528 257.9 62 100 DI 140 0.26 0.18 0.907 0.06 18 19 276.7 276.6 Proposed New DI Pipeline
1400 P-654 J-777 255.2 J-29 254.2 67 100 DI 130 0.26 0.176 1.002 0.07 20 21 275.5 275.4 Existing DI to be retained
268 P-268 J-107 254 J-157 253.9 13 100 DI 130 0.26 0.176 1 0.01 22 22 275.7 275.7 Existing DI to be retained
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

72 P-222 J-29 254.2 J-30 254.2 3 100 DI 130 0.25 0.167 0.909 0 21 21 275.4 275.4 Existing DI to be retained
1535 P-717 J-528 257.9 J-832 257.7 99 100 DI 140 0.24 0.163 0.758 0.07 19 19 276.6 276.6 Proposed New DI Pipeline
151 P-236 J-81 260.8 J-82 260.9 6 100 DI 130 0.23 0.159 0.83 0.01 16 16 277 277 Existing DI to be retained
1998 P-903 J-30 254.2 J-454 251.2 267 100 DI 130 0.23 0.153 0.774 0.21 21 24 275.4 275.2 Existing DI to be retained
789 P-434 J-466 257 J-467 255.9 38 100 DI 130 0.23 0.153 0.772 0.03 19 20 275.8 275.8 Existing DI to be retained
1975 P-894 J-282 258.8 J-362 261.2 231 100 DI 140 0.22 0.149 0.642 0.15 23 20 281.6 281.4 Proposed New DI Pipeline
2068 P-929 J-136 260 J-1008 258 678 100 DI 140 0.21 0.145 0.608 0.41 17 18 276.7 276.3 Proposed New DI Pipeline
401 P-994 J-54 256.8 J-242 256.4 20 100 DI 140 0.21 0.145 0.607 0.01 19 19 275.8 275.8 Existing CI to be Replaced
604 P-367 J-362 261.2 J-363 261 30 100 DI 140 0.2 0.137 0.551 0.02 20 20 281.4 281.4 Proposed New DI Pipeline
1844 P-847 J-150 256.9 J-281 258.5 132 100 DI 140 0.19 0.13 0.496 0.07 25 23 281.7 281.6 Proposed New DI Pipeline
1848 P-849 J-363 261 J-769 259.7 134 100 DI 140 0.19 0.127 0.479 0.06 20 22 281.4 281.3 Proposed New DI Pipeline
1466 P-684 J-242 256.4 J-565 254.8 72 100 DI 130 0.18 0.123 0.519 0.04 19 21 275.8 275.8 Existing DI to be retained
1771 P-818 J-822 251 J-51 250.8 115 100 DI 130 0.15 0.104 0.379 0.04 24 24 274.7 274.7 Existing DI to be retained
206 P-252 J-117 258.6 J-118 258.5 12 100 DI 140 0.15 0.103 0.323 0 18 18 276.7 276.7 Proposed New DI Pipeline
1799 P-1033 J-887 267.7 J-733 269.5 122 100 DI 140 0.14 0.093 0.266 0.03 10 9 278.1 278.1 Existing CI to be Replaced
1607 P-748 J-467 255.9 J-108 254.1 86 100 DI 130 0.14 0.092 0.302 0.03 20 22 275.8 275.8 Existing DI to be retained
1263 P-89 J-137 260 J-17 258.8 57 100 DI 140 0.13 0.092 0.26 0.01 17 18 276.7 276.7 Existing UPVC to be Replaced
1880 P-1039 J-74 266.1 J-821 265.9 149 100 DI 140 0.13 0.091 0.257 0.04 11 12 277.5 277.4 Existing CI to be Replaced
1102 P-543 J-17 258.8 J-118 258.5 52 100 DI 140 0.13 0.085 0.227 0.01 18 18 276.7 276.7 Proposed New DI Pipeline
1967 P-187 J-821 265.9 J-495 263.2 222 100 DI 140 0.12 0.084 0.22 0.05 12 14 277.4 277.4 Existing UPVC to be Replaced
1243 P-1013 J-54 256.8 J-466 257 57 100 DI 140 0.11 0.076 0.184 0.01 19 19 275.8 275.8 Existing CI to be Replaced
1995 P-191 J-968 263.2 J-699 261.5 264 100 DI 140 0.11 0.075 0.18 0.05 14 15 277 276.9 Existing UPVC to be Replaced
2021 P-192 J-551 260.5 J-762 259.1 320 100 DI 140 0.11 0.075 0.18 0.06 16 18 276.7 276.7 Existing UPVC to be Replaced
235 P-989 J-136 260 J-137 260 12 100 DI 140 0.11 0.071 0.162 0 17 17 276.7 276.7 Existing CI to be Replaced
247 P-263 J-144 259.5 J-145 259.4 12 100 DI 140 0.1 0.07 0.157 0 18 18 277.3 277.3 Proposed New DI Pipeline
881 P-470 J-519 260.9 J-520 259 42 100 DI 140 0.1 0.068 0.152 0.01 22 24 283.3 283.3 Proposed New DI Pipeline
837 P-450 J-495 263.2 J-496 262.8 40 100 DI 140 0.1 0.068 0.15 0.01 14 15 277.4 277.4 Proposed New DI Pipeline
450 P-316 J-178 260.6 J-84 260.8 23 100 DI 130 0.1 0.068 0.171 0 23 23 283.5 283.5 Existing DI to be retained
1931 P-876 J-65 250.8 J-974 250.4 182 100 DI 130 0.1 0.066 0.163 0.03 24 24 274.7 274.6 Existing DI to be retained
2031 P-193 J-974 250.4 J-997 248.2 354 100 DI 140 0.1 0.065 0.138 0.05 24 26 274.6 274.6 Existing UPVC to be Replaced
1369 P-102 J-762 259.1 J-763 257.5 65 100 DI 140 0.09 0.061 0.122 0.01 18 19 276.7 276.6 Existing UPVC to be Replaced
1077 P-532 J-626 260.9 J-627 259.8 49 100 DI 130 0.09 0.058 0.129 0.01 16 17 276.9 276.9 Existing DI to be retained
599 P-365 J-359 250 J-360 250 31 100 DI 140 0.09 0.058 0.111 0 25 25 274.6 274.6 Proposed New DI Pipeline
924 P-59 J-545 261 J-461 261.5 43 100 DI 140 0.08 0.057 0.109 0 20 20 281.2 281.2 Existing UPVC to be Replaced
156 P-237 J-84 260.8 J-68 260.9 7 100 DI 130 0.07 0.049 0.093 0 23 23 283.5 283.5 Existing DI to be retained
1789 P-1032 J-763 257.5 J-929 254.3 120 100 DI 140 0.07 0.046 0.073 0.01 19 22 276.6 276.6 Existing CI to be Replaced
884 P-54 J-461 261.5 J-521 261.7 42 100 DI 140 0.07 0.046 0.073 0 20 19 281.2 281.2 Existing UPVC to be Replaced
1355 P-211 J-467 255.9 J-504 255 85 100 DI 140 0.06 0.042 0.063 0.01 20 21 275.8 275.8 Existing GI to be Replaced
1663 P-134 J-521 261.7 J-434 262.4 96 100 DI 140 0.06 0.042 0.06 0.01 19 19 281.2 281.2 Existing UPVC to be Replaced
105 P-227 J-51 250.8 J-52 250.8 5 100 DI 130 0.06 0.038 0.06 0 24 24 274.7 274.7 Existing DI to be retained
1086 P-536 J-627 259.8 J-630 258 50 100 DI 130 0.06 0.038 0.058 0 17 19 276.9 276.9 Existing DI to be retained
1936 P-182 J-52 250.8 J-479 251 186 100 DI 140 0.05 0.037 0.049 0.01 24 24 274.7 274.6 Existing UPVC to be Replaced
616 P-370 J-145 259.4 J-370 259.1 31 100 DI 140 0.05 0.033 0.04 0 18 18 277.3 277.3 Proposed New DI Pipeline
731 P-411 J-434 262.4 J-423 263.2 35 100 DI 140 0.05 0.032 0.038 0 19 18 281.2 281.2 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

1041 P-68 J-479 251 J-608 250.9 47 100 DI 140 0.05 0.031 0.035 0 24 24 274.6 274.6 Existing UPVC to be Replaced
1906 P-175 J-608 250.9 J-188 249.9 159 100 DI 140 0.04 0.03 0.032 0.01 24 25 274.6 274.6 Existing UPVC to be Replaced
1379 P-646 J-277 258.9 J-767 258.7 67 100 DI 140 0.04 0.03 0.032 0 19 19 278 278 Proposed New DI Pipeline
1753 P-148 J-776 256.9 J-541 258.3 109 100 DI 140 0.04 0.029 0.032 0 25 23 281.7 281.7 Existing UPVC to be Replaced
1122 P-76 J-646 258.6 J-647 258.2 51 100 DI 140 0.04 0.028 0.029 0 18 18 276.3 276.3 Existing UPVC to be Replaced
2017 P-913 J-834 261.4 J-651 260.5 320 100 DI 140 0.04 0.028 0.028 0.01 15 16 276.7 276.7 Proposed New DI Pipeline
466 P-320 J-145 259.4 J-283 259.3 24 100 DI 140 0.04 0.027 0.028 0 18 18 277.3 277.3 Proposed New DI Pipeline
1984 P-897 J-678 259.4 J-470 258.6 241 100 DI 130 0.04 0.026 0.029 0.01 24 24 283.1 283.1 Existing DI to be retained
1900 P-173 J-858 259.3 J-754 256.4 155 100 DI 140 0.04 0.026 0.025 0 17 20 276.6 276.6 Existing UPVC to be Replaced
2218 P-974 J-769 259.7 J-1030 261.4 149 100 DI 130 0.04 0.024 0.026 0 22 20 281.3 281.3 Existing DI to be retained
1791 P-826 J-68 260.9 J-930 263.1 303 100 DI 130 0.03 0.024 0.024 0.01 23 20 283.5 283.5 Existing DI to be retained
2216 P-973 J-1030 261.4 J-878 262.3 89 100 DI 130 0.03 0.023 0.024 0 20 19 281.3 281.3 Existing DI to be retained
1457 P-680 J-661 262.2 J-802 260.8 71 100 DI 130 0.03 0.023 0.023 0 15 16 276.8 276.8 Existing DI to be retained
1054 P-522 J-290 256.5 J-497 255.9 48 100 DI 140 0.03 0.022 0.019 0 22 22 278.4 278.4 Proposed New DI Pipeline
1336 P-630 J-360 250 J-748 250 63 100 DI 140 0.03 0.022 0.019 0 25 25 274.6 274.6 Proposed New DI Pipeline
1988 P-899 J-313 263.3 J-987 264.7 252 100 DI 140 0.03 0.022 0.019 0 14 13 277.8 277.8 Proposed New DI Pipeline
1655 P-772 J-878 262.3 J-879 262.5 92 100 DI 130 0.03 0.022 0.021 0 19 19 281.3 281.3 Existing DI to be retained
1958 P-887 J-929 254.3 J-236 250.6 214 100 DI 130 0.03 0.021 0.02 0 22 26 276.6 276.6 Existing DI to be retained
712 P-404 J-423 263.2 J-424 263.9 35 100 DI 140 0.03 0.021 0.018 0 18 17 281.2 281.2 Proposed New DI Pipeline
918 P-479 J-541 258.3 J-542 259.3 56 100 DI 130 0.03 0.02 0.018 0 23 22 281.7 281.7 Existing DI to be retained
1521 P-709 J-458 256.7 J-827 257.1 103 100 DI 140 0.03 0.019 0.015 0 25 25 281.7 281.7 Proposed New DI Pipeline
1174 P-569 J-107 254 J-670 253.8 53 100 DI 140 0.03 0.018 0.014 0 22 22 275.7 275.7 Proposed New DI Pipeline
2060 P-927 J-1005 251.1 J-1006 258.4 561 100 DI 140 0.03 0.018 0.013 0.01 26 19 277 277 Proposed New DI Pipeline
2080 P-933 J-1006 258.4 J-1013 268 1,298 100 DI 140 0.03 0.018 0.013 0.02 19 9 277 277 Proposed New DI Pipeline
1674 P-780 J-188 249.9 J-886 250 110 100 DI 140 0.03 0.017 0.012 0 25 25 274.6 274.6 Proposed New DI Pipeline
1881 P-858 J-14 260.9 J-37 264.1 150 100 DI 130 0.02 0.016 0.011 0 22 19 283.5 283.5 Existing DI to be retained
1684 P-782 J-155 257 J-716 258.3 99 100 DI 140 0.02 0.014 0.008 0 25 23 281.7 281.7 Proposed New DI Pipeline
584 P-360 J-350 257.2 J-351 257.2 30 100 DI 140 0.02 0.013 0.006 0 19 19 276.6 276.6 Proposed New DI Pipeline
1744 P-802 J-408 261.3 J-915 262.5 109 100 DI 140 0.02 0.012 0.006 0 16 15 277.5 277.5 Proposed New DI Pipeline
1423 P-107 J-754 256.4 J-786 256.5 69 100 DI 140 0.02 0.012 0.006 0 20 20 276.6 276.6 Existing UPVC to be Replaced
1427 P-667 J-297 258.2 J-788 256.9 99 100 DI 140 0.02 0.011 0.005 0 20 21 278.1 278.1 Proposed New DI Pipeline
1825 P-840 J-398 260.6 J-940 259.7 128 100 DI 140 0.02 0.011 0.005 0 16 17 276.6 276.6 Proposed New DI Pipeline
1647 P-769 J-765 263.1 J-875 264 96 100 DI 140 0.02 0.011 0.005 0 16 15 278.7 278.7 Proposed New DI Pipeline
1451 P-677 J-799 263.1 J-800 261.7 72 100 DI 140 0.02 0.011 0.005 0 18 19 280.8 280.8 Proposed New DI Pipeline
317 P-22 J-188 249.9 J-189 249.9 16 100 DI 140 0.01 0.01 0.005 0 25 25 274.6 274.6 Existing UPVC to be Replaced
1812 P-833 J-630 258 J-935 257.9 126 100 DI 130 0.01 0.01 0.005 0 19 19 276.9 276.9 Existing DI to be retained
1628 P-758 J-189 249.9 J-869 250.1 89 100 DI 140 0.01 0.009 0.004 0 25 25 274.6 274.6 Proposed New DI Pipeline
1456 P-679 J-239 260.1 J-223 259.2 83 100 DI 140 0.01 0.009 0.004 0 16 17 276.6 276.6 Proposed New DI Pipeline
1689 P-784 J-388 262 J-893 259.4 97 100 DI 140 0.01 0.009 0.004 0 21 23 282.7 282.7 Proposed New DI Pipeline
767 P-425 J-455 259.1 J-456 258.6 39 100 DI 140 0.01 0.008 0.003 0 18 19 277.3 277.3 Proposed New DI Pipeline
392 P-303 J-236 250.6 J-237 250.6 19 100 DI 140 0.01 0.008 0.003 0 26 26 276.6 276.6 Proposed New DI Pipeline
723 P-407 J-283 259.3 J-430 258.9 35 100 DI 140 0.01 0.008 0.003 0 18 18 277.3 277.3 Proposed New DI Pipeline
857 P-459 J-278 258.6 J-506 258.1 41 100 DI 140 0.01 0.008 0.003 0 19 20 278 278 Proposed New DI Pipeline
1131 P-553 J-651 260.5 J-652 259.8 51 100 DI 140 0.01 0.008 0.003 0 16 17 276.7 276.7 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

1303 P-618 J-172 262.4 J-731 262.8 61 100 DI 140 0.01 0.008 0.003 0 15 15 277.5 277.5 Proposed New DI Pipeline
332 P-283 J-46 260 J-198 259.7 17 100 DI 140 0.01 0.008 0.003 0 24 24 283.8 283.8 Proposed New DI Pipeline
1209 P-584 J-154 257 J-687 257 56 100 DI 140 0.01 0.007 0.003 0 25 25 281.8 281.8 Proposed New DI Pipeline
1498 P-700 J-283 259.3 J-817 260.3 90 100 DI 140 0.01 0.007 0.002 0 18 17 277.3 277.3 Proposed New DI Pipeline
1660 P-774 J-105 253.8 J-881 252.2 94 100 DI 140 0.01 0.007 0.002 0 22 24 275.8 275.8 Proposed New DI Pipeline
1261 P-602 J-187 260 J-713 258.7 58 100 DI 140 0.01 0.007 0.002 0 24 25 283.7 283.7 Proposed New DI Pipeline
1664 P-776 J-423 263.2 J-835 263.4 93 100 DI 140 0.01 0.007 0.003 0 18 18 281.2 281.2 Proposed New DI Pipeline
1920 P-870 J-425 263.3 J-152 263.7 178 100 DI 140 0.01 0.007 0.002 0 14 14 277.4 277.4 Proposed New DI Pipeline
1222 P-588 J-653 259.8 J-695 258.2 56 100 DI 140 0.01 0.007 0.003 0 24 25 283.4 283.4 Proposed New DI Pipeline
1068 P-527 J-351 257.2 J-622 256.9 48 100 DI 140 0.01 0.006 0.002 0 19 20 276.6 276.6 Proposed New DI Pipeline
1588 P-742 J-470 258.6 J-655 258.8 84 100 DI 130 0.01 0.006 0.002 0 24 24 283.1 283.1 Existing DI to be retained
1185 P-575 J-675 256.5 J-676 255.8 56 100 DI 140 0.01 0.006 0.002 0 21 21 277.3 277.3 Proposed New DI Pipeline
1384 P-649 J-769 259.7 J-770 258.5 68 100 DI 140 0.01 0.006 0.002 0 22 23 281.3 281.3 Proposed New DI Pipeline
854 P-458 J-504 255 J-505 254.1 41 100 DI 140 0.01 0.006 0.001 0 21 22 275.8 275.8 Proposed New DI Pipeline
229 P-258 J-132 264.6 J-133 264.6 11 100 DI 140 0.01 0.006 0.002 0 13 13 278 278 Proposed New DI Pipeline
1449 P-676 J-627 259.8 J-798 261.1 99 100 DI 140 0.01 0.006 0.002 0 17 16 276.9 276.9 Proposed New DI Pipeline
877 P-468 J-362 261.2 J-517 261.1 55 100 DI 140 0.01 0.005 0.001 0 20 20 281.4 281.4 Proposed New DI Pipeline
1138 P-555 J-655 258.8 J-656 259.2 53 100 DI 130 0.01 0.005 0.001 0 24 24 283.1 283.1 Existing DI to be retained
851 P-456 J-358 262.8 J-503 262.7 42 100 DI 140 0.01 0.004 0 0 15 15 277.4 277.4 Proposed New DI Pipeline
1589 P-121 J-399 258.8 J-856 258.2 83 100 DI 140 0.01 0.004 0.001 0 17 18 275.9 275.9 Existing UPVC to be Replaced
695 P-49 J-17 258.8 J-207 258.7 34 100 DI 140 0.01 0.004 0.001 0 18 18 276.7 276.7 Existing UPVC to be Replaced
795 P-435 J-470 258.6 J-471 258 51 100 DI 140 0 0.003 0 0 24 25 283.1 283.1 Proposed New DI Pipeline
843 P-452 J-237 250.6 J-499 250.6 40 100 DI 140 0 0.003 0 0 26 26 276.6 276.6 Proposed New DI Pipeline
1004 P-505 J-152 263.7 J-587 263.1 53 100 DI 140 0 0.003 0 0 14 14 277.4 277.4 Proposed New DI Pipeline
1070 P-528 J-15 258 J-623 257.4 54 100 DI 140 0 0.003 0 0 19 20 277.3 277.3 Proposed New DI Pipeline
778 P-429 J-461 261.5 J-138 260.5 37 100 DI 140 0 0.003 0.001 0 20 21 281.2 281.2 Proposed New DI Pipeline
1658 P-773 J-802 260.8 J-880 260.6 92 100 DI 140 0 0.003 0 0 16 16 276.8 276.8 Proposed New DI Pipeline
1277 P-608 J-671 256.1 J-350 257.2 88 100 DI 140 0 0.002 0.001 0 20 19 276.6 276.6 Proposed New DI Pipeline
1271 P-606 J-716 258.3 J-717 257.7 60 100 DI 140 0 0.002 0 0 23 24 281.7 281.7 Proposed New DI Pipeline
1432 P-670 J-345 256.1 J-790 255.2 74 100 DI 140 0 0.002 0 0 20 21 276.2 276.2 Proposed New DI Pipeline
1543 P-721 J-835 263.4 J-836 260.6 81 100 DI 140 0 0.002 0 0 18 21 281.2 281.2 Proposed New DI Pipeline
657 P-385 J-198 259.7 J-393 259 32 100 DI 140 0 0.002 0.001 0 24 25 283.8 283.8 Proposed New DI Pipeline
740 P-414 J-237 250.6 J-422 249.4 36 100 DI 140 0 0.002 0 0 26 27 276.6 276.6 Proposed New DI Pipeline
896 P-474 J-528 257.9 J-529 258.3 60 100 DI 140 0 0.002 0 0 19 18 276.6 276.6 Proposed New DI Pipeline
1394 P-652 J-656 259.2 J-774 258 75 100 DI 140 0 0.002 0 0 24 25 283.1 283.1 Proposed New DI Pipeline
1533 P-716 J-117 258.6 J-831 258.8 77 100 DI 140 0 0.002 0 0 18 18 276.7 276.7 Proposed New DI Pipeline
238 P-260 J-138 260.5 J-139 260.2 12 100 DI 140 0 0.001 0 0 21 21 281.2 281.2 Proposed New DI Pipeline
347 P-288 J-207 258.7 J-208 258.7 17 100 DI 140 0 0.001 0 0 18 18 276.7 276.7 Proposed New DI Pipeline
372 P-296 J-223 259.2 J-224 259.1 18 100 DI 140 0 0.001 0 0 17 18 276.6 276.6 Proposed New DI Pipeline
652 P-383 J-198 259.7 J-390 259.1 35 100 DI 140 0 0.001 0 0 24 25 283.8 283.8 Proposed New DI Pipeline
1749 P-805 J-889 267.2 J-917 269.8 122 100 DI 140 0 0.001 0 0 10 8 277.6 277.6 Proposed New DI Pipeline
2055 P-926 J-121 258.5 J-1003 257.3 525 100 DI 130 0 0.001 0 0 23 24 281.4 281.4 Existing DI to be retained
48 P-219 J-13 260.9 J-14 260.9 3 100 DI 130 0 0 0 0 23 22 283.5 283.5 Existing DI to be retained
1408 P-659 J-780 259.2 J-774 258 76 100 DI 140 0 0 0 0 24 25 283.1 283.1 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

2248 P-1071 J-891 261 J-1040 257.3 280 100 DI 140 0 0 0 0 15 19 276.2 276.2 Existing CI to be Replaced
2207 P-970 J-1027 264.1 J-41 264.1 51 100 DI 130 0 0 0 0 19 19 283.5 283.5 Existing DI to be retained
2043 P-1055 J-81 260.8 J-1001 256.5 392 100 DI 140 0 0 0 0 16 20 277 277 Existing CI to be Replaced
1207 P-583 J-351 257.2 J-686 258.3 58 100 DI 140 0 0 0 0 19 18 276.6 276.6 Proposed New DI Pipeline
535 P-345 J-321 256 J-322 256.3 33 100 DI 140 0 0 0 0 22 22 278.5 278.5 Proposed New DI Pipeline
840 P-451 J-497 255.9 J-498 255.8 44 100 DI 140 0 0 0 0 22 23 278.4 278.4 Proposed New DI Pipeline
398 P-26 J-240 263.3 J-241 263.1 20 100 DI 140 0 0 0 0 14 14 277.5 277.5 Existing UPVC to be Replaced
260 P-266 J-152 263.7 J-153 263.8 13 100 DI 140 0 0 0 0 14 14 277.4 277.4 Proposed New DI Pipeline
423 P-309 J-138 260.5 J-256 259.8 29 100 DI 140 0 0 0 0 21 21 281.2 281.2 Proposed New DI Pipeline
831 P-448 J-491 260.4 J-492 260.5 46 100 DI 140 0 -0.001 0 0 23 23 283.5 283.5 Proposed New DI Pipeline
1160 P-565 J-665 250.8 J-608 250.9 52 100 DI 140 0 -0.001 0 0 24 24 274.6 274.6 Proposed New DI Pipeline
1608 P-749 J-862 259.5 J-519 260.9 86 100 DI 140 0 -0.001 0 0 24 22 283.3 283.3 Proposed New DI Pipeline
1894 P-861 J-965 266.2 J-890 267.3 155 100 DI 140 0 -0.001 0 0 12 11 277.9 277.9 Proposed New DI Pipeline
708 P-403 J-421 249.4 J-422 249.4 34 100 DI 140 0 -0.002 0.001 0 27 27 276.6 276.6 Proposed New DI Pipeline
861 P-461 J-508 264.2 J-371 264.4 41 100 DI 140 0 -0.002 0 0 14 14 278 278 Proposed New DI Pipeline
1248 P-598 J-706 258 J-655 258.8 58 100 DI 140 0 -0.002 0 0 25 24 283.1 283.1 Proposed New DI Pipeline
1387 P-650 J-771 263.7 J-577 264.1 67 100 DI 140 0 -0.002 0 0 15 14 278.4 278.4 Proposed New DI Pipeline
1413 P-662 J-782 258.3 J-489 259.8 69 100 DI 140 0 -0.002 0 0 25 23 282.9 282.9 Proposed New DI Pipeline
1560 P-730 J-843 269.4 J-274 268.5 80 100 DI 140 0 -0.002 0 0 8 9 277.8 277.8 Proposed New DI Pipeline
1814 P-834 J-936 256.9 J-223 259.2 127 100 DI 140 0 -0.002 0 0 20 17 276.6 276.6 Proposed New DI Pipeline
2106 P-940 J-994 249.1 J-359 250 108 100 DI 130 0 -0.002 0 0 25 25 274.6 274.6 Existing DI to be retained
1236 P-592 J-701 268.9 J-273 268.3 57 100 DI 140 0 -0.003 0 0 9 9 277.8 277.8 Proposed New DI Pipeline
1478 P-689 J-810 263.8 J-389 264 72 100 DI 140 0 -0.003 0.001 0 14 14 278.1 278.1 Proposed New DI Pipeline
1501 P-701 J-818 258.6 J-797 259.6 106 100 DI 140 0 -0.003 0 0 18 17 276.7 276.7 Proposed New DI Pipeline
1665 P-777 J-882 257.7 J-728 259.2 107 100 DI 140 0 -0.003 0 0 24 22 281.5 281.5 Proposed New DI Pipeline
350 P-289 J-209 256 J-210 256 17 100 DI 140 0 -0.003 0.001 0 21 21 277.3 277.3 Proposed New DI Pipeline
634 P-377 J-380 256.4 J-210 256 31 100 DI 140 0 -0.003 0.001 0 21 21 277.3 277.3 Proposed New DI Pipeline
809 P-440 J-478 250.9 J-479 251 40 100 DI 140 0 -0.003 0 0 24 24 274.6 274.6 Proposed New DI Pipeline
1360 P-640 J-757 259.9 J-521 261.7 65 100 DI 140 0 -0.003 0 0 21 19 281.2 281.2 Proposed New DI Pipeline
1467 P-685 J-651 260.5 J-100 259.7 72 100 DI 140 0.01 -0.004 0.001 0 16 17 276.7 276.7 Proposed New DI Pipeline
1703 P-789 J-899 265 J-73 266.1 104 100 DI 140 0.01 -0.004 0.001 0 12 11 277.5 277.5 Proposed New DI Pipeline
1840 P-845 J-947 258.2 J-684 255.4 131 100 DI 130 0.01 -0.005 0.001 0 18 21 276 276 Existing DI to be retained
1718 P-793 J-905 264 J-534 266 115 100 DI 140 0.01 -0.005 0.001 0 13 11 277.4 277.4 Proposed New DI Pipeline
826 P-446 J-465 259.5 J-221 259.7 38 100 DI 140 0.01 -0.005 0.001 0 18 18 277.9 277.9 Proposed New DI Pipeline
1419 P-665 J-784 261.1 J-363 261 72 100 DI 140 0.01 -0.005 0.001 0 20 20 281.4 281.4 Proposed New DI Pipeline
1176 P-570 J-351 257.2 J-671 256.1 54 100 DI 140 0.01 -0.005 0.001 0 19 20 276.6 276.6 Proposed New DI Pipeline
738 P-413 J-438 263.2 J-424 263.9 36 100 DI 140 0.01 -0.006 0.002 0 18 17 281.2 281.2 Proposed New DI Pipeline
1405 P-657 J-779 258.5 J-490 259.6 86 100 DI 140 0.01 -0.006 0.002 0 25 23 283.1 283.1 Proposed New DI Pipeline
1566 P-733 J-845 260.7 J-570 260.9 82 100 DI 140 0.01 -0.006 0.001 0 16 16 277 277 Proposed New DI Pipeline
1772 P-819 J-923 260.9 J-728 259.2 157 100 DI 140 0.01 -0.006 0.002 0 20 22 281.5 281.5 Proposed New DI Pipeline
1425 P-666 J-787 249 J-269 251.2 116 100 DI 140 0.01 -0.006 0.002 0 27 25 275.8 275.8 Proposed New DI Pipeline
1114 P-549 J-642 262 J-171 262 65 100 DI 140 0.01 -0.006 0.002 0 15 15 277.5 277.5 Proposed New DI Pipeline
1610 P-750 J-492 260.5 J-84 260.8 89 100 DI 130 0.01 -0.006 0.002 0 23 23 283.5 283.5 Existing DI to be retained
395 P-304 J-238 259.8 J-239 260.1 20 100 DI 140 0.01 -0.006 0.002 0 17 16 276.6 276.6 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

610 P-369 J-366 249 J-367 248.7 31 100 DI 140 0.01 -0.007 0.002 0 26 27 275.3 275.3 Proposed New DI Pipeline
683 P-394 J-407 261.3 J-227 261.6 34 100 DI 140 0.01 -0.007 0.002 0 15 15 276.8 276.8 Proposed New DI Pipeline
1507 P-704 J-820 260.1 J-716 258.3 79 100 DI 140 0.01 -0.007 0.002 0 22 23 281.7 281.7 Proposed New DI Pipeline
1783 P-824 J-927 262.1 J-723 264.1 159 100 DI 140 0.01 -0.007 0.002 0 18 16 279.8 279.8 Proposed New DI Pipeline
357 P-292 J-213 263.8 J-214 263.9 22 100 DI 140 0.01 -0.007 0.002 0 14 13 277.4 277.4 Proposed New DI Pipeline
1146 P-559 J-659 263.8 J-539 265 53 100 DI 140 0.01 -0.007 0.002 0 16 15 280 280 Proposed New DI Pipeline
1349 P-636 J-753 256.9 J-754 256.4 63 100 DI 140 0.01 -0.007 0.002 0 20 20 276.6 276.6 Proposed New DI Pipeline
1556 P-727 J-210 256 J-26 256.8 80 100 DI 140 0.01 -0.008 0.003 0 21 20 277.3 277.3 Proposed New DI Pipeline
1476 P-1021 J-809 255.7 J-25 256.8 72 100 DI 140 0.01 -0.008 0.003 0 22 20 277.3 277.3 Existing CI to be Replaced
1645 P-768 J-874 258.7 J-630 258 142 100 DI 140 0.01 -0.008 0.003 0 18 19 276.9 276.9 Proposed New DI Pipeline
1438 P-673 J-793 253.5 J-30 254.2 70 100 DI 140 0.01 -0.01 0.004 0 22 21 275.4 275.4 Proposed New DI Pipeline
1264 P-603 J-714 263.4 J-514 264.1 64 100 DI 140 0.01 -0.01 0.004 0 15 14 278 278 Proposed New DI Pipeline
2231 P-976 J-1035 257.8 J-777 255.2 196 100 DI 130 0.02 -0.011 0.006 0 18 20 275.5 275.5 Existing DI to be retained
589 P-361 J-353 249.3 J-354 250.8 30 100 DI 140 0.02 -0.011 0.006 0 26 24 275.1 275.1 Proposed New DI Pipeline
1987 P-898 J-671 256.1 J-786 256.5 252 100 DI 140 0.02 -0.012 0.006 0 20 20 276.6 276.6 Proposed New DI Pipeline
1338 P-631 J-749 256.1 J-25 256.8 63 100 DI 140 0.02 -0.012 0.006 0 21 20 277.3 277.3 Proposed New DI Pipeline
618 P-371 J-371 264.4 J-132 264.6 31 100 DI 140 0.02 -0.013 0.007 0 14 13 278 278 Proposed New DI Pipeline
1682 P-136 J-890 267.3 J-732 269 95 100 DI 140 0.02 -0.014 0.008 0 11 9 277.9 277.9 Existing UPVC to be Replaced
1315 P-622 J-738 262.3 J-358 262.8 82 100 DI 140 0.02 -0.014 0.008 0 15 15 277.4 277.4 Proposed New DI Pipeline
1529 P-714 J-829 253.1 J-715 252.1 99 100 DI 130 0.02 -0.015 0.011 0 23 24 275.8 275.8 Existing DI to be retained
1838 P-160 J-946 262.1 J-660 262.1 131 100 DI 140 0.02 -0.016 0.01 0 15 15 276.8 276.8 Existing UPVC to be Replaced
1650 P-771 J-876 259.4 J-66 261.2 92 100 DI 140 0.02 -0.017 0.011 0 23 22 282.9 282.9 Proposed New DI Pipeline
1496 P-699 J-816 256.4 J-675 256.5 82 100 DI 140 0.02 -0.017 0.011 0 21 21 277.3 277.3 Proposed New DI Pipeline
1434 P-671 J-791 250.5 J-360 250 69 100 DI 140 0.03 -0.017 0.012 0 24 25 274.6 274.6 Proposed New DI Pipeline
812 P-441 J-480 261.8 J-481 261.4 39 100 DI 140 0.03 -0.018 0.012 0 21 22 283.1 283.1 Proposed New DI Pipeline
1951 P-883 J-980 256.7 J-48 258.3 196 100 DI 130 0.03 -0.019 0.017 0 21 19 277.3 277.3 Existing DI to be retained
1008 P-507 J-589 255.9 J-497 255.9 46 100 DI 140 0.03 -0.019 0.015 0 22 22 278.4 278.4 Proposed New DI Pipeline
1509 P-115 J-821 265.9 J-64 264.9 75 100 DI 140 0.03 -0.02 0.015 0 12 12 277.4 277.4 Existing UPVC to be Replaced
131 P-231 J-14 260.9 J-68 260.9 5 100 DI 130 0.03 -0.023 0.024 0 22 23 283.5 283.5 Existing DI to be retained
597 P-364 J-358 262.8 J-330 263.1 31 100 DI 140 0.03 -0.023 0.02 0 15 14 277.4 277.4 Proposed New DI Pipeline
510 P-337 J-308 251.7 J-270 251.1 26 100 DI 140 0.04 -0.024 0.022 0 24 25 275.8 275.8 Proposed New DI Pipeline
939 P-1005 J-137 260 J-551 260.5 43 100 DI 140 0.04 -0.026 0.024 0 17 16 276.7 276.7 Existing CI to be Replaced
871 P-465 J-132 264.6 J-514 264.1 41 100 DI 140 0.04 -0.026 0.025 0 13 14 278 278 Proposed New DI Pipeline
1282 P-611 J-350 257.2 J-722 259 60 100 DI 140 0.04 -0.026 0.025 0 19 18 276.6 276.6 Proposed New DI Pipeline
66 P-984 J-25 256.8 J-26 256.8 3 100 DI 140 0.04 -0.027 0.028 0 20 20 277.3 277.3 Existing CI to be Replaced
1992 P-901 J-157 253.9 J-854 250 270 100 DI 130 0.04 -0.03 0.039 0.01 22 26 275.7 275.7 Existing DI to be retained
1623 P-755 J-239 260.1 J-397 260.3 88 100 DI 140 0.05 -0.034 0.042 0 16 16 276.6 276.6 Proposed New DI Pipeline
1595 P-123 J-722 259 J-858 259.3 83 100 DI 140 0.05 -0.037 0.049 0 18 17 276.6 276.6 Existing UPVC to be Replaced
250 P-990 J-26 256.8 J-146 257 12 100 DI 140 0.06 -0.038 0.05 0 20 20 277.3 277.3 Existing CI to be Replaced
1794 P-827 J-675 256.5 J-16 258 128 100 DI 140 0.06 -0.039 0.053 0.01 21 19 277.3 277.3 Proposed New DI Pipeline
1615 P-752 J-514 264.1 J-865 265.3 108 100 DI 140 0.07 -0.044 0.068 0.01 14 13 278 278 Proposed New DI Pipeline
1184 P-574 J-146 257 J-15 258 54 100 DI 130 0.07 -0.044 0.078 0 20 19 277.3 277.3 Existing DI to be retained
1969 P-892 J-212 257 J-70 255 219 100 DI 130 0.07 -0.045 0.081 0.02 19 21 275.9 275.9 Existing DI to be retained
1585 P-741 J-854 250 J-855 249.5 215 100 DI 140 0.07 -0.046 0.072 0.02 26 26 275.7 275.8 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

1671 P-779 J-855 249.5 J-269 251.2 94 100 DI 130 0.07 -0.047 0.086 0.01 26 25 275.8 275.8 Existing DI to be retained
123 P-10 J-63 264.9 J-64 264.9 5 100 DI 140 0.07 -0.05 0.085 0 13 12 277.4 277.4 Existing UPVC to be Replaced
51 P-220 J-15 258 J-16 258 1 100 DI 130 0.07 -0.05 0.094 0 19 19 277.3 277.3 Existing DI to be retained
759 P-422 J-450 250.8 J-451 250.9 36 100 DI 140 0.07 -0.05 0.085 0 24 24 274.6 274.6 Proposed New DI Pipeline
1294 P-93 J-63 264.9 J-214 263.9 60 100 DI 140 0.09 -0.059 0.114 0.01 13 13 277.4 277.4 Existing UPVC to be Replaced
1933 P-1044 J-314 263.6 J-865 265.3 180 100 DI 140 0.09 -0.059 0.116 0.02 14 13 278 278 Existing CI to be Replaced
444 P-314 J-269 251.2 J-270 251.1 24 100 DI 130 0.09 -0.061 0.142 0 25 25 275.8 275.8 Existing DI to be retained
1717 P-141 J-168 261.1 J-825 262.8 103 100 DI 140 0.1 -0.066 0.14 0.01 22 20 282.8 282.8 Existing UPVC to be Replaced
126 P-230 J-65 250.8 J-51 250.8 5 100 DI 140 0.1 -0.066 0.143 0 24 24 274.7 274.7 Proposed New DI Pipeline
1625 P-756 J-858 259.3 J-397 260.3 88 100 DI 140 0.1 -0.067 0.147 0.01 17 16 276.6 276.6 Proposed New DI Pipeline
715 P-50 J-214 263.9 J-425 263.3 35 100 DI 140 0.1 -0.07 0.156 0.01 13 14 277.4 277.4 Existing UPVC to be Replaced
764 P-424 J-453 250.9 J-454 251.2 37 100 DI 130 0.1 -0.07 0.182 0.01 24 24 275.2 275.2 Existing DI to be retained
770 P-426 J-453 250.9 J-454 251.2 37 100 DI 130 0.1 -0.07 0.182 0.01 24 24 275.2 275.2 Existing DI to be retained
1669 P-778 J-496 262.8 J-884 263.6 94 100 DI 140 0.11 -0.071 0.163 0.02 15 14 277.4 277.4 Proposed New DI Pipeline
2107 P-941 J-359 250 J-451 250.9 236 100 DI 130 0.11 -0.077 0.216 0.05 25 24 274.6 274.6 Existing DI to be retained
1961 P-186 J-425 263.3 J-408 261.3 213 100 DI 140 0.11 -0.078 0.193 0.04 14 16 277.4 277.5 Existing UPVC to be Replaced
1797 P-153 J-64 264.9 J-534 266 122 100 DI 140 0.12 -0.081 0.209 0.03 12 11 277.4 277.4 Existing UPVC to be Replaced
1267 P-604 J-270 251.1 J-715 252.1 61 100 DI 130 0.13 -0.091 0.294 0.02 25 24 275.8 275.8 Existing DI to be retained
906 P-56 J-534 266 J-74 266.1 42 100 DI 140 0.14 -0.095 0.279 0.01 11 11 277.4 277.5 Existing UPVC to be Replaced
1870 P-165 J-884 263.6 J-63 264.9 143 100 DI 140 0.14 -0.095 0.28 0.04 14 13 277.4 277.4 Existing UPVC to be Replaced
1930 P-1043 J-466 257 J-69 254.9 180 100 DI 140 0.14 -0.095 0.281 0.05 19 21 275.8 275.9 Existing CI to be Replaced
1816 P-835 J-646 258.6 J-346 256.6 127 100 DI 140 0.14 -0.097 0.289 0.04 18 20 276.3 276.3 Proposed New DI Pipeline
1469 P-686 J-16 258 J-455 259.1 72 100 DI 130 0.14 -0.097 0.332 0.02 19 18 277.3 277.3 Existing DI to be retained
685 P-48 J-408 261.3 J-171 262 34 100 DI 140 0.15 -0.103 0.323 0.01 16 15 277.5 277.5 Existing UPVC to be Replaced
667 P-390 J-397 260.3 J-398 260.6 33 100 DI 140 0.15 -0.103 0.326 0.01 16 16 276.6 276.6 Proposed New DI Pipeline
1447 P-109 J-117 258.6 J-797 259.6 71 100 DI 140 0.16 -0.106 0.339 0.02 18 17 276.7 276.7 Existing UPVC to be Replaced
2054 P-925 J-136 260 J-626 260.9 523 100 DI 130 0.16 -0.107 0.399 0.21 17 16 276.7 276.9 Existing DI to be retained
964 P-494 J-108 254.1 J-565 254.8 46 100 DI 140 0.16 -0.11 0.363 0.02 22 21 275.8 275.8 Proposed New DI Pipeline
337 P-285 J-136 260 J-99 259.8 16 100 DI 130 0.16 -0.11 0.422 0.01 17 17 276.7 276.7 Existing DI to be retained
1638 P-763 J-715 252.1 J-105 253.8 97 100 DI 130 0.16 -0.111 0.426 0.04 24 22 275.8 275.8 Existing DI to be retained
179 P-243 J-99 259.8 J-100 259.7 8 100 DI 140 0.17 -0.112 0.379 0 17 17 276.7 276.7 Proposed New DI Pipeline
291 P-21 J-171 262 J-172 262.4 15 100 DI 140 0.17 -0.116 0.401 0.01 15 15 277.5 277.5 Existing UPVC to be Replaced
2070 P-930 J-100 259.7 J-1005 251.1 706 100 DI 140 0.17 -0.116 0.405 0.29 17 26 276.7 277 Proposed New DI Pipeline
951 P-489 J-455 259.1 J-144 259.5 45 100 DI 130 0.17 -0.117 0.472 0.02 18 18 277.3 277.3 Existing DI to be retained
1835 P-159 J-797 259.6 J-660 262.1 129 100 DI 140 0.18 -0.12 0.426 0.06 17 15 276.7 276.8 Existing UPVC to be Replaced
1990 P-900 J-398 260.6 J-834 261.4 252 100 DI 140 0.18 -0.12 0.427 0.11 16 15 276.6 276.7 Proposed New DI Pipeline
188 P-246 J-105 253.8 J-106 253.8 9 100 DI 130 0.18 -0.123 0.516 0 22 22 275.8 275.8 Existing DI to be retained
1235 P-88 J-172 262.4 J-241 263.1 62 100 DI 140 0.18 -0.125 0.463 0.03 15 14 277.5 277.5 Existing UPVC to be Replaced
1266 P-90 J-106 253.8 J-69 254.9 59 100 DI 140 0.19 -0.128 0.486 0.03 22 21 275.8 275.9 Existing UPVC to be Replaced
1947 P-1046 J-865 265.3 J-887 267.7 190 100 DI 140 0.19 -0.131 0.504 0.1 13 10 278 278.1 Existing CI to be Replaced
2057 P-1056 J-551 260.5 J-81 260.8 539 100 DI 140 0.2 -0.133 0.521 0.28 16 16 276.7 277 Existing CI to be Replaced
2064 P-928 J-1005 251.1 J-496 262.8 659 100 DI 140 0.2 -0.135 0.532 0.35 26 15 277 277.4 Proposed New DI Pipeline
1230 P-87 J-699 261.5 J-570 260.9 56 100 DI 140 0.2 -0.137 0.547 0.03 15 16 276.9 277 Existing UPVC to be Replaced
2022 P-914 J-97 251.5 J-354 250.8 323 100 DI 130 0.21 -0.14 0.654 0.21 23 24 274.9 275.1 Existing DI to be retained
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

2023 P-915 J-97 251.5 J-354 250.8 322 100 DI 130 0.21 -0.14 0.654 0.21 23 24 274.9 275.1 Existing DI to be retained
257 P-265 J-150 256.9 J-151 256.8 13 100 DI 140 0.21 -0.141 0.576 0.01 25 25 281.7 281.7 Proposed New DI Pipeline
1345 P-634 J-354 250.8 J-453 250.9 64 100 DI 130 0.22 -0.147 0.716 0.05 24 24 275.1 275.2 Existing DI to be retained
1344 P-633 J-354 250.8 J-453 250.9 64 100 DI 130 0.22 -0.147 0.716 0.05 24 24 275.1 275.2 Existing DI to be retained
773 P-51 J-151 256.8 J-458 256.7 37 100 DI 140 0.22 -0.147 0.628 0.02 25 25 281.7 281.7 Existing UPVC to be Replaced
1148 P-77 J-660 262.1 J-661 262.2 54 100 DI 140 0.22 -0.148 0.635 0.03 15 15 276.8 276.8 Existing UPVC to be Replaced
974 P-62 J-570 260.9 J-82 260.9 49 100 DI 140 0.22 -0.152 0.669 0.03 16 16 277 277 Existing UPVC to be Replaced
1511 P-705 J-451 250.9 J-822 251 75 100 DI 130 0.23 -0.158 0.816 0.06 24 24 274.6 274.7 Existing DI to be retained
1584 P-740 J-453 250.9 J-367 248.7 83 100 DI 140 0.24 -0.165 0.771 0.06 24 27 275.2 275.3 Proposed New DI Pipeline
1398 P-105 J-458 256.7 J-776 256.9 67 100 DI 140 0.25 -0.17 0.822 0.06 25 25 281.7 281.7 Existing UPVC to be Replaced
1591 P-743 J-212 257 J-399 258.8 83 100 DI 140 0.25 -0.171 0.826 0.07 19 17 275.9 275.9 Proposed New DI Pipeline
1465 P-683 J-626 260.9 J-81 260.8 72 100 DI 130 0.26 -0.176 0.996 0.07 16 16 276.9 277 Existing DI to be retained
2015 P-912 J-367 248.7 J-949 250.2 356 100 DI 140 0.26 -0.179 0.897 0.32 27 25 275.3 275.6 Proposed New DI Pipeline
2010 P-908 J-777 255.2 J-53 256.9 306 100 DI 130 0.28 -0.191 1.164 0.36 20 19 275.5 275.8 Existing DI to be retained
1845 P-848 J-949 250.2 J-157 253.9 136 100 DI 130 0.28 -0.192 1.171 0.16 25 22 275.6 275.7 Existing DI to be retained
1909 P-176 J-661 262.2 J-968 263.2 166 100 DI 140 0.28 -0.192 1.029 0.17 15 14 276.8 277 Existing UPVC to be Replaced
1381 P-647 J-144 259.5 J-612 260.2 66 100 DI 130 0.29 -0.194 1.199 0.08 18 17 277.3 277.4 Existing DI to be retained
191 P-247 J-107 254 J-108 254.1 9 100 DI 130 0.29 -0.195 1.211 0.01 22 22 275.7 275.8 Existing DI to be retained
1884 P-1040 J-73 266.1 J-889 267.2 148 100 DI 140 0.29 -0.199 1.1 0.16 11 10 277.5 277.6 Existing CI to be Replaced
1864 P-855 J-733 269.5 J-888 268.3 169 100 DI 140 0.3 -0.201 1.111 0.19 9 10 278.1 278.3 Proposed New DI Pipeline
2047 P-922 J-776 256.9 J-909 257 430 100 DI 130 0.3 -0.204 1.321 0.57 25 25 281.7 282.3 Existing DI to be retained
355 P-291 J-53 256.9 J-212 257 18 100 DI 130 0.3 -0.205 1.33 0.02 19 19 275.8 275.9 Existing DI to be retained
2200 P-968 J-781 261 J-824 263 147 100 DI 130 0.31 -0.208 1.364 0.2 21 20 282.5 282.7 Existing DI to be retained
1515 P-706 J-824 263 J-825 262.8 78 100 DI 130 0.31 -0.21 1.392 0.11 20 20 282.7 282.8 Existing DI to be retained
133 P-12 J-69 254.9 J-70 255 5 100 DI 140 0.35 -0.237 1.51 0.01 21 21 275.9 275.9 Existing UPVC to be Replaced
1676 P-135 J-887 267.7 J-888 268.3 95 100 DI 140 0.36 -0.247 1.64 0.16 10 10 278.1 278.3 Existing UPVC to be Replaced
1680 P-1025 J-889 267.2 J-273 268.3 96 100 DI 140 0.37 -0.25 1.668 0.16 10 9 277.6 277.8 Existing CI to be Replaced
1777 P-821 J-309 259.5 J-646 258.6 117 100 DI 140 0.37 -0.251 1.684 0.2 17 18 276.1 276.3 Proposed New DI Pipeline
451 P-996 J-273 268.3 J-274 268.5 23 100 DI 140 0.38 -0.255 1.737 0.04 9 9 277.8 277.8 Existing CI to be Replaced
1378 P-1018 J-274 268.5 J-732 269 66 100 DI 140 0.39 -0.262 1.819 0.12 9 9 277.8 277.9 Existing CI to be Replaced
1305 P-1015 J-732 269 J-733 269.5 62 100 DI 140 0.41 -0.278 2.039 0.13 9 9 277.9 278.1 Existing CI to be Replaced
90 P-225 J-41 264.1 J-42 264 4 100 DI 130 0.41 -0.28 2.357 0.01 19 19 283.5 283.5 Existing DI to be retained
2003 P-905 J-825 262.8 J-41 264.1 286 100 DI 130 0.41 -0.28 2.361 0.68 20 19 282.8 283.5 Existing DI to be retained
468 P-32 J-284 260.3 J-19 260.4 24 100 DI 140 0.43 -0.293 2.235 0.05 24 24 283.9 284 Existing UPVC to be Replaced
1340 P-99 J-70 255 J-684 255.4 63 100 DI 140 0.45 -0.303 2.379 0.15 21 21 275.9 276 Existing UPVC to be Replaced
1203 P-84 J-684 255.4 J-345 256.1 75 100 DI 140 0.5 -0.337 2.901 0.22 21 20 276 276.2 Existing UPVC to be Replaced
575 P-40 J-345 256.1 J-346 256.6 29 100 DI 140 0.51 -0.347 3.065 0.09 20 20 276.2 276.3 Existing UPVC to be Replaced
2085 P-935 J-122 258.6 J-282 258.8 12 100 DI 140 0.52 -0.352 3.15 0.04 23 23 281.5 281.6 Proposed New DI Pipeline
650 P-998 J-314 263.6 J-389 264 32 100 DI 140 0.66 -0.446 4.891 0.16 14 14 278 278.1 Existing CI to be Replaced
1955 P-185 J-346 256.6 J-47 258.2 201 100 DI 140 0.67 -0.456 5.081 1.02 20 19 276.3 277.4 Existing UPVC to be Replaced
987 P-1007 J-389 264 J-577 264.1 45 100 DI 140 0.67 -0.457 5.099 0.23 14 14 278.1 278.4 Existing CI to be Replaced
1374 P-1017 J-577 264.1 J-765 263.1 65 100 DI 140 0.68 -0.462 5.214 0.34 14 16 278.4 278.7 Existing CI to be Replaced
1444 P-675 J-81 260.8 J-612 260.2 70 100 DI 130 0.69 -0.468 6.117 0.43 16 17 277 277.4 Existing DI to be retained
1901 P-1041 J-765 263.1 J-823 264.5 163 100 DI 140 0.7 -0.477 5.527 0.9 16 15 278.7 279.6 Existing CI to be Replaced
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

1980 P-190 J-888 268.3 J-823 264.5 241 100 DI 140 0.71 -0.481 5.62 1.36 10 15 278.3 279.6 Existing UPVC to be Replaced
1169 P-80 J-241 263.1 J-313 263.3 53 100 DI 140 0.71 -0.483 5.647 0.3 14 14 277.5 277.8 Existing UPVC to be Replaced
518 P-34 J-313 263.3 J-314 263.6 27 100 DI 140 0.74 -0.505 6.137 0.17 14 14 277.8 278 Existing UPVC to be Replaced
1819 P-837 J-282 258.8 J-781 261 128 100 DI 130 0.77 -0.521 7.466 0.95 23 21 281.6 282.5 Existing DI to be retained
1048 P-521 J-612 260.2 J-221 259.7 47 100 DI 140 0.98 -0.662 10.141 0.48 17 18 277.4 277.9 Existing DI to be Replaced
369 P-295 J-221 259.7 J-222 259.5 18 150 DI 130 0.44 -0.667 1.635 0.03 18 18 277.9 277.9 Existing DI to be retained
937 P-483 J-222 259.5 J-277 258.9 43 150 DI 130 0.44 -0.669 1.648 0.07 18 19 277.9 278 Existing DI to be retained
457 P-318 J-277 258.9 J-278 258.6 23 150 DI 130 0.46 -0.701 1.793 0.04 19 19 278 278 Existing DI to be retained
490 P-328 J-278 258.6 J-297 258.2 25 150 DI 130 0.46 -0.709 1.834 0.05 19 20 278 278.1 Existing DI to be retained
848 P-455 J-501 257.5 J-502 256.4 40 150 DI 130 0.47 -0.723 1.9 0.08 21 22 278.2 278.2 Existing DI to be retained
876 P-467 J-297 258.2 J-501 257.5 41 150 DI 130 0.47 -0.723 1.9 0.08 20 21 278.1 278.2 Existing DI to be retained
1594 P-744 J-502 256.4 J-290 256.5 83 150 DI 130 0.47 -0.723 1.901 0.16 22 22 278.2 278.4 Existing DI to be retained
478 P-323 J-290 256.5 J-291 256.4 24 150 DI 140 0.49 -0.745 1.752 0.04 22 22 278.4 278.4 Proposed New DI Pipeline
1513 P-116 J-823 264.5 J-723 264.1 81 150 DI 140 0.65 -0.992 2.979 0.24 15 16 279.6 279.8 Existing UPVC to be Replaced
1284 P-92 J-723 264.1 J-539 265 63 150 DI 140 0.67 -1.023 3.151 0.2 16 15 279.8 280 Existing UPVC to be Replaced
915 P-58 J-539 265 J-540 265.3 43 150 DI 140 0.68 -1.039 3.246 0.14 15 15 280 280.2 Existing UPVC to be Replaced
1882 P-169 J-540 265.3 J-799 263.1 183 150 DI 140 0.69 -1.061 3.37 0.62 15 18 280.2 280.8 Existing UPVC to be Replaced
1730 P-145 J-799 263.1 J-545 261 106 150 DI 140 0.73 -1.116 3.704 0.39 18 20 280.8 281.2 Existing UPVC to be Replaced
1999 P-904 J-281 258.5 J-489 259.8 272 150 DI 140 0.85 -1.298 4.896 1.33 23 23 281.6 282.9 Existing DI to be Replaced
828 P-447 J-489 259.8 J-490 259.6 40 150 DI 140 0.86 -1.311 4.991 0.2 23 23 282.9 283.1 Existing DI to be Replaced
1229 P-589 J-490 259.6 J-653 259.8 56 150 DI 140 0.86 -1.32 5.05 0.28 23 24 283.1 283.4 Existing DI to be Replaced
1134 P-554 J-653 259.8 J-187 260 51 150 DI 140 0.87 -1.333 5.148 0.26 24 24 283.4 283.7 Existing DI to be Replaced
315 P-280 J-187 260 J-45 260 16 150 DI 140 0.89 -1.352 5.284 0.08 24 24 283.7 283.8 Existing DI to be Replaced
96 P-8 J-45 260 J-46 260 4 150 DI 140 0.89 -1.353 5.291 0.02 24 24 283.8 283.8 Existing UPVC to be Replaced
270 P-18 J-46 260 J-158 260.1 13 150 DI 140 0.89 -1.361 5.35 0.07 24 24 283.8 283.8 Existing UPVC to be Replaced
566 P-355 J-291 256.4 J-322 256.3 29 200 DI 140 0.65 -1.767 2.136 0.06 22 22 278.4 278.5 Existing DI to be Replaced
2030 P-918 J-322 256.3 J-121 258.5 338 150 DI 140 1.16 -1.767 8.674 2.93 22 23 278.5 281.4 Existing DI to be Replaced
212 P-253 J-121 258.5 J-122 258.6 11 150 DI 140 1.16 -1.769 8.689 0.09 23 23 281.4 281.5 Existing DI to be Replaced
1302 P-96 J-158 260.1 J-20 260.4 64 200 DI 140 0.65 -1.775 2.153 0.14 24 24 283.8 284 Existing UPVC to be Replaced
HYDRAULIC MODEL INVENTORY (Junction) OF DMA-3 (Rairangpur)

Demand Hydraulic Pressure (m


ID Label Elevation (m)
(ML/day) Grade (m) H2O)

49 J-13 260.9 0 283.5 23


50 J-14 260.9 0.007 283.5 22
52 J-15 258 0.003 277.3 19
53 J-16 258 0.008 277.3 19
55 J-17 258.8 0.003 276.7 18
58 J-19 260.4 0.008 284 24
59 J-20 260.4 0 284 24
67 J-25 256.8 0.006 277.3 20
68 J-26 256.8 0.003 277.3 20
73 J-29 254.2 0.009 275.4 21
74 J-30 254.2 0.005 275.4 21
85 J-37 264.1 0.016 283.5 19
91 J-41 264.1 0 283.5 19
92 J-42 264 0.012 283.5 19
97 J-45 260 0.001 283.8 24
98 J-46 260 0 283.8 24
100 J-47 258.2 0.019 277.4 19
101 J-48 258.3 0.003 277.3 19
106 J-51 250.8 0 274.7 24
107 J-52 250.8 0.001 274.7 24
109 J-53 256.9 0.014 275.8 19
110 J-54 256.8 0.013 275.8 19
124 J-63 264.9 0.013 277.4 13
125 J-64 264.9 0.012 277.4 12
127 J-65 250.8 0 274.7 24
129 J-66 261.2 0.004 282.9 22
130 J-67 261.2 0.009 282.8 22
132 J-68 260.9 0.003 283.5 23
134 J-69 254.9 0.013 275.9 21
135 J-70 255 0.02 275.9 21
140 J-73 266.1 0.007 277.5 11
141 J-74 266.1 0.003 277.5 11
152 J-81 260.8 0 277 16
153 J-82 260.9 0.006 277 16
157 J-84 260.8 0.012 283.5 23
177 J-97 251.5 0.01 274.9 23
178 J-98 251.5 0 274.9 23
180 J-99 259.8 0.002 276.7 17
181 J-100 259.7 0 276.7 17
189 J-105 253.8 0.005 275.8 22
190 J-106 253.8 0.005 275.8 22
192 J-107 254 0.001 275.7 22
193 J-108 254.1 0.006 275.8 22
207 J-117 258.6 0.001 276.7 18
208 J-118 258.5 0.008 276.7 18
213 J-121 258.5 0.001 281.4 23
Demand Hydraulic Pressure (m
ID Label Elevation (m)
(ML/day) Grade (m) H2O)

214 J-122 258.6 0.001 281.5 23


230 J-132 264.6 0.007 278 13
231 J-133 264.6 0.006 278 13
236 J-136 260 0.001 276.7 17
237 J-137 260 0.005 276.7 17
239 J-138 260.5 0.002 281.2 21
240 J-139 260.2 0.001 281.2 21
248 J-144 259.5 0.007 277.3 18
249 J-145 259.4 0.009 277.3 18
251 J-146 257 0.006 277.3 20
258 J-150 256.9 0.011 281.7 25
259 J-151 256.8 0.006 281.7 25
261 J-152 263.7 0.005 277.4 14
262 J-153 263.8 0 277.4 14
264 J-154 257 0.006 281.8 25
265 J-155 257 0.01 281.7 25
269 J-157 253.9 0.015 275.7 22
271 J-158 260.1 0.001 283.8 24
287 J-168 261.1 0.003 282.8 22
292 J-171 262 0.006 277.5 15
293 J-172 262.4 0.001 277.5 15
301 J-177 260.6 0.001 283.6 23
302 J-178 260.6 0.006 283.5 23
316 J-187 260 0.011 283.7 24
318 J-188 249.9 0.002 274.6 25
319 J-189 249.9 0.001 274.6 25
333 J-198 259.7 0.006 283.8 24
348 J-207 258.7 0.003 276.7 18
349 J-208 258.7 0.001 276.7 18
351 J-209 256 0.003 277.3 21
352 J-210 256 0.003 277.3 21
356 J-212 257 0.011 275.9 19
358 J-213 263.8 0.007 277.4 14
359 J-214 263.9 0.004 277.4 13
370 J-221 259.7 0 277.9 18
371 J-222 259.5 0.003 277.9 18
373 J-223 259.2 0.006 276.6 17
374 J-224 259.1 0.001 276.6 18
378 J-226 261.6 0.008 276.8 15
379 J-227 261.6 0.012 276.8 15
393 J-236 250.6 0.013 276.6 26
394 J-237 250.6 0.004 276.6 26
396 J-238 259.8 0.006 276.6 17
397 J-239 260.1 0.018 276.6 16
399 J-240 263.3 0 277.5 14
400 J-241 263.1 0 277.5 14
402 J-242 256.4 0.021 275.8 19
Demand Hydraulic Pressure (m
ID Label Elevation (m)
(ML/day) Grade (m) H2O)

424 J-256 259.8 0 281.2 21


445 J-269 251.2 0.008 275.8 25
446 J-270 251.1 0.006 275.8 25
452 J-273 268.3 0.003 277.8 9
453 J-274 268.5 0.005 277.8 9
458 J-277 258.9 0.002 278 19
459 J-278 258.6 0 278 19
464 J-281 258.5 0.009 281.6 23
465 J-282 258.8 0.02 281.6 23
467 J-283 259.3 0.011 277.3 18
469 J-284 260.3 0.001 283.9 24
479 J-290 256.5 0 278.4 22
480 J-291 256.4 0 278.4 22
491 J-297 258.2 0.003 278.1 20
511 J-308 251.7 0.024 275.8 24
513 J-309 259.5 0.023 276.1 17
514 J-310 259.1 0.016 276 17
519 J-313 263.3 0 277.8 14
520 J-314 263.6 0.001 278 14
536 J-321 256 0 278.5 22
537 J-322 256.3 0 278.5 22
550 J-330 263.1 0 277.4 14
576 J-345 256.1 0.008 276.2 20
577 J-346 256.6 0.012 276.3 20
585 J-350 257.2 0.016 276.6 19
586 J-351 257.2 0.011 276.6 19
590 J-353 249.3 0.011 275.1 26
591 J-354 250.8 0.003 275.1 24
598 J-358 262.8 0.006 277.4 15
600 J-359 250 0.017 274.6 25
601 J-360 250 0.018 274.6 25
605 J-362 261.2 0.007 281.4 20
606 J-363 261 0.005 281.4 20
611 J-366 249 0.007 275.3 26
612 J-367 248.7 0.007 275.3 27
617 J-370 259.1 0.033 277.3 18
619 J-371 264.4 0.011 278 14
635 J-380 256.4 0.003 277.3 21
649 J-388 262 0.002 282.7 21
651 J-389 264 0.007 278.1 14
653 J-390 259.1 0.001 283.8 25
658 J-393 259 0.002 283.8 25
668 J-397 260.3 0.002 276.6 16
669 J-398 260.6 0.005 276.6 16
671 J-399 258.8 0.036 275.9 17
684 J-407 261.3 0.007 276.8 15
686 J-408 261.3 0.013 277.5 16
Demand Hydraulic Pressure (m
ID Label Elevation (m)
(ML/day) Grade (m) H2O)

709 J-421 249.4 0.002 276.6 27


710 J-422 249.4 0 276.6 27
713 J-423 263.2 0.004 281.2 18
714 J-424 263.9 0.016 281.2 17
716 J-425 263.3 0.001 277.4 14
724 J-430 258.9 0.008 277.3 18
732 J-434 262.4 0.009 281.2 19
739 J-438 263.2 0.006 281.2 18
760 J-450 250.8 0.05 274.6 24
761 J-451 250.9 0.03 274.6 24
765 J-453 250.9 0.011 275.2 24
766 J-454 251.2 0.013 275.2 24
768 J-455 259.1 0.012 277.3 18
769 J-456 258.6 0.008 277.3 19
774 J-458 256.7 0.004 281.7 25
779 J-461 261.5 0.008 281.2 20
788 J-465 259.5 0.005 277.9 18
790 J-466 257 0.018 275.8 19
791 J-467 255.9 0.018 275.8 20
796 J-470 258.6 0.017 283.1 24
797 J-471 258 0.003 283.1 25
810 J-478 250.9 0.003 274.6 24
811 J-479 251 0.004 274.6 24
813 J-480 261.8 0.018 283.1 21
814 J-481 261.4 0.006 283.1 22
829 J-489 259.8 0.012 282.9 23
830 J-490 259.6 0.003 283.1 23
832 J-491 260.4 0.001 283.5 23
833 J-492 260.5 0.006 283.5 23
838 J-495 263.2 0.016 277.4 14
839 J-496 262.8 0.005 277.4 15
841 J-497 255.9 0.003 278.4 22
842 J-498 255.8 0 278.4 23
844 J-499 250.6 0.003 276.6 26
849 J-501 257.5 0 278.2 21
850 J-502 256.4 0 278.2 22
852 J-503 262.7 0.004 277.4 15
855 J-504 255 0.037 275.8 21
856 J-505 254.1 0.006 275.8 22
858 J-506 258.1 0.008 278 20
862 J-508 264.2 0.002 278 14
872 J-514 264.1 0.008 278 14
878 J-517 261.1 0.005 281.4 20
882 J-519 260.9 0.005 283.3 22
883 J-520 259 0.068 283.3 24
885 J-521 261.7 0.002 281.2 19
897 J-528 257.9 0.015 276.6 19
Demand Hydraulic Pressure (m
ID Label Elevation (m)
(ML/day) Grade (m) H2O)

898 J-529 258.3 0.002 276.6 18


907 J-534 266 0.009 277.4 11
916 J-539 265 0.009 280 15
917 J-540 265.3 0.021 280.2 15
919 J-541 258.3 0.009 281.7 23
920 J-542 259.3 0.02 281.7 22
925 J-545 261 0.015 281.2 20
940 J-551 260.5 0.033 276.7 16
965 J-565 254.8 0.014 275.8 21
975 J-570 260.9 0.01 277 16
988 J-577 264.1 0.004 278.4 14
1005 J-587 263.1 0.003 277.4 14
1009 J-589 255.9 0.019 278.4 22
1042 J-608 250.9 0 274.6 24
1049 J-612 260.2 0 277.4 17
1069 J-622 256.9 0.006 276.6 20
1071 J-623 257.4 0.003 277.3 20
1078 J-626 260.9 0.01 276.9 16
1079 J-627 259.8 0.015 276.9 17
1087 J-630 258 0.019 276.9 19
1115 J-642 262 0.006 277.5 15
1123 J-646 258.6 0.019 276.3 18
1124 J-647 258.2 0.028 276.3 18
1132 J-651 260.5 0.023 276.7 16
1133 J-652 259.8 0.008 276.7 17
1135 J-653 259.8 0.006 283.4 24
1139 J-655 258.8 0 283.1 24
1140 J-656 259.2 0.003 283.1 24
1147 J-659 263.8 0.007 280 16
1149 J-660 262.1 0.013 276.8 15
1150 J-661 262.2 0.021 276.8 15
1161 J-665 250.8 0.001 274.6 24
1175 J-670 253.8 0.018 275.7 22
1177 J-671 256.1 0.005 276.6 20
1186 J-675 256.5 0.016 277.3 21
1187 J-676 255.8 0.006 277.3 21
1191 J-678 259.4 0.022 283.1 24
1204 J-684 255.4 0.03 276 21
1208 J-686 258.3 0 276.6 18
1210 J-687 257 0.007 281.8 25
1223 J-695 258.2 0.007 283.4 25
1225 J-696 251.1 (N/A) (N/A) (N/A)
1226 J-697 251.4 0.002 274.9 23
1231 J-699 261.5 0.003 276.9 15
1237 J-701 268.9 0.003 277.8 9
1249 J-706 258 0.002 283.1 25
1262 J-713 258.7 0.007 283.7 25
Demand Hydraulic Pressure (m
ID Label Elevation (m)
(ML/day) Grade (m) H2O)

1265 J-714 263.4 0.01 278 15


1268 J-715 252.1 0.005 275.8 24
1272 J-716 258.3 0.005 281.7 23
1273 J-717 257.7 0.002 281.7 24
1283 J-722 259 0.011 276.6 18
1285 J-723 264.1 0.023 279.8 16
1297 J-728 259.2 0.017 281.5 22
1304 J-731 262.8 0.008 277.5 15
1306 J-732 269 0.003 277.9 9
1307 J-733 269.5 0.015 278.1 9
1316 J-738 262.3 0.014 277.4 15
1337 J-748 250 0.022 274.6 25
1339 J-749 256.1 0.012 277.3 21
1350 J-753 256.9 0.007 276.6 20
1351 J-754 256.4 0.006 276.6 20
1361 J-757 259.9 0.003 281.2 21
1370 J-762 259.1 0.014 276.7 18
1371 J-763 257.5 0.015 276.6 19
1375 J-765 263.1 0.004 278.7 16
1380 J-767 258.7 0.03 278 19
1385 J-769 259.7 0.097 281.3 22
1386 J-770 258.5 0.006 281.3 23
1388 J-771 263.7 0.002 278.4 15
1395 J-774 258 0.002 283.1 25
1399 J-776 256.9 0.005 281.7 25
1401 J-777 255.2 0.004 275.5 20
1406 J-779 258.5 0.006 283.1 25
1409 J-780 259.2 0 283.1 24
1411 J-781 261 0.022 282.5 21
1414 J-782 258.3 0.002 282.9 25
1420 J-784 261.1 0.005 281.4 20
1424 J-786 256.5 0 276.6 20
1426 J-787 249 0.006 275.8 27
1428 J-788 256.9 0.011 278.1 21
1433 J-790 255.2 0.002 276.2 21
1435 J-791 250.5 0.017 274.6 24
1439 J-793 253.5 0.01 275.4 22
1448 J-797 259.6 0.011 276.7 17
1450 J-798 261.1 0.006 276.9 16
1452 J-799 263.1 0.044 280.8 18
1453 J-800 261.7 0.011 280.8 19
1458 J-802 260.8 0.02 276.8 16
1477 J-809 255.7 0.008 277.3 22
1479 J-810 263.8 0.003 278.1 14
1497 J-816 256.4 0.017 277.3 21
1499 J-817 260.3 0.007 277.3 17
1502 J-818 258.6 0.003 276.7 18
Demand Hydraulic Pressure (m
ID Label Elevation (m)
(ML/day) Grade (m) H2O)

1508 J-820 260.1 0.007 281.7 22


1510 J-821 265.9 0.027 277.4 12
1512 J-822 251 0.006 274.7 24
1514 J-823 264.5 0.034 279.6 15
1516 J-824 263 0.002 282.7 20
1517 J-825 262.8 0.004 282.8 20
1522 J-827 257.1 0.019 281.7 25
1530 J-829 253.1 0.015 275.8 23
1534 J-831 258.8 0.002 276.7 18
1536 J-832 257.7 0.163 276.6 19
1542 J-834 261.4 0.034 276.7 15
1544 J-835 263.4 0.006 281.2 18
1545 J-836 260.6 0.002 281.2 21
1561 J-843 269.4 0.002 277.8 8
1567 J-845 260.7 0.006 277 16
1586 J-854 250 0.015 275.7 26
1587 J-855 249.5 0.001 275.8 26
1590 J-856 258.2 0.004 275.9 18
1596 J-858 259.3 0.005 276.6 17
1609 J-862 259.5 0.001 283.3 24
1616 J-865 265.3 0.027 278 13
1629 J-869 250.1 0.009 274.6 25
1646 J-874 258.7 0.008 276.9 18
1648 J-875 264 0.011 278.7 15
1651 J-876 259.4 0.017 282.9 23
1656 J-878 262.3 0.002 281.3 19
1657 J-879 262.5 0.022 281.3 19
1659 J-880 260.6 0.003 276.8 16
1661 J-881 252.2 0.007 275.8 24
1666 J-882 257.7 0.003 281.5 24
1670 J-884 263.6 0.024 277.4 14
1675 J-886 250 0.017 274.6 25
1677 J-887 267.7 0.024 278.1 10
1678 J-888 268.3 0.033 278.3 10
1681 J-889 267.2 0.049 277.6 10
1683 J-890 267.3 0.013 277.9 11
1686 J-891 261 0.009 276.2 15
1690 J-893 259.4 0.009 282.7 23
1704 J-899 265 0.004 277.5 12
1719 J-905 264 0.005 277.4 13
1732 J-909 257 0.024 282.3 25
1745 J-915 262.5 0.012 277.5 15
1750 J-917 269.8 0.001 277.6 8
1773 J-923 260.9 0.006 281.5 20
1784 J-927 262.1 0.007 279.8 18
1790 J-929 254.3 0.025 276.6 22
1792 J-930 263.1 0.024 283.5 20
Demand Hydraulic Pressure (m
ID Label Elevation (m)
(ML/day) Grade (m) H2O)

1813 J-935 257.9 0.01 276.9 19


1815 J-936 256.9 0.002 276.6 20
1826 J-940 259.7 0.011 276.6 17
1837 J-945 260.4 0.084 276.5 16
1839 J-946 262.1 0.016 276.8 15
1841 J-947 258.2 0.005 276 18
1846 J-949 250.2 0.013 275.6 25
1895 J-965 266.2 0.001 277.9 12
1903 J-968 263.2 0.067 277 14
1932 J-974 250.4 0.001 274.6 24
1952 J-980 256.7 0.019 277.3 21
1989 J-987 264.7 0.022 277.8 13
2025 J-994 249.1 0.002 274.6 25
2032 J-997 248.2 0.065 274.6 26
2044 J-1001 256.5 0 277 20
2056 J-1003 257.3 0.001 281.4 24
2061 J-1005 251.1 0 277 26
2062 J-1006 258.4 0 277 19
2069 J-1008 258 0.145 276.3 18
2081 J-1013 268 0.018 277 9
2205 J-1027 264.1 0 283.5 19
2214 J-1030 261.4 0.001 281.3 20
2229 J-1035 257.8 0.011 275.5 18
2247 J-1040 257.3 0 276.2 19
HYDRAULIC MODEL INVENTORY (Pipe) OF DMA-4 (Rairangpur)
Elevation Stop Elevation Length Diameter Hazen- Velocity Flow Headloss Headloss Pressure Pressure Hydraulic Hydraulic
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

2258 P-213 R-4 (ZONE-4) 260.2 J-369 260.2 33 300 DI 140 0.59 3.618 1.117 0.04 0 24 284.2 284.2 Proposed New DI Pipeline
1779 P-149 J-368 260.9 J-925 262 117 300 DI 140 0.58 3.571 1.091 0.13 23 22 284.1 284 Existing UPVC to be Replaced
1915 P-179 J-925 262 J-679 263.2 164 250 DI 140 0.77 3.279 2.263 0.37 22 20 284 283.6 Existing UPVC to be Replaced
102 P-986 J-49 258.8 J-50 258.8 5 200 DI 140 0.66 1.802 2.215 0.01 23 23 282.1 282.1 Existing CI to be Replaced
1977 P-895 J-203 255.2 J-392 253 384 150 DI 130 0.83 1.262 5.332 2.05 23 23 277.8 275.7 Existing DI to be retained
1800 P-154 J-620 253.3 J-814 251.7 133 150 DI 140 0.72 1.094 3.571 0.48 22 23 274.9 274.5 Existing UPVC to be Replaced
1488 P-694 J-814 251.7 J-640 251.4 242 150 DI 140 0.7 1.076 3.46 0.84 23 22 274.5 273.6 Proposed New DI Pipeline
1775 P-1030 J-640 251.4 J-924 253.1 118 150 DI 140 0.68 1.035 3.222 0.38 22 20 273.6 273.2 Existing CI to be Replaced
1192 P-82 J-679 263.2 J-586 263.7 55 150 DI 140 0.62 0.946 2.728 0.15 20 20 283.6 283.5 Existing UPVC to be Replaced
1964 P-1048 J-924 253.1 J-23 254.2 217 100 DI 140 0.72 0.486 5.727 1.24 20 18 273.2 272 Existing CI to be Replaced
1862 P-853 J-618 258.3 J-175 258.4 139 100 DI 130 0.64 0.433 5.29 0.74 24 23 282 281.3 Existing DI to be retained
297 P-275 J-175 258.4 J-176 258.2 15 100 DI 130 0.6 0.41 4.798 0.07 23 23 281.3 281.2 Existing DI to be retained
1167 P-1011 J-593 250.7 J-668 251 52 100 DI 140 0.58 0.393 3.866 0.2 20 20 271.1 270.9 Existing CI to be Replaced
2094 P-936 J-23 254.2 J-110 253.2 59 100 DI 130 0.57 0.388 4.327 0.25 18 19 272 271.7 Existing DI to be retained
672 P-391 J-400 259.1 J-401 259.1 34 100 DI 140 0.56 0.382 3.67 0.12 23 23 282.2 282.1 Proposed New DI Pipeline
1292 P-615 J-401 259.1 J-727 258.7 68 100 DI 140 0.55 0.371 3.467 0.23 23 23 282.1 281.8 Proposed New DI Pipeline
1483 P-1022 J-469 259.1 J-342 260.3 73 100 DI 140 0.51 0.348 3.087 0.22 15 14 274.5 274.3 Existing CI to be Replaced
2111 P-942 J-392 253 J-1014 253 139 100 DI 140 0.49 0.335 2.875 0.4 23 22 275.7 275.3 Proposed New DI Pipeline
2095 P-937 J-110 253.2 J-87 252 184 100 DI 130 0.48 0.327 3.156 0.58 19 19 271.7 271.2 Existing DI to be retained
1324 P-1016 J-342 260.3 J-741 261.5 62 100 DI 140 0.47 0.319 2.619 0.16 14 13 274.3 274.1 Existing CI to be Replaced
2112 P-943 J-1014 253 J-252 253 3 100 DI 140 0.44 0.302 2.365 0.01 22 22 275.3 275.3 Proposed New DI Pipeline
164 P-239 J-87 252 J-88 252 7 100 DI 130 0.44 0.298 2.647 0.02 19 19 271.2 271.1 Existing DI to be retained
1145 P-558 J-88 252 J-165 251.9 53 100 DI 130 0.43 0.294 2.586 0.14 19 19 271.1 271 Existing DI to be retained
1158 P-563 J-581 259.2 J-328 259.9 52 100 DI 130 0.43 0.293 2.565 0.13 22 21 281 280.9 Existing DI to be retained
2088 P-1060 J-252 253 J-750 253.4 69 100 DI 140 0.4 0.27 1.933 0.13 22 22 275.3 275.2 Existing CI to be Replaced
1847 P-1035 J-194 256.4 J-468 258.4 134 100 DI 140 0.39 0.266 1.871 0.25 18 16 274.8 274.5 Existing CI to be Replaced
1795 P-152 J-925 262 J-931 261.8 121 100 DI 140 0.37 0.253 1.706 0.21 22 22 284 283.8 Existing UPVC to be Replaced
1298 P-95 J-579 256.2 J-729 255.2 61 100 DI 140 0.37 0.252 1.693 0.1 12 13 268.4 268.3 Existing UPVC to be Replaced
1858 P-163 J-729 255.2 J-192 253.8 137 100 DI 140 0.37 0.249 1.66 0.23 13 14 268.3 268 Existing UPVC to be Replaced
1861 P-1037 J-164 252 J-912 251.4 152 100 DI 140 0.36 0.244 1.601 0.24 19 19 271 270.7 Existing CI to be Replaced
418 P-28 J-194 256.4 J-253 256.6 22 100 DI 140 0.36 0.244 1.595 0.03 18 18 274.8 274.8 Existing UPVC to be Replaced
1581 P-120 J-253 256.6 J-477 258.8 88 100 DI 140 0.36 0.241 1.562 0.14 18 16 274.8 274.6 Existing UPVC to be Replaced
938 P-484 J-176 258.2 J-355 258.4 43 100 DI 130 0.34 0.233 1.684 0.07 23 23 281.2 281.1 Existing DI to be retained
1788 P-1031 J-741 261.5 J-435 263 119 100 DI 140 0.33 0.226 1.387 0.17 13 11 274.1 273.9 Existing CI to be Replaced
1934 P-877 J-328 259.9 J-667 261 183 100 DI 130 0.33 0.225 1.581 0.29 21 20 280.9 280.6 Existing DI to be retained
1098 P-72 J-477 258.8 J-636 259.8 50 100 DI 140 0.32 0.217 1.287 0.06 16 15 274.6 274.6 Existing UPVC to be Replaced
792 P-1002 J-468 258.4 J-469 259.1 38 100 DI 140 0.32 0.216 1.273 0.05 16 15 274.5 274.5 Existing CI to be Replaced
1752 P-147 J-585 263.3 J-680 261.8 145 100 DI 140 0.31 0.213 1.242 0.18 20 21 283.3 283.1 Existing UPVC to be Replaced
725 P-408 J-355 258.4 J-431 258.6 35 100 DI 130 0.31 0.213 1.422 0.05 23 22 281.1 281.1 Existing DI to be retained
1941 P-184 J-931 261.8 J-586 263.7 265 100 DI 140 0.31 0.208 1.185 0.31 22 20 283.8 283.5 Existing UPVC to be Replaced
1737 P-1028 J-912 251.4 J-1 251 112 100 DI 140 0.27 0.186 0.969 0.11 19 20 270.7 270.6 Existing CI to be Replaced
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

200 P-250 J-113 262.2 J-114 262.3 9 100 DI 130 0.27 0.184 1.084 0.01 12 12 273.9 273.8 Existing DI to be retained
994 P-502 J-431 258.6 J-581 259.2 45 100 DI 130 0.27 0.182 1.067 0.05 22 22 281.1 281 Existing DI to be retained
2008 P-1053 J-668 251 J-785 251 302 100 DI 140 0.25 0.166 0.787 0.24 20 20 270.9 270.7 Existing CI to be Replaced
1883 P-170 J-176 258.2 J-746 255.3 170 100 DI 140 0.24 0.166 0.784 0.13 23 26 281.2 281.1 Existing UPVC to be Replaced
1421 P-1019 J-785 251 J-550 251.1 69 100 DI 140 0.24 0.162 0.744 0.05 20 19 270.7 270.6 Existing CI to be Replaced
1334 P-629 J-667 261 J-747 261 63 100 DI 130 0.23 0.159 0.827 0.05 20 19 280.6 280.5 Existing DI to be retained
1805 P-831 J-747 261 J-933 260.2 123 100 DI 130 0.23 0.153 0.775 0.1 19 20 280.5 280.5 Existing DI to be retained
2104 P-938 J-1011 251 J-975 251 260 100 DI 130 0.21 0.145 0.703 0.18 20 20 270.9 270.7 Existing DI to be retained
323 P-23 J-192 253.8 J-193 253.5 16 100 DI 140 0.21 0.142 0.585 0.01 14 15 268 268 Existing UPVC to be Replaced
30 P-983 J-1 251 J-2 251 1 100 DI 140 0.2 0.135 0.533 0 20 20 270.6 270.6 Existing CI to be Replaced
935 P-1004 J-2 251 J-550 251.1 43 100 DI 140 0.19 0.132 0.514 0.02 20 19 270.6 270.6 Existing CI to be Replaced
733 P-1001 J-435 263 J-436 263 35 100 DI 140 0.19 0.129 0.488 0.02 11 11 273.9 273.9 Existing CI to be Replaced
706 P-402 J-193 253.5 J-420 252.8 34 100 DI 130 0.18 0.122 0.508 0.02 15 15 268 268 Existing DI to be retained
2105 P-939 J-975 251 J-583 255 552 100 DI 130 0.17 0.113 0.443 0.24 20 15 270.7 270.5 Existing DI to be retained
998 P-504 J-583 255 J-584 255 46 100 DI 130 0.16 0.111 0.423 0.02 15 15 270.5 270.4 Existing DI to be retained
63 P-5 J-23 254.2 J-24 254.2 2 100 DI 140 0.14 0.094 0.282 0 18 18 272 272 Existing UPVC to be Replaced
1445 P-1020 J-114 262.3 J-543 262.5 71 100 DI 140 0.14 0.093 0.265 0.02 12 11 273.8 273.8 Existing CI to be Replaced
1354 P-101 J-114 262.3 J-447 263.1 64 100 DI 140 0.12 0.084 0.221 0.01 12 11 273.8 273.8 Existing UPVC to be Replaced
1809 P-155 J-24 254.2 J-911 255 126 100 DI 140 0.12 0.081 0.209 0.03 18 17 272 272 Existing UPVC to be Replaced
1698 P-787 J-584 255 J-218 255 105 100 DI 140 0.12 0.081 0.207 0.02 15 15 270.4 270.4 Proposed New DI Pipeline
1621 P-754 J-867 256.2 J-383 255.6 88 100 DI 130 0.12 0.08 0.23 0.02 23 24 279.3 279.3 Existing DI to be retained
1319 P-624 J-435 263 J-597 261.8 62 100 DI 130 0.11 0.075 0.206 0.01 11 12 273.9 273.9 Existing DI to be retained
1763 P-812 J-741 261.5 J-536 262.6 117 100 DI 130 0.11 0.074 0.201 0.02 13 11 274.1 274.1 Existing DI to be retained
1725 P-796 J-78 262.2 J-907 261 105 100 DI 130 0.1 0.071 0.185 0.02 12 13 273.9 273.9 Existing DI to be retained
389 P-302 J-234 259.6 J-235 259.4 20 100 DI 130 0.1 0.071 0.185 0 14 15 273.9 273.9 Existing DI to be retained
1170 P-1012 J-436 263 J-124 263.1 53 100 DI 140 0.1 0.068 0.149 0.01 11 11 273.9 273.9 Existing CI to be Replaced
1917 P-868 J-383 255.6 J-437 254.1 164 100 DI 130 0.1 0.065 0.157 0.03 24 25 279.3 279.3 Existing DI to be retained
1741 P-1029 J-406 264.3 J-31 264 112 100 DI 140 0.09 0.064 0.135 0.02 16 16 280.1 280.1 Existing CI to be Replaced
217 P-255 J-124 263.1 J-125 263 10 100 DI 140 0.09 0.064 0.134 0 11 11 273.9 273.9 Proposed New DI Pipeline
910 P-478 J-536 262.6 J-473 263.1 43 100 DI 130 0.09 0.064 0.153 0.01 11 11 274.1 274.1 Existing DI to be retained
1171 P-81 J-447 263.1 J-669 263.9 53 100 DI 140 0.09 0.063 0.131 0.01 11 10 273.8 273.8 Existing UPVC to be Replaced
1935 P-878 J-420 252.8 J-196 250 185 100 DI 130 0.09 0.063 0.15 0.03 15 18 268 268 Existing DI to be retained
1023 P-67 J-597 261.8 J-598 260.9 47 100 DI 140 0.09 0.063 0.13 0.01 12 13 273.9 273.9 Existing UPVC to be Replaced
1165 P-79 J-667 261 J-426 259.5 52 100 DI 140 0.09 0.059 0.116 0.01 20 21 280.6 280.6 Existing UPVC to be Replaced
1081 P-534 J-92 255.6 J-443 255 103 100 DI 140 0.09 0.059 0.116 0.01 23 24 278.6 278.6 Proposed New DI Pipeline
1968 P-891 J-907 261 J-113 262.2 241 100 DI 130 0.09 0.058 0.127 0.03 13 12 273.9 273.9 Existing DI to be retained
1786 P-150 J-911 255 J-928 255.9 119 100 DI 140 0.08 0.057 0.109 0.01 17 16 272 272 Existing UPVC to be Replaced
1431 P-669 J-125 263 J-77 262.3 69 100 DI 140 0.08 0.056 0.103 0.01 11 12 273.9 273.9 Proposed New DI Pipeline
1950 P-882 J-851 257.1 J-376 256.7 234 100 DI 130 0.08 0.054 0.114 0.03 24 24 280.8 280.8 Existing DI to be retained
1290 P-614 J-436 263 J-726 263.9 60 100 DI 140 0.08 0.054 0.097 0.01 11 10 273.9 273.9 Proposed New DI Pipeline
1635 P-761 J-726 263.9 J-815 265 110 100 DI 140 0.07 0.049 0.082 0.01 10 9 273.9 273.9 Proposed New DI Pipeline
1503 P-114 J-598 260.9 J-735 260.6 89 100 DI 140 0.07 0.049 0.082 0.01 13 13 273.9 273.9 Existing UPVC to be Replaced
546 P-37 J-328 259.9 J-329 258.9 28 100 DI 140 0.07 0.048 0.078 0 21 22 280.9 280.9 Existing UPVC to be Replaced
329 P-282 J-196 250 J-197 250 17 100 DI 130 0.07 0.047 0.087 0 18 18 268 268 Existing DI to be retained
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

306 P-277 J-181 254.6 J-182 254.5 17 100 DI 140 0.07 0.047 0.075 0 20 20 274.7 274.7 Proposed New DI Pipeline
145 P-234 J-77 262.3 J-78 262.2 6 100 DI 140 0.07 0.046 0.071 0 12 12 273.9 273.9 Proposed New DI Pipeline
1332 P-98 J-746 255.3 J-634 253.8 69 100 DI 140 0.06 0.039 0.053 0 26 27 281.1 281.1 Existing UPVC to be Replaced
1562 P-119 J-426 259.5 J-185 257.5 80 100 DI 140 0.06 0.039 0.053 0 21 23 280.6 280.6 Existing UPVC to be Replaced
1295 P-616 J-235 259.4 J-166 259.4 61 100 DI 130 0.06 0.037 0.057 0 15 15 273.9 273.9 Existing DI to be retained
627 P-375 J-376 256.7 J-364 256.9 31 100 DI 130 0.05 0.037 0.056 0 24 24 280.8 280.8 Existing DI to be retained
1310 P-620 J-735 260.6 J-736 260.6 90 100 DI 140 0.05 0.037 0.048 0 13 13 273.9 273.9 Proposed New DI Pipeline
820 P-443 J-485 258.8 J-316 259.2 76 100 DI 140 0.05 0.037 0.048 0 15 15 273.9 273.9 Proposed New DI Pipeline
921 P-480 J-543 262.5 J-544 263.2 43 100 DI 140 0.05 0.036 0.047 0 11 11 273.8 273.8 Proposed New DI Pipeline
1039 P-518 J-195 256.1 J-607 256.4 47 100 DI 140 0.05 0.036 0.046 0 19 18 274.9 274.9 Proposed New DI Pipeline
1965 P-890 J-1 251 J-983 251.1 218 100 DI 140 0.05 0.035 0.045 0.01 20 19 270.6 270.6 Proposed New DI Pipeline
2113 P-944 J-928 255.9 J-515 252.5 262 100 DI 130 0.05 0.033 0.046 0.01 16 19 272 271.9 Existing DI to be retained
2128 P-1066 J-543 262.5 J-648 261.8 109 100 DI 140 0.05 0.032 0.037 0 11 12 273.8 273.8 Existing CI to be Replaced
1286 P-612 J-544 263.2 J-724 263.3 70 100 DI 140 0.05 0.032 0.037 0 11 10 273.8 273.8 Proposed New DI Pipeline
748 P-418 J-443 255 J-444 255 36 100 DI 140 0.05 0.031 0.036 0 24 24 278.6 278.6 Proposed New DI Pipeline
1407 P-658 J-636 259.8 J-744 260.6 93 100 DI 140 0.05 0.031 0.035 0 15 14 274.6 274.5 Proposed New DI Pipeline
1639 P-764 J-736 260.6 J-78 262.2 96 100 DI 130 0.04 0.03 0.037 0 13 12 273.9 273.9 Existing DI to be retained
1778 P-822 J-912 251.4 J-708 251 118 100 DI 140 0.04 0.03 0.033 0 19 20 270.7 270.7 Proposed New DI Pipeline
283 P-271 J-166 259.4 J-167 259.1 15 100 DI 130 0.04 0.029 0.035 0 15 15 273.9 273.9 Existing DI to be retained
800 P-437 J-473 263.1 J-225 263.1 39 100 DI 130 0.04 0.029 0.035 0 11 11 274.1 274.1 Existing DI to be retained
312 P-279 J-185 257.5 J-186 257.1 16 100 DI 140 0.04 0.028 0.028 0 23 23 280.6 280.6 Proposed New DI Pipeline
1807 P-832 J-924 253.1 J-934 252.9 125 100 DI 140 0.04 0.028 0.028 0 20 20 273.2 273.2 Proposed New DI Pipeline
2115 P-945 J-515 252.5 J-493 252.3 14 100 DI 130 0.04 0.028 0.032 0 19 20 271.9 271.9 Existing DI to be retained
2117 P-946 J-493 252.3 J-560 252.2 4 100 DI 130 0.04 0.026 0.031 0 20 20 271.9 271.9 Existing DI to be retained
375 P-297 J-225 263.1 J-191 263.1 19 100 DI 140 0.04 0.026 0.025 0 11 11 274.1 274.1 Proposed New DI Pipeline
1045 P-520 J-610 261.3 J-611 261.6 56 100 DI 140 0.04 0.026 0.025 0 13 12 274.1 274.1 Proposed New DI Pipeline
1913 P-866 J-611 261.6 J-206 261.6 161 100 DI 130 0.04 0.026 0.029 0 12 12 274.1 274.1 Existing DI to be retained
1956 P-885 J-190 262.7 J-610 261.3 201 100 DI 130 0.04 0.026 0.029 0.01 11 13 274.1 274.1 Existing DI to be retained
1182 P-573 J-197 250 J-674 250.3 55 100 DI 140 0.04 0.025 0.023 0 18 18 268 268 Proposed New DI Pipeline
75 P-6 J-31 264 J-32 264 4 100 DI 140 0.04 0.024 0.022 0 16 16 280.1 280.1 Existing UPVC to be Replaced
1811 P-157 J-669 263.9 J-778 266 163 100 DI 140 0.04 0.024 0.022 0 10 8 273.8 273.8 Existing UPVC to be Replaced
1493 P-697 J-815 265 J-286 265.2 74 100 DI 140 0.03 0.024 0.021 0 9 9 273.9 273.9 Proposed New DI Pipeline
1484 P-692 J-386 264.1 J-812 264 83 100 DI 140 0.03 0.023 0.02 0 16 16 280.2 280.2 Proposed New DI Pipeline
736 P-412 J-437 254.1 J-338 253.9 35 100 DI 140 0.03 0.023 0.019 0 25 25 279.3 279.3 Proposed New DI Pipeline
602 P-366 J-218 255 J-361 255 33 100 DI 140 0.03 0.022 0.019 0 15 15 270.4 270.4 Proposed New DI Pipeline
2266 P-979 J-578 257 J-990 257 1 100 DI 140 0.03 0.022 0.015 0 11 11 268.4 268.4 Proposed New DI Pipeline
879 P-469 J-468 258.4 J-518 258.6 42 100 DI 140 0.03 0.02 0.016 0 16 16 274.5 274.5 Proposed New DI Pipeline
1834 P-844 J-175 258.4 J-554 254.8 130 100 DI 130 0.03 0.019 0.017 0 23 26 281.3 281.3 Existing DI to be retained
1781 P-823 J-364 256.9 J-926 256.2 117 100 DI 130 0.03 0.019 0.017 0 24 25 280.8 280.8 Existing DI to be retained
961 P-493 J-563 251.1 J-564 251.2 46 100 DI 140 0.03 0.019 0.015 0 21 21 272.5 272.5 Proposed New DI Pipeline
1937 P-183 J-975 251 J-976 250.3 189 100 DI 140 0.03 0.019 0.014 0 20 20 270.7 270.7 Existing UPVC to be Replaced
1849 P-850 J-584 255 J-950 252.4 135 100 DI 130 0.03 0.018 0.015 0 15 18 270.4 270.4 Existing DI to be retained
2118 P-947 J-560 252.2 J-123 250 99 100 DI 130 0.03 0.018 0.015 0 20 22 271.9 271.9 Existing DI to be retained
1403 P-656 J-778 266 J-103 265.2 68 100 DI 130 0.03 0.018 0.015 0 8 9 273.8 273.8 Existing DI to be retained
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

2130 P-1067 J-648 261.8 J-537 261.2 59 100 DI 140 0.03 0.018 0.013 0 12 13 273.8 273.8 Existing CI to be Replaced
494 P-330 J-299 253 J-300 253.1 25 100 DI 140 0.03 0.018 0.012 0 15 15 268 268 Proposed New DI Pipeline
845 P-453 J-206 261.6 J-414 261.7 40 100 DI 130 0.03 0.018 0.014 0 12 12 274.1 274.1 Existing DI to be retained
1180 P-572 J-252 253 J-673 252.4 54 100 DI 140 0.02 0.017 0.011 0 22 23 275.3 275.3 Proposed New DI Pipeline
1486 P-693 J-235 259.4 J-813 257.8 74 100 DI 140 0.02 0.017 0.011 0 15 16 273.9 273.9 Proposed New DI Pipeline
1652 P-132 J-329 258.9 J-877 257.3 126 100 DI 140 0.02 0.017 0.011 0 22 24 280.9 280.9 Existing UPVC to be Replaced
1735 P-799 J-911 255 J-266 254.1 126 100 DI 140 0.02 0.017 0.011 0 17 18 272 272 Proposed New DI Pipeline
1801 P-828 J-815 265 J-112 263.2 147 100 DI 140 0.02 0.016 0.011 0 9 11 273.9 273.9 Proposed New DI Pipeline
664 P-388 J-186 257.1 J-396 256 33 100 DI 140 0.02 0.016 0.01 0 23 25 280.6 280.6 Proposed New DI Pipeline
1553 P-725 J-808 263.3 J-104 265.1 117 100 DI 130 0.02 0.015 0.01 0 10 9 273.8 273.8 Existing DI to be retained
1892 P-172 J-931 261.8 J-964 261.5 152 100 DI 140 0.02 0.015 0.009 0 22 22 283.8 283.8 Existing UPVC to be Replaced
2267 P-980 J-990 257 J-904 255.5 118 100 DI 140 0.02 0.014 0.008 0 11 13 268.4 268.4 Proposed New DI Pipeline
1461 P-681 J-338 253.9 J-804 253.5 71 100 DI 140 0.02 0.013 0.008 0 25 26 279.3 279.3 Proposed New DI Pipeline
154 P-13 J-24 254.2 J-83 254.3 7 100 DI 140 0.02 0.013 0.005 0 18 18 272 272 Existing UPVC to be Replaced
944 P-486 J-554 254.8 J-555 255 44 100 DI 140 0.02 0.013 0.007 0 26 26 281.3 281.3 Proposed New DI Pipeline
441 P-313 J-267 259.6 J-268 259.2 22 100 DI 140 0.02 0.013 0.007 0 14 15 273.9 273.9 Proposed New DI Pipeline
607 P-368 J-364 256.9 J-365 258.1 30 100 DI 140 0.02 0.013 0.007 0 24 23 280.8 280.8 Proposed New DI Pipeline
889 P-55 J-524 255 J-525 255 42 100 DI 140 0.02 0.012 0.006 0 15 15 270.4 270.4 Existing UPVC to be Replaced
2110 P-203 J-1014 253 J-864 253.4 65 100 DI 140 0.02 0.012 0.006 0 22 22 275.3 275.3 Existing UPVC to be Replaced
592 P-362 J-355 258.4 J-356 257.1 30 100 DI 140 0.02 0.012 0.006 0 23 24 281.1 281.1 Proposed New DI Pipeline
863 P-462 J-509 250.8 J-510 251 41 100 DI 140 0.02 0.012 0.006 0 21 20 271.3 271.3 Proposed New DI Pipeline
646 P-381 J-87 252 J-387 252 32 100 DI 140 0.02 0.012 0.006 0 19 19 271.2 271.2 Proposed New DI Pipeline
1216 P-85 J-537 261.2 J-692 262.1 56 100 DI 140 0.02 0.012 0.006 0 13 12 273.8 273.8 Existing UPVC to be Replaced
1978 P-1050 J-83 254.3 J-985 255.9 234 100 DI 140 0.02 0.011 0.005 0 18 16 272 272 Existing CI to be Replaced
1031 P-515 J-186 257.1 J-602 257.1 47 100 DI 140 0.01 0.01 0.004 0 23 23 280.6 280.6 Proposed New DI Pipeline
1090 P-538 J-329 258.9 J-632 256.9 49 100 DI 140 0.01 0.01 0.005 0 22 24 280.9 280.9 Proposed New DI Pipeline
717 P-405 J-426 259.5 J-427 259 35 100 DI 140 0.01 0.01 0.004 0 21 22 280.6 280.6 Proposed New DI Pipeline
1227 P-86 J-680 261.8 J-698 261.3 57 100 DI 140 0.01 0.01 0.004 0 21 22 283.1 283.1 Existing UPVC to be Replaced
696 P-398 J-414 261.7 J-415 261.7 34 100 DI 130 0.01 0.01 0.005 0 12 12 274.1 274.1 Existing DI to be retained
1538 P-718 J-708 251 J-833 251 77 100 DI 140 0.01 0.01 0.004 0 20 20 270.7 270.7 Proposed New DI Pipeline
1474 P-688 J-692 262.1 J-808 263.3 72 100 DI 130 0.01 0.01 0.005 0 12 10 273.8 273.8 Existing DI to be retained
1754 P-806 J-327 263.9 J-808 263.3 115 100 DI 140 0.01 0.01 0.004 0 10 10 273.8 273.8 Proposed New DI Pipeline
1322 P-626 J-740 268.5 J-143 268 85 100 DI 140 0.01 0.009 0.003 0 12 12 280.1 280.1 Proposed New DI Pipeline
640 P-380 J-383 255.6 J-384 255.2 44 100 DI 140 0.01 0.009 0.004 0 24 24 279.3 279.3 Proposed New DI Pipeline
1116 P-550 J-39 258.4 J-643 258 51 100 DI 140 0.01 0.009 0.004 0 16 16 274 274 Proposed New DI Pipeline
746 P-417 J-255 257.5 J-442 257.3 36 100 DI 140 0.01 0.008 0.003 0 17 17 274.1 274.1 Proposed New DI Pipeline
1440 P-674 J-396 256 J-794 256 83 100 DI 140 0.01 0.007 0.002 0 25 25 280.6 280.6 Proposed New DI Pipeline
1747 P-804 J-182 254.5 J-916 255.2 125 100 DI 140 0.01 0.007 0.003 0 20 19 274.7 274.7 Proposed New DI Pipeline
1073 P-530 J-401 259.1 J-624 259.2 50 100 DI 140 0.01 0.007 0.002 0 23 23 282.1 282.1 Proposed New DI Pipeline
1274 P-607 J-718 261.1 J-719 260.9 59 100 DI 140 0.01 0.006 0.002 0 22 22 282.8 282.8 Proposed New DI Pipeline
1769 P-817 J-182 254.5 J-922 254 140 100 DI 140 0.01 0.006 0.002 0 20 21 274.7 274.7 Proposed New DI Pipeline
1198 P-580 J-167 259.1 J-682 259 55 100 DI 140 0.01 0.006 0.002 0 15 15 273.9 273.9 Proposed New DI Pipeline
1252 P-600 J-708 251 J-709 251 70 100 DI 140 0.01 0.006 0.002 0 20 20 270.7 270.7 Proposed New DI Pipeline
2126 P-954 J-724 263.3 J-654 263.1 22 100 DI 140 0.01 0.006 0.002 0 10 11 273.8 273.8 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

215 P-254 J-123 250 J-101 250.1 10 100 DI 130 0.01 0.006 0.004 0 22 22 271.9 271.9 Existing DI to be retained
1232 P-590 J-167 259.1 J-271 258.1 56 100 DI 130 0.01 0.006 0.002 0 15 16 273.9 273.9 Existing DI to be retained
966 P-495 J-378 258 J-566 258.8 48 100 DI 140 0.01 0.006 0.002 0 16 16 274.5 274.5 Proposed New DI Pipeline
1143 P-557 J-396 256 J-658 255 52 100 DI 140 0.01 0.005 0.001 0 25 26 280.6 280.6 Proposed New DI Pipeline
873 P-466 J-515 252.5 J-516 252.2 41 100 DI 140 0.01 0.005 0.001 0 19 20 271.9 271.9 Proposed New DI Pipeline
1141 P-556 J-613 262.9 J-657 261.9 52 100 DI 130 0.01 0.005 0.001 0 17 18 280.2 280.2 Existing DI to be retained
1367 P-643 J-536 262.6 J-761 263.7 67 100 DI 140 0.01 0.005 0.001 0 11 10 274.1 274.1 Proposed New DI Pipeline
729 P-410 J-414 261.7 J-433 261 35 100 DI 140 0.01 0.005 0.001 0 12 13 274.1 274.1 Proposed New DI Pipeline
472 P-322 J-286 265.2 J-287 265.4 24 100 DI 130 0.01 0.004 0.001 0 9 9 273.9 273.9 Existing DI to be retained
562 P-353 J-338 253.9 J-339 253.8 31 100 DI 140 0.01 0.004 0.001 0 25 25 279.3 279.3 Proposed New DI Pipeline
570 P-357 J-342 260.3 J-343 260.6 29 100 DI 140 0.01 0.004 0.001 0 14 14 274.3 274.3 Proposed New DI Pipeline
751 P-419 J-445 254.6 J-446 253.6 36 100 DI 140 0.01 0.004 0.001 0 26 27 281.1 281.1 Proposed New DI Pipeline
1080 P-533 J-473 263.1 J-55 264 49 100 DI 140 0.01 0.004 0.001 0 11 10 274.1 274.1 Proposed New DI Pipeline
1832 P-843 J-789 269.2 J-944 266.5 129 100 DI 130 0.01 0.004 0.001 0 11 14 280.1 280.1 Existing DI to be retained
968 P-496 J-415 261.7 J-567 260.8 45 100 DI 140 0.01 0.004 0.001 0 12 13 274.1 274.1 Proposed New DI Pipeline
1582 P-739 J-101 250.1 J-853 249.7 84 100 DI 140 0.01 0.004 0.001 0 22 22 271.9 271.9 Proposed New DI Pipeline
1418 P-664 J-77 262.3 J-768 263 69 100 DI 140 0.01 0.004 0.001 0 12 11 273.9 273.9 Proposed New DI Pipeline
1095 P-541 J-634 253.8 J-635 252.9 50 100 DI 140 0 0.003 0 0 27 28 281.1 281.1 Proposed New DI Pipeline
111 P-228 J-55 264 J-56 264 5 100 DI 140 0 0.003 0 0 10 10 274.1 274.1 Proposed New DI Pipeline
754 P-420 J-447 263.1 J-448 263.5 36 100 DI 140 0 0.003 0.001 0 11 10 273.8 273.8 Proposed New DI Pipeline
1722 P-795 J-548 261 J-906 260.1 106 100 DI 140 0 0.003 0 0 22 23 282.9 282.9 Proposed New DI Pipeline
720 P-406 J-428 256.9 J-429 256.9 35 100 DI 140 0 0.002 0 0 17 17 274.2 274.2 Proposed New DI Pipeline
182 P-244 J-101 250.1 J-102 250.2 8 100 DI 130 0 0.002 0 0 22 22 271.9 271.9 Existing DI to be retained
834 P-449 J-493 252.3 J-494 252.1 40 100 DI 140 0 0.002 0 0 20 20 271.9 271.9 Proposed New DI Pipeline
956 P-491 J-560 252.2 J-561 251.7 45 100 DI 140 0 0.002 0 0 20 20 271.9 271.9 Proposed New DI Pipeline
1326 P-627 J-742 256.8 J-743 255.9 62 100 DI 140 0 0.002 0 0 23 24 279.9 279.9 Proposed New DI Pipeline
1382 P-648 J-111 263.2 J-768 263 82 100 DI 140 0 0.001 0 0 11 11 273.9 273.9 Proposed New DI Pipeline
1278 P-609 J-415 261.7 J-720 262.5 65 100 DI 130 0 0.001 0 0 12 12 274.1 274.1 Existing DI to be retained
1362 P-641 J-463 264.2 J-758 263.8 65 100 DI 140 0 0.001 0 0 16 16 280.1 280.1 Proposed New DI Pipeline
1364 P-642 J-759 259.9 J-760 259.5 65 100 DI 140 0 0.001 0 0 22 23 282.5 282.5 Proposed New DI Pipeline
1463 P-682 J-554 254.8 J-805 253 74 100 DI 130 0 0.001 0 0 26 28 281.3 281.3 Existing DI to be retained
1830 P-842 J-166 259.4 J-943 259.7 173 100 DI 140 0 0.001 0 0 15 14 273.9 273.9 Proposed New DI Pipeline
2132 P-955 J-648 261.8 J-649 260 51 100 DI 140 0 0.001 0 0 12 14 273.8 273.8 Proposed New DI Pipeline
2134 P-1068 J-537 261.2 J-538 260.7 41 100 DI 140 0 0.001 0 0 13 13 273.8 273.8 Existing CI to be Replaced
255 P-991 J-2 251 J-149 251 13 100 DI 140 0 0 0 0 20 20 270.6 270.6 Existing CI to be Replaced
2160 P-965 J-785 251 J-1023 251.2 67 100 DI 130 0 0 0 0 20 19 270.7 270.7 Existing DI to be retained
1154 P-561 J-253 256.6 J-663 256.8 52 100 DI 140 0 0 0 0 18 18 274.8 274.8 Proposed New DI Pipeline
2157 P-964 J-550 251.1 J-1022 251.2 91 100 DI 130 0 0 0 0 19 19 270.6 270.6 Existing DI to be retained
483 P-325 J-293 258 J-294 257.8 25 100 DI 130 0 0 0 0 23 23 281.3 281.3 Existing DI to be retained
1823 P-839 J-778 266 J-939 266.5 128 100 DI 140 0 0 0 0 8 7 273.8 273.8 Proposed New DI Pipeline
1953 P-884 J-981 249.2 J-123 250 197 100 DI 140 0 0 0 0 23 22 271.9 271.9 Proposed New DI Pipeline
2071 P-931 J-967 258.2 J-1009 260.3 738 100 DI 140 0 0 0 0 23 21 281.3 281.3 Proposed New DI Pipeline
1329 P-628 J-744 260.6 J-745 260.8 62 100 DI 140 0 0 0 0 14 14 274.5 274.5 Proposed New DI Pipeline
1415 P-663 J-783 254.3 J-729 255.2 68 100 DI 140 0 0 0 0 14 13 268.3 268.3 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

447 P-315 J-271 258.1 J-272 257.6 22 100 DI 130 0 0 0 0 16 16 273.9 273.9 Existing DI to be retained
2039 P-195 J-999 263.6 J-368 260.9 598 100 DI 140 0 0 0 0 20 23 284.1 284.1 Existing UPVC to be Replaced
1859 P-852 J-443 255 J-954 252.8 141 100 DI 140 0 0 0 0 24 26 278.6 278.6 Proposed New DI Pipeline
2240 P-1070 J-1038 258.1 J-990 257 91 100 DI 140 0 0 0 0 10 11 268.4 268.4 Existing CI to be Replaced
1696 P-786 J-896 253.1 J-376 256.7 100 100 DI 140 0 0 0 0 28 24 280.8 280.8 Proposed New DI Pipeline
232 P-259 J-134 256.1 J-135 255.7 11 100 DI 140 0 0 0 0 25 25 281.1 281.1 Proposed New DI Pipeline
1890 P-860 J-963 247.3 J-464 252.7 152 100 DI 130 0 0 0 0 24 19 271.7 271.7 Existing DI to be retained
1010 P-508 J-590 250.1 J-196 250 46 100 DI 140 0 0 0 0 18 18 268 268 Proposed New DI Pipeline
1495 P-698 J-143 268 J-789 269.2 76 100 DI 140 0 0 0.002 0 12 11 280.1 280.1 Proposed New DI Pipeline
701 P-400 J-417 263.1 J-111 263.2 34 100 DI 130 0 -0.001 0 0 11 11 273.9 273.9 Existing DI to be retained
757 P-421 J-449 252.2 J-88 252 36 100 DI 140 0 -0.001 0 0 19 19 271.1 271.1 Proposed New DI Pipeline
1320 P-625 J-739 263.4 J-726 263.9 62 100 DI 140 0 -0.001 0 0 10 10 273.9 273.9 Proposed New DI Pipeline
1804 P-830 J-112 263.2 J-286 265.2 123 100 DI 130 0 -0.001 0 0 11 9 273.9 273.9 Existing DI to be retained
543 P-348 J-326 263.8 J-327 263.9 30 100 DI 140 0 -0.002 0 0 10 10 273.8 273.8 Proposed New DI Pipeline
625 P-374 J-375 262.4 J-125 263 31 100 DI 140 0 -0.002 0 0 12 11 273.9 273.9 Proposed New DI Pipeline
2243 P-209 J-1039 258.3 J-578 257 91 100 MS 140 0 -0.002 0 0 10 11 268.4 268.4 Existing MS to be Replaced
481 P-324 J-292 265.5 J-104 265.1 24 100 DI 140 0 -0.003 0.001 0 8 9 273.8 273.8 Proposed New DI Pipeline
806 P-439 J-476 258.5 J-477 258.8 39 100 DI 140 0 -0.003 0 0 16 16 274.6 274.6 Proposed New DI Pipeline
266 P-267 J-135 255.7 J-156 255.3 13 100 DI 140 0 -0.003 0 0 25 26 281.1 281.1 Proposed New DI Pipeline
1755 P-807 J-918 257.7 J-71 258.2 135 100 DI 130 0 -0.003 0.001 0 24 23 281.7 281.7 Existing DI to be retained
435 P-311 J-263 253.5 J-264 253.9 22 100 DI 140 0 -0.003 0 0 21 21 274.6 274.6 Proposed New DI Pipeline
1429 P-668 J-789 269.2 J-740 268.5 69 100 DI 130 0.01 -0.004 0.001 0 11 12 280.1 280.1 Existing DI to be retained
1357 P-638 J-756 251.6 J-251 252.7 64 100 DI 140 0.01 -0.005 0.001 0 24 23 275.3 275.3 Proposed New DI Pipeline
1062 P-71 J-156 255.3 J-445 254.6 48 100 DI 140 0.01 -0.006 0.002 0 26 26 281.1 281.1 Existing UPVC to be Replaced
244 P-262 J-142 268 J-143 268 12 100 DI 140 0.01 -0.006 0.002 0 12 12 280.1 280.1 Proposed New DI Pipeline
1706 P-790 J-900 254.9 J-683 253.4 101 100 DI 130 0.01 -0.006 0.002 0 21 22 275.5 275.5 Existing DI to be retained
680 P-999 J-405 264.1 J-406 264.3 34 100 DI 140 0.01 -0.007 0.002 0 16 16 280.1 280.1 Existing CI to be Replaced
344 P-287 J-205 261.3 J-206 261.6 17 100 DI 140 0.01 -0.007 0.003 0 13 12 274.1 274.1 Proposed New DI Pipeline
817 P-442 J-483 257.3 J-484 257.5 39 100 DI 140 0.01 -0.007 0.002 0 17 17 274.1 274.1 Proposed New DI Pipeline
894 P-473 J-527 253.1 J-299 253 42 100 DI 140 0.01 -0.007 0.003 0 15 15 268 268 Proposed New DI Pipeline
629 P-376 J-377 259.4 J-378 258 41 100 DI 140 0.01 -0.008 0.003 0 15 16 274.5 274.5 Proposed New DI Pipeline
798 P-436 J-472 253.5 J-391 253 39 100 DI 140 0.01 -0.008 0.003 0 22 23 275.6 275.6 Proposed New DI Pipeline
1878 P-857 J-960 263.3 J-907 261 202 100 DI 140 0.01 -0.008 0.003 0 11 13 273.9 273.9 Proposed New DI Pipeline
703 P-401 J-418 253.5 J-419 253.9 34 100 DI 140 0.01 -0.008 0.003 0 15 14 268 268 Proposed New DI Pipeline
1636 P-762 J-871 253 J-420 252.8 95 100 DI 140 0.01 -0.008 0.003 0 15 15 268 268 Proposed New DI Pipeline
438 P-312 J-265 253.8 J-266 254.1 22 100 DI 140 0.01 -0.009 0.003 0 18 18 272 272 Proposed New DI Pipeline
415 P-995 J-251 252.7 J-252 253 21 100 DI 140 0.01 -0.009 0.004 0 23 22 275.3 275.3 Existing CI to be Replaced
197 P-249 J-111 263.2 J-112 263.2 9 100 DI 130 0.01 -0.009 0.004 0 11 11 273.9 273.9 Existing DI to be retained
185 P-245 J-103 265.2 J-104 265.1 9 100 DI 130 0.01 -0.009 0.004 0 9 9 273.8 273.8 Existing DI to be retained
2109 P-202 J-863 252.7 J-1014 253 21 100 DI 140 0.01 -0.01 0.004 0 23 22 275.3 275.3 Existing UPVC to be Replaced
1459 P-110 J-803 263.6 J-344 263.7 71 100 DI 140 0.02 -0.011 0.006 0 16 16 280.1 280.1 Existing UPVC to be Replaced
1601 P-747 J-861 255.6 J-431 258.6 85 100 DI 140 0.02 -0.012 0.006 0 25 22 281.1 281.1 Proposed New DI Pipeline
1108 P-1010 J-639 251 J-640 251.4 50 100 DI 140 0.02 -0.012 0.006 0 23 22 273.6 273.6 Existing CI to be Replaced
1597 P-745 J-859 259 J-710 259.6 85 100 DI 140 0.02 -0.013 0.007 0 23 23 282.4 282.4 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

1043 P-519 J-609 250.2 J-197 250 48 100 DI 140 0.02 -0.013 0.007 0 18 18 268 268 Proposed New DI Pipeline
2014 P-911 J-740 268.5 J-972 266.5 320 100 DI 130 0.02 -0.014 0.009 0 12 14 280.1 280.1 Existing DI to be retained
638 P-379 J-382 262 J-21 262.2 31 100 DI 140 0.02 -0.014 0.008 0 21 21 283.1 283.1 Proposed New DI Pipeline
1196 P-579 J-681 262.4 J-580 263.1 55 100 DI 130 0.02 -0.015 0.01 0 18 17 280.1 280.1 Existing DI to be retained
508 P-336 J-307 257.7 J-254 257.9 26 100 DI 140 0.02 -0.017 0.011 0 16 16 274 274 Proposed New DI Pipeline
1346 P-635 J-751 255 J-752 254.5 97 100 DI 140 0.02 -0.017 0.011 0 13 13 268 268 Proposed New DI Pipeline
1481 P-691 J-811 260.9 J-549 261.8 93 100 DI 140 0.02 -0.017 0.011 0 22 21 283.1 283.1 Proposed New DI Pipeline
2125 P-953 J-327 263.9 J-724 263.3 37 100 DI 140 0.03 -0.017 0.012 0 10 10 273.8 273.8 Proposed New DI Pipeline
1911 P-177 J-970 258.9 J-368 260.9 162 100 DI 140 0.03 -0.018 0.013 0 25 23 284.1 284.1 Existing UPVC to be Replaced
1389 P-103 J-772 254.8 J-524 255 66 100 DI 140 0.03 -0.019 0.015 0 16 15 270.4 270.4 Existing UPVC to be Replaced
1802 P-829 J-932 261.6 J-669 263.9 176 100 DI 140 0.03 -0.02 0.016 0 12 10 273.8 273.8 Proposed New DI Pipeline
1916 P-867 J-264 253.9 J-348 255.2 203 100 DI 140 0.03 -0.021 0.018 0 21 19 274.6 274.6 Proposed New DI Pipeline
1412 P-661 J-378 258 J-744 260.6 68 100 DI 140 0.03 -0.022 0.019 0 16 14 274.5 274.5 Proposed New DI Pipeline
782 P-431 J-463 264.2 J-32 264 37 100 DI 140 0.03 -0.022 0.019 0 16 16 280.1 280.1 Proposed New DI Pipeline
1733 P-798 J-910 253 J-464 252.7 128 100 DI 130 0.03 -0.023 0.022 0 19 19 271.7 271.7 Existing DI to be retained
992 P-65 J-580 263.1 J-344 263.7 45 100 DI 140 0.03 -0.023 0.02 0 17 16 280.1 280.1 Existing UPVC to be Replaced
989 P-206 J-578 257 J-579 256.2 45 100 MS 140 0.03 -0.023 0.021 0 11 12 268.4 268.4 Existing MS to be Replaced
1063 P-525 J-619 253.6 J-620 253.3 48 100 DI 130 0.03 -0.023 0.024 0 21 22 274.9 274.9 Existing DI to be retained
1550 P-724 J-839 256.4 J-840 257.7 81 100 DI 140 0.04 -0.024 0.021 0 25 24 281.3 281.3 Proposed New DI Pipeline
1525 P-712 J-828 264.8 J-103 265.2 91 100 DI 140 0.04 -0.024 0.022 0 9 9 273.8 273.8 Proposed New DI Pipeline
320 P-281 J-190 262.7 J-191 263.1 17 100 DI 140 0.04 -0.026 0.025 0 11 11 274.1 274.1 Proposed New DI Pipeline
1269 P-91 J-445 254.6 J-634 253.8 59 100 DI 140 0.04 -0.026 0.025 0 26 27 281.1 281.1 Existing UPVC to be Replaced
1313 P-621 J-737 251.1 J-593 250.7 61 100 DI 140 0.04 -0.03 0.032 0 20 20 271.1 271.1 Proposed New DI Pipeline
2086 P-1058 J-978 251.3 J-1011 251 193 100 DI 140 0.04 -0.03 0.033 0.01 20 20 270.9 270.9 Existing CI to be Replaced
2252 P-1072 J-1041 257.1 J-978 251.3 446 100 DI 140 0.05 -0.034 0.043 0.02 14 20 270.9 270.9 Existing CI to be Replaced
1565 P-732 J-752 254.5 J-299 253 82 100 DI 130 0.06 -0.038 0.058 0 13 15 268 268 Existing DI to be retained
785 P-433 J-464 252.7 J-109 253.1 38 100 DI 130 0.06 -0.038 0.06 0 19 19 271.7 271.7 Existing DI to be retained
573 P-39 J-344 263.7 J-31 264 28 100 DI 140 0.06 -0.039 0.054 0 16 16 280.1 280.1 Existing UPVC to be Replaced
194 P-248 J-109 253.1 J-110 253.2 9 100 DI 140 0.06 -0.043 0.064 0 19 19 271.7 271.7 Proposed New DI Pipeline
1946 P-1045 J-978 251.3 J-668 251 201 100 DI 140 0.06 -0.044 0.067 0.01 20 20 270.9 270.9 Existing CI to be Replaced
1720 P-142 J-524 255 J-217 255.3 126 100 DI 140 0.08 -0.056 0.104 0.01 15 15 270.4 270.4 Existing UPVC to be Replaced
363 P-293 J-217 255.3 J-218 255 18 100 DI 140 0.09 -0.059 0.113 0 15 15 270.4 270.4 Proposed New DI Pipeline
1402 P-655 J-734 260.9 J-267 259.6 71 100 DI 140 0.09 -0.063 0.129 0.01 13 14 273.9 273.9 Proposed New DI Pipeline
2009 P-907 J-406 264.3 J-972 266.5 297 100 DI 130 0.11 -0.071 0.187 0.06 16 14 280.1 280.1 Existing DI to be retained
1308 P-619 J-734 260.9 J-234 259.6 62 100 DI 130 0.11 -0.076 0.213 0.01 13 14 273.9 273.9 Existing DI to be retained
1173 P-568 J-299 253 J-419 253.9 53 100 DI 130 0.12 -0.079 0.229 0.01 15 14 268 268 Existing DI to be retained
1523 P-710 J-267 259.6 J-485 258.8 127 100 DI 140 0.12 -0.084 0.221 0.03 14 15 273.9 273.9 Proposed New DI Pipeline
1540 P-719 J-419 253.9 J-192 253.8 78 100 DI 130 0.15 -0.102 0.362 0.03 14 14 268 268 Existing DI to be retained
1924 P-873 J-972 266.5 J-385 264.5 189 100 DI 130 0.16 -0.111 0.425 0.08 14 16 280.1 280.2 Existing DI to be retained
643 P-45 J-385 264.5 J-386 264.1 32 100 DI 140 0.17 -0.114 0.387 0.01 16 16 280.2 280.2 Existing UPVC to be Replaced
1620 P-129 J-581 259.2 J-746 255.3 89 100 DI 140 0.18 -0.12 0.428 0.04 22 26 281 281.1 Existing UPVC to be Replaced
1518 P-707 J-113 262.2 J-734 260.9 79 100 DI 130 0.19 -0.13 0.568 0.05 12 13 273.9 273.9 Existing DI to be retained
1012 P-509 J-316 259.2 J-39 258.4 46 100 DI 130 0.19 -0.131 0.583 0.03 15 16 273.9 274 Existing DI to be retained
853 P-457 J-485 258.8 J-40 258.4 47 100 DI 140 0.2 -0.138 0.557 0.03 15 16 273.9 274 Proposed New DI Pipeline
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

1050 P-69 J-386 264.1 J-613 262.9 47 100 DI 140 0.2 -0.138 0.56 0.03 16 17 280.2 280.2 Existing UPVC to be Replaced
87 P-224 J-39 258.4 J-40 258.4 4 100 DI 130 0.22 -0.151 0.751 0 16 16 274 274 Existing DI to be retained
523 P-340 J-234 259.6 J-316 259.2 27 100 DI 130 0.22 -0.152 0.767 0.02 14 15 273.9 273.9 Existing DI to be retained
1120 P-75 J-613 262.9 J-645 261.9 51 100 DI 140 0.23 -0.153 0.675 0.03 17 18 280.2 280.3 Existing UPVC to be Replaced
1940 P-879 J-645 261.9 J-933 260.2 253 100 DI 140 0.23 -0.153 0.675 0.17 18 20 280.3 280.5 Proposed New DI Pipeline
1603 P-124 J-469 259.1 J-636 259.8 93 100 DI 140 0.23 -0.155 0.693 0.06 15 15 274.5 274.6 Existing UPVC to be Replaced
2087 P-1059 J-1011 251 J-668 251 8 100 DI 140 0.26 -0.176 0.877 0.01 20 20 270.9 270.9 Existing CI to be Replaced
1194 P-578 J-22 262.3 J-680 261.8 55 100 DI 140 0.27 -0.181 0.915 0.05 21 21 283.1 283.1 Proposed New DI Pipeline
2063 P-207 J-579 256.2 J-247 251 570 100 MS 140 0.42 -0.282 2.085 1.19 12 18 268.4 269.6 Existing MS to be Replaced
409 P-307 J-247 251 J-248 251 21 100 DI 130 0.43 -0.289 2.511 0.05 18 19 269.6 269.6 Existing DI to be retained
2026 P-916 J-248 251 J-550 251.1 395 100 DI 130 0.43 -0.289 2.511 0.99 19 19 269.6 270.6 Existing DI to be retained
280 P-270 J-164 252 J-165 251.9 14 100 DI 140 0.43 -0.289 2.188 0.03 19 19 271 271 Proposed New DI Pipeline
565 P-354 J-40 258.4 J-254 257.9 29 100 DI 130 0.44 -0.302 2.717 0.08 16 16 274 274 Existing DI to be retained
420 P-308 J-254 257.9 J-255 257.5 22 100 DI 130 0.49 -0.332 3.238 0.07 16 17 274 274.1 Existing DI to be retained
2146 P-957 J-868 257.7 J-967 258.2 81 100 DI 140 0.5 -0.338 2.926 0.24 23 23 281 281.3 Proposed New DI Pipeline
2121 P-950 J-255 257.5 J-484 257.5 1 100 DI 130 0.51 -0.344 3.46 0 17 17 274.1 274.1 Existing DI to be retained
2123 P-951 J-484 257.5 J-428 256.9 32 100 DI 130 0.52 -0.351 3.597 0.12 17 17 274.1 274.2 Existing DI to be retained
1898 P-863 J-967 258.2 J-727 258.7 173 100 DI 140 0.53 -0.362 3.309 0.57 23 23 281.3 281.8 Proposed New DI Pipeline
2124 P-952 J-428 256.9 J-348 255.2 94 100 DI 130 0.54 -0.365 3.855 0.36 17 19 274.2 274.6 Existing DI to be retained
580 P-358 J-348 255.2 J-181 254.6 29 100 DI 130 0.59 -0.401 4.594 0.14 19 20 274.6 274.7 Existing DI to be retained
1016 P-1008 J-593 250.7 J-509 250.8 46 100 DI 140 0.63 -0.43 4.567 0.21 20 21 271.1 271.3 Existing CI to be Replaced
1963 P-1047 J-509 250.8 J-563 251.1 218 100 DI 140 0.69 -0.465 5.278 1.15 21 21 271.3 272.5 Existing CI to be Replaced
2034 P-919 J-181 254.6 J-988 253 365 100 DI 130 0.69 -0.466 6.069 2.21 20 24 274.7 276.9 Existing DI to be retained
1857 P-1036 J-563 251.1 J-924 253.1 136 100 DI 140 0.72 -0.488 5.776 0.79 21 20 272.5 273.2 Existing CI to be Replaced
326 P-993 J-194 256.4 J-195 256.1 17 100 DI 140 0.77 -0.521 6.501 0.11 18 19 274.8 274.9 Existing CI to be Replaced
2000 P-1052 J-195 256.1 J-988 253 271 100 DI 140 0.83 -0.564 7.539 2.05 19 24 274.9 276.9 Existing CI to be Replaced
2089 P-1061 J-750 253.4 J-806 253.4 2 150 DI 140 0.56 -0.861 2.294 0.01 22 22 275.2 275.2 Existing CI to be Replaced
1760 P-810 J-806 253.4 J-683 253.4 118 150 DI 140 0.57 -0.875 2.36 0.28 22 22 275.2 275.5 Existing DI to be Replaced
1200 P-581 J-683 253.4 J-391 253 57 150 DI 130 0.58 -0.892 2.808 0.16 22 23 275.5 275.6 Existing DI to be retained
654 P-384 J-391 253 J-392 253 33 150 DI 130 0.6 -0.917 2.955 0.1 23 23 275.6 275.7 Existing DI to be retained
1634 P-131 J-22 262.3 J-585 263.3 89 150 DI 140 0.6 -0.919 2.586 0.23 21 20 283.1 283.3 Existing UPVC to be Replaced
1626 P-757 J-868 257.7 J-293 258 90 150 DI 140 0.66 -1.013 3.093 0.28 23 23 281 281.3 Existing DI to be Replaced
1766 P-814 J-293 258 J-71 258.2 114 150 DI 140 0.68 -1.031 3.198 0.36 23 23 281.3 281.7 Existing DI to be Replaced
136 P-232 J-71 258.2 J-72 258.2 6 150 DI 140 0.69 -1.05 3.303 0.02 23 23 281.7 281.7 Existing DI to be Replaced
1973 P-189 J-72 258.2 J-759 259.9 231 150 DI 140 0.69 -1.058 3.352 0.77 23 22 281.7 282.5 Existing UPVC to be Replaced
1702 P-139 J-759 259.9 J-718 261.1 101 150 DI 140 0.7 -1.067 3.406 0.34 22 22 282.5 282.8 Existing UPVC to be Replaced
1500 P-113 J-718 261.1 J-21 262.2 73 150 DI 140 0.7 -1.076 3.461 0.25 22 21 282.8 283.1 Existing UPVC to be Replaced
1993 P-1051 J-988 253 J-204 255.2 262 150 DI 140 0.71 -1.081 3.488 0.92 24 23 276.9 277.9 Existing CI to be Replaced
60 P-4 J-21 262.2 J-22 262.3 2 150 DI 140 0.72 -1.093 3.567 0.01 21 21 283.1 283.1 Existing UPVC to be Replaced
1342 P-632 J-620 253.3 J-750 253.4 64 150 DI 140 0.74 -1.131 3.794 0.24 22 22 274.9 275.2 Proposed New DI Pipeline
1001 P-66 J-585 263.3 J-586 263.7 46 150 DI 140 0.75 -1.147 3.897 0.18 20 20 283.3 283.5 Existing UPVC to be Replaced
167 P-240 J-91 255.7 J-92 255.6 8 150 DI 130 0.77 -1.168 4.623 0.04 23 23 278.6 278.6 Existing DI to be retained
1923 P-872 J-91 255.7 J-867 256.2 172 150 DI 140 0.79 -1.199 4.231 0.73 23 23 278.6 279.3 Proposed New DI Pipeline
2048 P-923 J-92 255.6 J-851 257.1 430 150 DI 130 0.81 -1.238 5.149 2.21 23 24 278.6 280.8 Existing DI to be retained
Length Hazen- Headloss Pressure Pressure Hydraulic Hydraulic
Elevation Stop Elevation Diameter Velocity Flow Headloss
ID Label Start Node (Scaled) Material Williams Gradient (Start) (m (Stop) (m Grade Grade Remarks
Start Node Stop (mm) (m/s) (MLD) (m)
(m) C (m/km) H2O) H2O) (Start) (m) (Stop) (m)

341 P-286 J-203 255.2 J-204 255.2 17 150 DI 130 0.83 -1.264 5.346 0.09 23 23 277.8 277.9 Existing DI to be retained
1746 P-803 J-867 256.2 J-742 256.8 108 150 DI 140 0.85 -1.299 4.907 0.53 23 23 279.3 279.9 Proposed New DI Pipeline
1577 P-737 J-851 257.1 J-840 257.7 82 150 DI 130 0.86 -1.32 5.8 0.47 24 24 280.8 281.3 Existing DI to be retained
2145 P-956 J-742 256.8 J-868 257.7 227 150 DI 140 0.87 -1.333 5.149 1.17 23 23 279.9 281 Proposed New DI Pipeline
1757 P-808 J-840 257.7 J-618 258.3 112 150 DI 130 0.89 -1.353 6.064 0.68 24 24 281.3 282 Existing DI to be retained
1060 P-1009 J-618 258.3 J-50 258.8 48 200 DI 140 0.66 -1.802 2.214 0.11 24 23 282 282.1 Existing CI to be Replaced
711 P-1000 J-49 258.8 J-400 259.1 35 200 DI 140 0.67 -1.807 2.226 0.08 23 23 282.1 282.2 Existing CI to be Replaced
1255 P-1014 J-400 259.1 J-710 259.6 58 200 DI 140 0.81 -2.19 3.179 0.18 23 23 282.2 282.4 Existing CI to be Replaced
1910 P-1042 J-710 259.6 J-548 261 161 200 DI 140 0.82 -2.236 3.303 0.53 23 22 282.4 282.9 Existing CI to be Replaced
930 P-1003 J-548 261 J-549 261.8 43 200 DI 140 0.83 -2.261 3.372 0.15 22 21 282.9 283.1 Existing CI to be Replaced
952 P-1006 J-549 261.8 J-558 262.1 45 200 DI 140 0.84 -2.291 3.454 0.15 21 21 283.1 283.2 Existing CI to be Replaced
1793 P-151 J-558 262.1 J-679 263.2 120 200 DI 140 0.85 -2.307 3.5 0.42 21 20 283.2 283.6 Existing UPVC to be Replaced
1104 P-544 J-204 255.2 J-91 255.7 50 150 DI 140 1.54 -2.355 14.766 0.74 23 23 277.9 278.6 Existing DI to be Replaced
613 P-43 J-368 260.9 J-369 260.2 32 300 DI 140 0.59 -3.609 1.112 0.04 23 24 284.1 284.2 Existing UPVC to be Replaced
HYDRAULIC MODEL INVENTORY (Junction) OF DMA-4 (Rairangpur)
Demand Hydraulic Pressure
ID Label Elevation (m)
(ML/day) Grade (m) (m H2O)
31 J-1 251 0.016 270.6 20
32 J-2 251 0.003 270.6 20
61 J-21 262.2 0.003 283.1 21
62 J-22 262.3 0.007 283.1 21
64 J-23 254.2 0.004 272 18
65 J-24 254.2 0 272 18
76 J-31 264 0.001 280.1 16
77 J-32 264 0.002 280.1 16
88 J-39 258.4 0.01 274 16
89 J-40 258.4 0.013 274 16
103 J-49 258.8 0.005 282.1 23
104 J-50 258.8 0.001 282.1 23
112 J-55 264 0.001 274.1 10
113 J-56 264 0.003 274.1 10
137 J-71 258.2 0.016 281.7 23
138 J-72 258.2 0.008 281.7 23
146 J-77 262.3 0.006 273.9 12
147 J-78 262.2 0.005 273.9 12
155 J-83 254.3 0.002 272 18
162 J-87 252 0.018 271.2 19
163 J-88 252 0.003 271.1 19
168 J-91 255.7 0.012 278.6 23
169 J-92 255.6 0.011 278.6 23
183 J-101 250.1 0.001 271.9 22
184 J-102 250.2 0.002 271.9 22
186 J-103 265.2 0.004 273.8 9
187 J-104 265.1 0.003 273.8 9
195 J-109 253.1 0.005 271.7 19
196 J-110 253.2 0.018 271.7 19
198 J-111 263.2 0.007 273.9 11
199 J-112 263.2 0.008 273.9 11
201 J-113 262.2 0.004 273.9 12
202 J-114 262.3 0.007 273.8 12
216 J-123 250 0.012 271.9 22
218 J-124 263.1 0.004 273.9 11
219 J-125 263 0.006 273.9 11
233 J-134 256.1 0 281.1 25
234 J-135 255.7 0.003 281.1 25
245 J-142 268 0.006 280.1 12
246 J-143 268 0.004 280.1 12
256 J-149 251 0 270.6 20
267 J-156 255.3 0.003 281.1 26
281 J-164 252 0.045 271 19
282 J-165 251.9 0.005 271 19
284 J-166 259.4 0.008 273.9 15
285 J-167 259.1 0.017 273.9 15
298 J-175 258.4 0.003 281.3 23
299 J-176 258.2 0.011 281.2 23
Demand Hydraulic Pressure
ID Label Elevation (m)
(ML/day) Grade (m) (m H2O)
307 J-181 254.6 0.018 274.7 20
308 J-182 254.5 0.033 274.7 20
313 J-185 257.5 0.011 280.6 23
314 J-186 257.1 0.002 280.6 23
321 J-190 262.7 0 274.1 11
322 J-191 263.1 0 274.1 11
324 J-192 253.8 0.006 268 14
325 J-193 253.5 0.02 268 15
327 J-194 256.4 0.011 274.8 18
328 J-195 256.1 0.007 274.9 19
330 J-196 250 0.016 268 18
331 J-197 250 0.009 268 18
342 J-203 255.2 0.002 277.8 23
343 J-204 255.2 0.011 277.9 23
345 J-205 261.3 0.007 274.1 13
346 J-206 261.6 0.001 274.1 12
364 J-217 255.3 0.003 270.4 15
365 J-218 255 0 270.4 15
376 J-225 263.1 0.003 274.1 11
390 J-234 259.6 0.006 273.9 14
391 J-235 259.4 0.017 273.9 15
410 J-247 251 0.007 269.6 18
411 J-248 251 0 269.6 19
416 J-251 252.7 0.005 275.3 23
417 J-252 253 0.006 275.3 22
419 J-253 256.6 0.003 274.8 18
421 J-254 257.9 0.013 274 16
422 J-255 257.5 0.004 274.1 17
436 J-263 253.5 0.003 274.6 21
437 J-264 253.9 0.018 274.6 21
439 J-265 253.8 0.009 272 18
440 J-266 254.1 0.007 272 18
442 J-267 259.6 0.008 273.9 14
443 J-268 259.2 0.013 273.9 15
448 J-271 258.1 0.006 273.9 16
449 J-272 257.6 0 273.9 16
473 J-286 265.2 0.018 273.9 9
474 J-287 265.4 0.004 273.9 9
482 J-292 265.5 0.003 273.8 8
484 J-293 258 0.018 281.3 23
485 J-294 257.8 0 281.3 23
495 J-299 253 0.017 268 15
496 J-300 253.1 0.018 268 15
509 J-307 257.7 0.017 274 16
524 J-316 259.2 0.016 273.9 15
544 J-326 263.8 0.002 273.8 10
545 J-327 263.9 0.006 273.8 10
547 J-328 259.9 0.019 280.9 21
548 J-329 258.9 0.021 280.9 22
563 J-338 253.9 0.006 279.3 25
Demand Hydraulic Pressure
ID Label Elevation (m)
(ML/day) Grade (m) (m H2O)
564 J-339 253.8 0.004 279.3 25
571 J-342 260.3 0.026 274.3 14
572 J-343 260.6 0.004 274.3 14
574 J-344 263.7 0.005 280.1 16
581 J-348 255.2 0.015 274.6 19
593 J-355 258.4 0.008 281.1 23
594 J-356 257.1 0.012 281.1 24
603 J-361 255 0.022 270.4 15
608 J-364 256.9 0.005 280.8 24
609 J-365 258.1 0.013 280.8 23
614 J-368 260.9 0.019 284.1 23
615 J-369 260.2 0.008 284.2 24
626 J-375 262.4 0.002 273.9 12
628 J-376 256.7 0.018 280.8 24
630 J-377 259.4 0.008 274.5 15
631 J-378 258 0.008 274.5 16
639 J-382 262 0.014 283.1 21
641 J-383 255.6 0.006 279.3 24
642 J-384 255.2 0.009 279.3 24
644 J-385 264.5 0.003 280.2 16
645 J-386 264.1 0.002 280.2 16
647 J-387 252 0.012 271.2 19
655 J-391 253 0.017 275.6 23
656 J-392 253 0.009 275.7 23
665 J-396 256 0.004 280.6 25
673 J-400 259.1 0.001 282.2 23
674 J-401 259.1 0.005 282.1 23
681 J-405 264.1 0.007 280.1 16
682 J-406 264.3 0 280.1 16
697 J-414 261.7 0.003 274.1 12
698 J-415 261.7 0.006 274.1 12
702 J-417 263.1 0.001 273.9 11
704 J-418 253.5 0.008 268 15
705 J-419 253.9 0.014 268 14
707 J-420 252.8 0.051 268 15
718 J-426 259.5 0.01 280.6 21
719 J-427 259 0.01 280.6 22
721 J-428 256.9 0.012 274.2 17
722 J-429 256.9 0.002 274.2 17
726 J-431 258.6 0.019 281.1 22
730 J-433 261 0.005 274.1 13
734 J-435 263 0.022 273.9 11
735 J-436 263 0.007 273.9 11
737 J-437 254.1 0.042 279.3 25
747 J-442 257.3 0.008 274.1 17
749 J-443 255 0.028 278.6 24
750 J-444 255 0.031 278.6 24
752 J-445 254.6 0.017 281.1 26
753 J-446 253.6 0.004 281.1 27
755 J-447 263.1 0.018 273.8 11
Demand Hydraulic Pressure
ID Label Elevation (m)
(ML/day) Grade (m) (m H2O)
756 J-448 263.5 0.003 273.8 10
758 J-449 252.2 0.001 271.1 19
783 J-463 264.2 0.021 280.1 16
786 J-464 252.7 0.016 271.7 19
793 J-468 258.4 0.03 274.5 16
794 J-469 259.1 0.023 274.5 15
799 J-472 253.5 0.008 275.6 22
801 J-473 263.1 0.032 274.1 11
807 J-476 258.5 0.003 274.6 16
808 J-477 258.8 0.021 274.6 16
818 J-483 257.3 0.007 274.1 17
819 J-484 257.5 0 274.1 17
821 J-485 258.8 0.018 273.9 15
835 J-493 252.3 0 271.9 20
836 J-494 252.1 0.002 271.9 20
864 J-509 250.8 0.023 271.3 21
865 J-510 251 0.012 271.3 20
874 J-515 252.5 0.001 271.9 19
875 J-516 252.2 0.005 271.9 20
880 J-518 258.6 0.02 274.5 16
890 J-524 255 0.024 270.4 15
891 J-525 255 0.012 270.4 15
895 J-527 253.1 0.007 268 15
911 J-536 262.6 0.006 274.1 11
913 J-537 261.2 0.006 273.8 13
914 J-538 260.7 0.001 273.8 13
922 J-543 262.5 0.024 273.8 11
923 J-544 263.2 0.005 273.8 11
931 J-548 261 0.022 282.9 22
932 J-549 261.8 0.013 283.1 21
936 J-550 251.1 0.005 270.6 19
945 J-554 254.8 0.006 281.3 26
946 J-555 255 0.013 281.3 26
953 J-558 262.1 0.017 283.2 21
957 J-560 252.2 0.006 271.9 20
958 J-561 251.7 0.002 271.9 20
962 J-563 251.1 0.004 272.5 21
963 J-564 251.2 0.019 272.5 21
967 J-566 258.8 0.006 274.5 16
969 J-567 260.8 0.004 274.1 13
990 J-578 257 0 268.4 11
991 J-579 256.2 0.007 268.4 12
993 J-580 263.1 0.008 280.1 17
995 J-581 259.2 0.009 281 22
999 J-583 255 0.003 270.5 15
1000 J-584 255 0.011 270.4 15
1002 J-585 263.3 0.015 283.3 20
1003 J-586 263.7 0.007 283.5 20
1011 J-590 250.1 0 268 18
1017 J-593 250.7 0.007 271.1 20
Demand Hydraulic Pressure
ID Label Elevation (m)
(ML/day) Grade (m) (m H2O)
1024 J-597 261.8 0.012 273.9 12
1025 J-598 260.9 0.014 273.9 13
1032 J-602 257.1 0.01 280.6 23
1040 J-607 256.4 0.036 274.9 18
1044 J-609 250.2 0.013 268 18
1046 J-610 261.3 0 274.1 13
1047 J-611 261.6 0 274.1 12
1051 J-613 262.9 0.01 280.2 17
1061 J-618 258.3 0.017 282 24
1064 J-619 253.6 0.023 274.9 21
1065 J-620 253.3 0.013 274.9 22
1074 J-624 259.2 0.007 282.1 23
1091 J-632 256.9 0.01 280.9 24
1096 J-634 253.8 0.01 281.1 27
1097 J-635 252.9 0.003 281.1 28
1099 J-636 259.8 0.03 274.6 15
1109 J-639 251 0.012 273.6 23
1110 J-640 251.4 0.029 273.6 22
1117 J-643 258 0.009 274 16
1121 J-645 261.9 0 280.3 18
1127 J-648 261.8 0.013 273.8 12
1128 J-649 260 0.001 273.8 14
1137 J-654 263.1 0.006 273.8 11
1142 J-657 261.9 0.005 280.2 18
1144 J-658 255 0.005 280.6 26
1155 J-663 256.8 0 274.8 18
1166 J-667 261 0.007 280.6 20
1168 J-668 251 0.006 270.9 20
1172 J-669 263.9 0.019 273.8 10
1181 J-673 252.4 0.017 275.3 23
1183 J-674 250.3 0.025 268 18
1193 J-679 263.2 0.025 283.6 20
1195 J-680 261.8 0.022 283.1 21
1197 J-681 262.4 0.015 280.1 18
1199 J-682 259 0.006 273.9 15
1201 J-683 253.4 0.011 275.5 22
1218 J-692 262.1 0.002 273.8 12
1228 J-698 261.3 0.01 283.1 22
1253 J-708 251 0.013 270.7 20
1254 J-709 251 0.006 270.7 20
1256 J-710 259.6 0.033 282.4 23
1275 J-718 261.1 0.003 282.8 22
1276 J-719 260.9 0.006 282.8 22
1279 J-720 262.5 0.001 274.1 12
1287 J-724 263.3 0.008 273.8 10
1291 J-726 263.9 0.004 273.9 10
1293 J-727 258.7 0.009 281.8 23
1299 J-729 255.2 0.003 268.3 13
1309 J-734 260.9 0.009 273.9 13
1311 J-735 260.6 0.012 273.9 13
Demand Hydraulic Pressure
ID Label Elevation (m)
(ML/day) Grade (m) (m H2O)
1312 J-736 260.6 0.007 273.9 13
1314 J-737 251.1 0.03 271.1 20
1321 J-739 263.4 0.001 273.9 10
1323 J-740 268.5 0 280.1 12
1325 J-741 261.5 0.019 274.1 13
1327 J-742 256.8 0.032 279.9 23
1328 J-743 255.9 0.002 279.9 24
1330 J-744 260.6 0.009 274.5 14
1331 J-745 260.8 0 274.5 14
1333 J-746 255.3 0.007 281.1 26
1335 J-747 261 0.006 280.5 19
1343 J-750 253.4 0.001 275.2 22
1347 J-751 255 0.017 268 13
1348 J-752 254.5 0.021 268 13
1358 J-756 251.6 0.005 275.3 24
1363 J-758 263.8 0.001 280.1 16
1365 J-759 259.9 0.008 282.5 22
1366 J-760 259.5 0.001 282.5 23
1368 J-761 263.7 0.005 274.1 10
1383 J-768 263 0.005 273.9 11
1390 J-772 254.8 0.019 270.4 16
1404 J-778 266 0.006 273.8 8
1416 J-783 254.3 0 268.3 14
1422 J-785 251 0.005 270.7 20
1430 J-789 269.2 0 280.1 11
1441 J-794 256 0.007 280.6 25
1460 J-803 263.6 0.011 280.1 16
1462 J-804 253.5 0.013 279.3 26
1464 J-805 253 0.001 281.3 28
1471 J-806 253.4 0.014 275.2 22
1475 J-808 263.3 0.005 273.8 10
1482 J-811 260.9 0.017 283.1 22
1485 J-812 264 0.023 280.2 16
1487 J-813 257.8 0.017 273.9 16
1489 J-814 251.7 0.018 274.5 23
1494 J-815 265 0.009 273.9 9
1526 J-828 264.8 0.024 273.8 9
1539 J-833 251 0.01 270.7 20
1551 J-839 256.4 0.024 281.3 25
1552 J-840 257.7 0.008 281.3 24
1578 J-851 257.1 0.028 280.8 24
1583 J-853 249.7 0.004 271.9 22
1598 J-859 259 0.013 282.4 23
1602 J-861 255.6 0.012 281.1 25
1612 J-863 252.7 0.01 275.3 23
1613 J-864 253.4 0.012 275.3 22
1622 J-867 256.2 0.02 279.3 23
1627 J-868 257.7 0.018 281 23
1637 J-871 253 0.008 268 15
1653 J-877 257.3 0.017 280.9 24
Demand Hydraulic Pressure
ID Label Elevation (m)
(ML/day) Grade (m) (m H2O)
1697 J-896 253.1 0 280.8 28
1707 J-900 254.9 0.006 275.5 21
1716 J-904 255.5 0.014 268.4 13
1723 J-906 260.1 0.003 282.9 23
1726 J-907 261 0.005 273.9 13
1734 J-910 253 0.023 271.7 19
1736 J-911 255 0.007 272 17
1738 J-912 251.4 0.028 270.7 19
1748 J-916 255.2 0.007 274.7 19
1756 J-918 257.7 0.003 281.7 24
1770 J-922 254 0.006 274.7 21
1776 J-924 253.1 0.033 273.2 20
1780 J-925 262 0.04 284 22
1782 J-926 256.2 0.019 280.8 25
1787 J-928 255.9 0.024 272 16
1796 J-931 261.8 0.03 283.8 22
1803 J-932 261.6 0.02 273.8 12
1806 J-933 260.2 0 280.5 20
1808 J-934 252.9 0.028 273.2 20
1824 J-939 266.5 0 273.8 7
1831 J-943 259.7 0.001 273.9 14
1833 J-944 266.5 0.004 280.1 14
1850 J-950 252.4 0.018 270.4 18
1860 J-954 252.8 0 278.6 26
1879 J-960 263.3 0.008 273.9 11
1891 J-963 247.3 0 271.7 24
1893 J-964 261.5 0.015 283.8 22
1899 J-967 258.2 0.023 281.3 23
1912 J-970 258.9 0.018 284.1 25
1925 J-972 266.5 0.026 280.1 14
1938 J-975 251 0.013 270.7 20
1939 J-976 250.3 0.019 270.7 20
1945 J-978 251.3 0.04 270.9 20
1954 J-981 249.2 0 271.9 23
1966 J-983 251.1 0.035 270.6 19
1979 J-985 255.9 0.011 272 16
1994 J-988 253 0.051 276.9 24
2002 J-990 257 0.008 268.4 11
2040 J-999 263.6 0 284.1 20
2072 J-1009 260.3 0 281.3 21
2076 J-1011 251 0.001 270.9 20
2108 J-1014 253 0.011 275.3 22
2156 J-1022 251.2 0 270.6 19
2159 J-1023 251.2 0 270.7 19
2238 J-1038 258.1 0 268.4 10
2241 J-1039 258.3 0.002 268.4 10
2250 J-1041 257.1 0.034 270.9 14