DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED
Lae
Deda Frelgh Conor Corporation)
‘Systra Mott Macdonald (iV) S¥STIA Oe
RR an
Dedicated Freght Catdor— Eastern cordon
MUGHALSARAL-NEW BHAUPUR, CONTRACT PKG 2018202
[METHOD STATEMENT TRACK LAYING FOR
[DEPOT CONNECTIVITY & YARD LINES
DrceyrmacMsyoot
aS [eH | IGG
root) {
Tare [snare Ser
Taine
‘Orga Semisen | RSET ae
i
ie
PROLECT DRECTO"PROTECT: Eastern Dedeated Freight Coridor Package 201 8202), EW
GAR Seen mr Teste ee
Rovson: 00
Introduction.
For execution of track work we wil establish main Tak Depot at Pahara for C201 & at
Rama for C? 202. These depos wl be equipped with requ facies for mechanixed
trac ying
‘The Dapot wil have connection with IR Station Pabars & Ramwa for directly reeling
‘pti rakes loaded with 260m longa panel rom approved source linda Steel
Toestablsh conection of éepet with yard, DFC track rom depot to IR station shall have
tobe in advance by ser mechanized method.
‘Thistrack length il also function as launching pad fe fly mechanized tec ying, whlch
Is essen requirement pir to laying track by Tac laying machine.
Connectivity with station shal be execute in twe phase ast phase OFC ne willbe
connected with IR ne and remaining works shal be executed in 2 phase at per
requirement of
Purpose
‘The purpose ofthis document is to specify procecure fr laying OFC Track to connect
Pahara& Rana Depot with IR yard & Loep Lines.
This methodology shal be of imited us fr lying DFC track to connect Depots with IR
Yard and loop lines and is issued as supplement :9 Skelton wack laying methodology
trendy submitted and approved for matnline.
‘Track Structure
Following technieal Parameters in respect of track structure sal be adopted for Depot nes DFC.
connecting ines, & the in 12 turnout fo temporary connecionn Depots, willbe purchased frm
ROSO approved vendors as pe norms,
SN] Telfer [ore tne Depa
Go 1678 1h OG)
7 |i ag TS a | UE 900 Oa
7 ae | RG ero B tar | Rone Be
a, age 26‘PROJECT: Eastern Dedicated Freight Corridor (Package 203 & 202)
GAR Teena Oso Tastee
Tali eaion ose
‘OR Sin i awices co Ke
crossing on PSC
Tanai Temporary | OR INES slches GORE ORTINES plches REE
onmecontemeendFCe | REMS crossngon sT/SC. | CMS cresingonST/PSC
Depots sleepers. slesers.
‘OR Tin BS wishes ORE [ORT WBS wwiches OREO |
on PSC leepers: sc sleepes
Reference
‘+ anual of instruction on Long Welded Rais (Revised 2006) with Addendum &
Cotigendum Sip 26 15 of tune 2012
SpecFatons for Track Sallatt -GE-L June 2008 Correction Slip ne. 3
eos.09
Manel fr Flash Butt Welding of Rais (Revised January 2012) with Correction
Sipro.2
Fusion Welding of Ralls by Alumino-Thermic Process revised 2012.
‘Manual for Ultrasone Testing of Rails and Wels 2012 (New Manval Revised
2013)
‘uldines for handing of alls (Noversber 2006)
Employer requrement
Indan Ralway Standard Speci for Fat Sotto Rais IRSTH22008 and
acersum and Cotigendu 3 ete line 27,2012
Indian Raleays Permanent Woy Manual {RPWM) {Second Reprint 208, achonce
orton sip Ho 134 dated ul 18" 2013)"Methed statement ~ Track Lying fr Depot
on
GAR Beare ow
| ale
Meth tatement or als supply & stacing.
Meth taterent Sleeper spel stacking
Meth tatement or Rall soppy & stacking
Math tatemant or Traut instal.
Method tatement or Destrssing CHR.
Drawings and specification
‘Track wil be constructed per approved GEC drawings and ail track materials wil be procured
{rom ROSO approved verrs conforrng to approve érawing & specication mentioned below.
PMC approval shal be taben for al Track materials tobe used
far Design nwingio [Speciation
Ta UE SOUS SEE ca
Messed enemeseeser 2 | paso sone 7
‘Dia Tet Cpe GOORTREES | —posomzy| RROMBETP
Serute 20/2007
Sa ne =a Taare — | — sr
Gee = ed roses —[ Ws
Eis Fstering Cig" rosfessia—[ WT
Su oRwide Ta EOE Tonos RSTO
crossing on PSC sleepers ipso 1nS /T-45,
cee ore TaESEOE Tae |S
crossngon seer
Weeonoeieswic THESE | posoyr ease | wsTHORS
Fak Patcinong Grooed wih compe | ROSS] THOS SE [WSTAORTGAR en | ="
|
Organisation
“roel oxgoitation charts given below. Overall organization char with contact
numbers willbe provided before actual execution wok start
6.1 Organisation Chart for Management
it anager
iinet
6.2 Organisation Chart for Survey, Quality & 16Plant and Equipment
"Method Statement ~ Track Laying for Depot
crcc/TeckuMsion connectivity
oviion: 00
PROJECT: Eastern Dedicated Freight Coridor (Package 201 & 202) a0
For efficent exeetion of tack work, under mentioned machines are proposed to be
Free 13m ral, aeady approved by PMC, shall be tansferred by road trae to
spectied locations and shal be placed end to endin paisGR,
| boe. Nos "Method Statement ~ Track Laying for Depot
éceytacmsjon connectivity
Revlon: | 00
‘PROVECT: Eastern Dedicated Freight Corridor (Package 201 & 202) a
[Conversion of 13m single als to 260m long panels would be done inst on formation,
‘byMobile Fash Bult Welding plan, working in mobile mode. In his case Ral wil remain
‘stalonary and Maile woling plan will move lo each joint for weting.
Ateratvely Welding plant wl be kept stalonary and LAR sing wl be moved forward
13m by tractor on role conveyor and next ral fed into poston. This process wl be
‘epested unt the requied sting length is acioved.
Detaled Methodology and Test plan for Flash But Welding ie covered in separate
Netod statement ready approved.
Spreading, Laying & Regulat
10.1 Pre Ballasting over Blanket Laver
> Tack ligament shal be marked by 2 surveyor a5 per designed centerline ofthe
horizontal alignment at 20m {fr straight) & 10m (for curved) intel a5 per
spproved track eo-ocates by Total Station,
‘sting lin le pulled to mark ballast edges for guidance of staff oy fst
layer af tas.
Price othe commencement finial Balas lylg, an approve RE from PMC
wile ensued that the formations complete fo lying of ballast.
‘Akeady tested and approved ballast from selected quaries or stacked at
‘nominated location alalong the proposed tracker stacked on formation ullbe
{spread on completed formation io required quantities with the help of Dumper
{Grader in two compacted layers of 100 rem each
ach aye of Salas il be compacted wth vibratory oad rll iin inimum
| passes foreach aye.
Batast top level in center ofeach rack wile kept lower to avid center binding
of sleeper.
(on completion of Balast bod, Visual nspction shall be carried out joint wth
Engineer to record observations on under mentioned pains,
Approved Balast used forint layer “Yes/No
With offaid Boast is adequate ses No
Balast Depth okatevery20minteral = Yes/No
Contes tine fs marked Yes/NoMethod Statement ~Track ying for Depot
PROJECT faster Dedated Freight Coridr (Package 201 & 202) aay
reefs ceonneetiaty
INITIAL BALLASTING WITH
‘CENTRE LINE MARKED
‘Track Installation
11.1 _Auailiary Track Laying:
Mechanized slf-propeled Portals are proposed to be deployed for unloacng of
sleepess and long weld alison the proposed alignment
For Operations and runing of Mechanized self-propelled Portal, we propose to make one
km of Aviary trackof 3m gage for starting the work with Ral
‘Aternatively we may alto use the LR panel which has been moved to site via rollers for
linking Auiary track deending upon te site conditions
‘The Ausiary track willbe dismantled 8 carried forward and li shes for ext day's wore
fonce tack has been linked in the particular patch. However 300 m of aur track wil
sways be let along the newly linked track for movemant of petals $0 as to faciate
tunloacing & carving of PC sleepers and long welded ra panels from special purpose rail
and PSC sleeper carries
41.2 Tracklaving Activities
SC sleepecs shall be wansported to ste by special purpose cartes
Sleepers willbe unloaded fom these special carers, which have atved a se by thal own
‘motive power from the bse depot of PSC sleepers.PROJECT: Eastern Dedicated Freight Corridor (Package 201 & 202)
oe. Ne ‘Method Statement = Trak ayng fr Depot
2FCcfTae/NsOn connectivity
Revson: 00
‘Seepers shall be spread on the proposed alignment at proper spacings by Self propeled
“Mechanized Portal and lid onthe pre prepared ballast bed to the corectline, lve and
spacing a per the specifications
> rubber Pads & Elsie Clips are stibuteon athe lepers for ing and fastening of rack
> 260 m weed rail strings willbe placed on sleepers by Ral Threader and Track fastenings
arefved.
"Non welded alin willbe jointed temporary wth 1m long fshpatesand“C"darmps tl
they are welded
260m long welded call pane ace futher welded IN-SITU by 2 Mobile Flah bute Welding
Pant to convert 260m pane nto 1040 log panel after supplementation of balat and
‘manual pacing
ny damage caused to DEC ack Ralls or Sleepers during em mechanized laying stall be
replaced
Modification of track /OHE / Signal work willbe executed by IR and hence traffic lock
wil also be arranged by IRPROJECT Eastern Dedicated Freight Corridor (Package 203 & 202),
a rete
GAR mens ae
Revlon: | 00
11.3 Post tracklaving operations:
‘Track Parameter correction
+ Once the days work of track ning I fnishes, Squering of PSC sleepers, Algnent
and other tack parameters wl be checked and rected if necessary.
Boxing & Dressing Ballast
‘+ Required balst for bong and filing wil be unloaded by all cum Road Tuck /
satin houte developed ackhallast cares. 18 and loaders shal be usedto load
‘these ballast carers / Tuck.
‘+The bolas carers will unioad the balast on newly lnked track continuously from
fe end to other The vloaded ballet wil be Ud for boxing ond filng of cribs ane
shoulders of he newt inked track per designed balls profi, to feltate tng
of track and achievement of eaured cushion.
Track Tamping
‘+ To bring track geometry within mits, packing of track stall be done by off track
Tampers
To bring the track to designed alignment and level, reference shal be taken from
reference sakes eretes eater after completion of cil werk
[Adaisonal round of ballastn, lilting and packing wil be implemented tl track
reaches the fina evel and algrnent. Super elevation and versine fr horizontal &
‘erica curves shall be provided as per designed vale.
Finally track wil be taped by C Track taping machine to correct track geometry.
‘After achieving the desired track geometry as ern down standard, ballast salle
Property dressed to complete the profile s per LWR manual
11.4 Conversion to CWR and De-stressing
Conversion to CWR shall be done ol after Machine packing and dynamic sablisation
of track, Detaled Methodology and Test pan for conversion of WR Inte CW anc De
stressing covered under separate Method statement‘PROJECT: Eastern Deccated Freight Coridor (Package 20
Re ‘Method Statement ~ Trak Lyirg for Depot
orca cece
[ee
12 Environmental management
‘The purpose of the Envirenmental Management process to ensure
Works are planned, cared out and contrlled which contributes to the long
term protection ofthe Region and Local Environment.
Comply with the relevant acts, contractual and legal requirements,
Continually inprove the environmental performance,
Correct eisposalof dangerous substance,
13° Job safety analysis,
Risk Assessment
Safety induction courses and tralnng shal be even tal elevant sta and workers
ror to commencement of tock works at worksite.
[A the commencement ofthe respective tasks al Track lying works Personnel shall
be taken throug the Pre Work Briefing by the Superisor and shall sign the
_chnowledgemert form confiing that such insruction as necessary has taken
place
“The kay isk 0 follow:
Manus handing,
Covpling and sncouping materials ain from TRACK LAYER
“Mechanically moving parts arms kag)
Working in hat,
Wied oF Dust,
Materials loading and unloading,
Gantres moving on top ofthe materials train,
Fallure of fig, locking & dragging equipment
Teac management/protecion at level crossing
Precaution ding ral panel handing to avoid injury
Emergency response plan
13.2 General Safety
> All persons wil wear standard personal protective equipment which as @ minimum
wil indude hard hat, Hiv vest or shirt and safety footwear. Where specie risks
are ideniied mere specaised protective equipment willbe issued and used. f‘PROJECT: Eastern Dedicated Freight Corridor (Package 201 & 202) im
Doe to: ‘Method Statement = Tack Laying fr Depot ddd
orcerraeyms/o. ‘connectivity
trinng in the use of PPE is required this wil be ven to specific workers and
recordedon 2 Mati
AAPrework Se sha be caries ou by te supervisor prot to esa ec Si
12: new task, wih all relevant personnel attending, to adress spec areas of
cncer or new hazard or acts that may fect the work tobe cared out Pre-
work Briefing shall be recorded with al attendees sgring the attendance shee.
Completed forms ae tobe returned tothe safety deparement for ing and audit
parposes
Weelly Tool-box tals shall be conducted by the supervisor and personnel valved
ior to the commencement of works. Safety toolbox records tobe furished to
PMC. The aim ofthese meetings sto focus on health an safety issues and any other
vorkrelated issues that personnel may wish to raise. These meetings shall be
‘corded wit ll attendees signing the attendance sheet. Completed forms are to
brretured tothe safety department fr fing,
‘rks generally intended tobe undertaken during nal working hur, but work
fostside of normal hours, and right wotk, shall be cred out asthe programme
requires o for ether operational reasons.
_Asequat lighting shal be mad avalale in care of ight work.
Safety warring signs shall be placed to prowde adequate warning
fed & Green Fag with requled manpower shall be posted during operation of
Machine for the safety of workers Red Banner Flag shal be placed i rear ofthe
machine to warn the operators of other machines working in ear.
Fest id kts shall be provide to all ight vehicle, tool trucks, work rains, tack
‘machines an ll designated work bases. These ae for emergency use en, and to
‘movie inital treatment until specialized medical care avaiable. A Gsinated first
3d person sal be nominated in every work crew.
‘oetfecive means of communication shal be established foreach wok rou.Method Seatement~ Tack Laying fr Depot
becerreayMso1 ‘connectivity
FROJECT: Eastern Dedicated Freight Corridor (Package 701 & 202)
owes Jad
Appendix A: TP
‘Activity including | Reference | Acceptance Remark ‘|
necessaryinspection | document ____criterion
Preliminary [
Reproval/ authorised | MTCC | Document to be Wack material check
Document for Ral Sleeper verified BRA to Ist approved RF
Fiting bbe approved
[Approvalorthe raiwelas | MTEC | Oocument tobe | Tack wateral check
Test welds in place verified & RFD | ist & approved RF!
bbeaporoved |
Inease af werks District | Scope & | Document tobe | Pre TRACK AYER
‘Admbisraton approvalin | Method | verified work checklist
pace statement
Ensure bottom ballet bed [Bottom | Checklist tobe Pre TRACK LAYER
'ssutable for sleeper avrg | ballast laying | verified & RFI to | work checklist &
methodology | be provided ___spproved EL
‘Ffset center tine pegs | Setting out | Check ist tobe re TRACK LAYER
fetabished toconvol | of design | verified ARF Io | work checklist &
sigamentof track track beprovided | approved AF
‘conetrucion coordinates
seper MS |
Sleeper tying t
Verity concrete dlesperiaid | WEE Check Tat tobe TRACKTAYER
correct spacing theyare | Speciation | verified working checklist &
| Square & pods ae installs approved FL
Ral installation &
fastening
Ensure al alsa taled | WS Checklist tobe TRACK LATER
sper specticationand | Specification | verified working checklist &
siting Raton Pads [" approved af
erty that al fatonings [WEE ‘heck ist wba TRACK LAYER
reapplied & salisfully | Speciation | verified wotking checklist
sloped AC Si _|sppeoved a
Oy T
69 owe
RepresentativePROJECT: Eastern Dedicated Freight Corridor (Package 201 & 202)
oe. Method Statement ~ Track Laylg for Depat
oFceyraky so. connectivy
‘Anpendix8: Track Laying check ist
item] Reity Reference | Aezwplance rteron | Vefeation/ | Obser
No| document | inspection | vation
[oni 1
LI [As peritSTI2SAL—__| Verification of Vercation of
inspection cetiate, weld | document for document
testcartieat, Test wld | compliance
rests
Tal panelunloodire rom —| al panel unloading =
rake er DSO guide. ne.
fall rgister upéated |__|
Tai panel stack inspection | Rai pane tacking is | Val hspecton &
er approved rowing | RF forralpanel
snproved
Sleeper a
’As par ROSO drawing RS/ | Verifiation of Verfiation oF
| r39manufacturer Test | documents for docament
corfiate Inspection | compliance
cortiieate Test report |
‘leper unloading, ROS guides | Viualnepacion &
stocking Binspecion | flowed for sleeper | RFito be approved
stacking. Proper stacking
with right size wooden
dunnage. Sleeper
{ reqister to be updated
30 eRe |
‘As par ROSO drawing. | Verifation of
Manufsrurer MTC /ic | documents for
| Vsuainipection&
verification f|
compre Repbert | donment
be updated
“As per RDSO drawing. Verification of 1 War inspection &
WanutacurerMte/'€ | docamets for | verifieaton of
omplancRepierto | ociment
beupdsted
Tepe fOSD devine | Vsextonaf salnaecion&
Representative Representative7 :
OR ee
\WeLp or oF pan
soineno. | P| chainage
9
au rey
sepresenctve
age 5 of 18PROJECT: Eastern Dedicated Freight Corridor (Package 201 8 202) | [IIE
Doe. ‘Method Statement Track 2yng fer Depot :
orcc/Tae/vson connectviy
‘Appendix D Post Vorking Check Uist Track Laying
Reference document | Aezeptanceeteion | Observation
Verify sleepers | As per specification & Sleeper density 1660"
laid at “corec| Methodstatement per km. Rall pads
spacing, they are inte caret |
square and pact Damaged sleepers
reinstalled removed
Ensure Rais ae [As per spedfeation & Vil inspection of |
instaled 2s per| Method statement rail damage, No det /
speaiieation 8 debris on ral seat
siting lat on pad Ensure ringing of
underfoot of FB weld
its for those coming
Mechanical jointing of
call joints. Gaps
between the ral
panels sutably
foreted
Verivai 7 per speciation &] Zero missing Reng.
fastening pled | Metnod statement | Damaged Finer &
In accordance fastenings replaced.
wth the GEN liners correctly |
speciation | fixed. Temperature to
be recorded at the
| ime of xing ERC
[reek conection [A par speciation & Lateral algnment of
Methodstatement | wack comected to
make track ft for
‘materi train, Vertis
‘ligament of wack,
cross level, twist
coveted 2 make
‘rack fit for material |
Loin & ack machines
pc
Representative Representative