Contractual Positions Cost Summary - CTR XXXX: Attachment 1 - Cost - Time - Resource Sheet
Contractual Positions Cost Summary - CTR XXXX: Attachment 1 - Cost - Time - Resource Sheet
General Engineering Services Contract for the Rumaila Oil Field CONTRACT No. CN 102205
Materials,
Materials & Corrosion
Metallurgy & Lead Engineer $ -
Engineer(region5, others)
Corrosion
Mechanical Engineer (region5,
Lead Engineer $ -
Mechanical others)
Piping Engineer (region5, others) Lead Engineer $ -
Engineering - $ -
OOC Engineering Team PMT - $ -
Sub Total - $ -
Engineering - $ -
Rumaila Site Team PMT - $ -
Sub Total - $ -
Total - $ -
###
Quantity(without
Item Rate (USD) Months Total
Mark-up)
$ -
Grand Total $ -
Note:
1. Manhours/mandays estimted is based on the drawings/documents quantity provided. The acyual manhours/mandays can be finalized upon the receipt of
SOW.
2. Project duration is est. 45 days, +/- 10% of duration change can be acceptable by both parties, over +/- 10% project duration will cause commercial change.
3. Only tecnical comments will be provided by contractor, documetation modificaion will not be covered.
Page 1 of 13
Projects FEED Design Assurance Servs (DS2,4 FWKO,PWT)
SN Document No.
A Mechanical Desgin Review
1 0189WD-N-DG-DG02-ME-DAS-0001
2 0189WD-N-DG-DG02-ME-DAS-0002
3 0189WD-N-DG-DG02-ME-DAS-0003
4 0189WD-N-DG-DG02-ME-DAS-0004
5 0189WD-N-DG-DG02-ME-DAS-0005
6 0189WD-N-DG-DG02-ME-DAS-0006
7 0189WD-N-DG-DG02-ME-DAS-0007
8 0189WD-N-DG-DG02-ME-DAS-0008
9 0189WD-N-DG-DG02-ME-DAS-0009
10 0189WD-N-DG-DG02-ME-DAS-0010
11 0189WD-N-DG-DG02-ME-DAS-0011
12 0189WD-N-DG-DG02-ME-DAS-0012
13 0189WD-N-DG-DG02-ME-DAS-0013
14 0189WD-N-DG-DG02-ME-DAS-0014
15 0189WD-N-DG-DG02-ME-DAS-0015
16 0189WD-N-DG-DG02-ME-DAS-0016
17 0189WD-N-DG-DG02-ME-SOW-0001
0189WD-N-DG-DG02-PR-PID-1002-001
13
0189WD-N-DG-DG02-PR-PID-1003-001
14
0189WD-N-DG-DG02-PR-PID-1004-001
15
0189WD-N-DG-DG02-PR-PID-1005-001
16
0189WD-N-DG-DG02-PR-PID-1006-001
17
0189WD-N-DG-DG02-PR-PID-1007-001
18
0189WD-N-DG-DG02-PR-PID-1008-001
19
0189WD-N-DG-DG02-PR-PID-1009-001
20
0189WD-N-DG-DG02-PR-PID-1010-001
21
0189WD-N-DG-DG02-PR-PID-1011-001
22
2 of 13
Projects FEED Design Assurance Servs (DS2,4 FWKO,PWT)
SN Document No.
0189WD-N-DG-DG02-PR-PID-1012-001
23
0189WD-N-DG-DG02-PR-PID-1013-001
24
0189WD-N-DG-DG02-PR-PID-1014-001
25
26 0189WD-N-DG-DG02-PR-PID-1015-001
0189WD-N-DG-DG02-PR-PID-1016-001
27
0189WD-N-DG-DG02-PR-PID-1017-001
28
0189WD-N-DG-DG02-PR-PID-1018-001
29
0189WD-N-DG-DG02-PR-PID-1019-001
30
0189WD-N-DG-DG02-PR-PID-1020-001
31
0189WD-N-DG-DG02-PR-PID-1021-001
32
0189WD-N-DG-DG02-PR-PID-1022-001
33
0189WD-N-DG-DG02-PR-PID-1023-001
34
0189WD-N-DG-DG02-PR-PID-3001-001
35
0189WD-N-DG-DG02-PR-PID-3001-002
36
37 0189WD-N-DG-DG02-PR-PID-3001-003
0189WD-N-DG-DG02-PR-PID-3002-001
38
0189WD-N-DG-DG02-PR-PID-3003-001
39
0189WD-N-DG-DG02-PR-PID-3004-001
40
0189WD-N-DG-DG02-PR-PID-3005-001
41
0189WD-N-DG-DG02-PR-PID-3006-001
42
43 0189WD-N-DG-DG02-PR-PID-3007-001
0189WD-N-DG-DG02-PR-PID-3008-001
44
45 0189WD-N-DG-DG02-PR-PID-3009-001
0189WD-N-DG-DG02-PR-PID-3010-001
46
0189WD-N-DG-DG02-PR-PID-4001-001
47
0189WD-N-DG-DG02-PR-PID-4001-002
48
49 0189WD-N-DG-DG02-PR-PID-4001-003
0189WD-N-DG-DG02-PR-PID-4002-001
50
0189WD-N-DG-DG02-PR-PID-4003-001
51
3 of 13
Projects FEED Design Assurance Servs (DS2,4 FWKO,PWT)
SN Document No.
0189WD-N-DG-DG02-PR-PID-4004-001
52
0189WD-N-DG-DG02-PR-PID-4005-001
53
0189WD-N-DG-DG02-PR-PID-4006-001
54
55 0189WD-N-DG-DG02-PR-PID-4007-001
0189WD-N-DG-DG02-PR-PID-4008-001
56
57 0189WD-N-DG-DG02-PR-PID-4009-001
0189WD-N-DG-DG02-PR-PID-4010-001
58
59 0189WD-N-DG-DG02-PR-REP-1001
60 0189WD-N-DG-DG02-PR-REP-1002
61 0189WD-N-DG-DG02-PR-REP-1003
62 0189WD-N-DG-DG02-PR-REP-1004
63 0189WD-N-DG-DG02-PR-SPD-1001-001
64 0189WD-N-DG-DG02-PR-SPD-1002-001
65 0189WD-N-DG-DG02-SR-REP-0002
66 0189WD-N-DG-DG02-SR-REP-0003
C Electrical Design
1 0189WD-N-DG-DG02-EL-CAL-0001
2 0189WD-N-DG-DG02-EL-DSL-0001
0189WD-N-DG-DG02-EL-REP-0004
3
4 0189WD-N-DG-DG02-EL-REP-0005
5 0189WD-N-DG-DG02-SR-REP-0005
4 of 13
Projects FEED Design Assurance Servs (DS2,4 FWKO,PWT)
SN Document No.
H Anti-Corrosion and Material Design Review
1 0189WD-N-DG-DG02-ML-REP-0001
5 of 13
Attachment 2_Technical Document Register
XXXX
Document Title
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM PRODUCED WATER TRANS
S
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM PRODUCED WATER TRANS
DISCHARGE MANIFOLD
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM PRODUCED WATER MIN. FL
VERED OIL HEADERS
6 of 13
Attachment 2_Technical Document Register
XXXX
Document Title
E 2 (NORTH) FWKO PROJECT PIPING AND INSTRUMENTATION DIAGRAM DS02 DEGASSING STATION PILOT & PURGE GAS COALE
R AND DISTRIBUTION
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM INSTRUMENT AIR RECEIVER
RIBUTION
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM HP FLARE COLLECTION HE
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM HP FLARE KO DRUM
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM HP FLARE KO DRUM PUMPS
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM FLARE STACK AND IGNITIO
AGE
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM CLOSED DRAIN COLLECTIO
ER
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM CLOSED DRAIN DRUM PUM
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM CHEMICAL TRANSFER PUM
AGE
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM CORROSION INHIBITOR (LIQ
TION PACKAGE
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM DEMULSIFIER INJECTION P
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING AND INSTRUMENTATION DIAGRAM ANTIFOAM INJECTION PACK
E 2 (NORTH) FWKO PROJECT DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM INLET MANIFOLD HEADER TRAIN -1
TRUCT (1 OF 2)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM CORROSION INHIBITOR TIE-IN
MANIFOLD HEADER - TRAIN 2 (CONSTRUCT)
DEGASSING STATION INLET MANIFOLD HEADER - TRAIN 1 - CONSTRUCT (2 OF 2)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM EXISTING 2ND STAGE SEPARA
BYPASS LINE) TRAIN -1 (CONSTRUCT)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM EXISTING D&D PACKAGE
DRATOR INTERFACE TIE-INS - TRAIN 1 (CONSTRUCT)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM LP GAS TIE IN TO BGC 2ND ST
GAS SEPARATOR – (CONSTRUCT)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM HP GAS LIQUID CONDENSATE
GC – (CONSTRUCT)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM HC LIQUID FROM HP FLARE KO
S TO EXISTING DS02 FLOW TANKS (CON
DEGASSING STATION LP GAS TIE-IN TO BGC 2ND STAGE FEED GAS SEPARATOR CONSTRUCT
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM 3RD STAGE SEPARATOR TRAI
STRUCT)
DEGASSING STATION HP GAS AND LIQUID TIE-INS AT BGC CONSTRUCT
E - 2 (NORTH) FWKO PROJECT - DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM EXISTING D&D PACKAGE DE
RFACE TIE-INS - TRAIN 1 (CONSTRUCT)
E 2 (NORTH) FWKO PROJECT DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM INLET MANIFOLD HEADER TRAIN -1
RUCT (1 OF 2)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM CORROSION INHIBITOR TIE-IN
MANIFOLD HEADER - TRAIN 2 (DESTRUCT)
DEGASSING STATION INLET MANIFOLD HEADER - TRAIN 1 - DESTRUCT (2 OF 2)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM EXISTING 2ND STAGE SEPARA
BYPASS LINE) TRAIN -1 (DESTRUCT)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM EXISTING D&D PACKAGE
DRATOR INTERFACE TIE-INS - TRAIN 1 (DESTRUCT)
7 of 13
Attachment 2_Technical Document Register
XXXX
Document Title
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM LP GAS TIE IN TO BGC 2ND ST
GAS SEPARATOR – (DESTRUCT)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM HP GAS LIQUID CONDENSATE
GC – (DESTRUCT)
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM HC LIQUID FROM HP FLARE KO
S TO EXISTING DS02 FLOW TANKS (DEST
DEGASSING STATION LP GAS TIE-IN TO BGC 2ND STAGE FEED GAS SEPARATOR DESTRUCT
E 2 (NORTH) FWKO PROJECT DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM 3RD STAGE SEPARATOR TRAI
RUCT)
DEGASSING STATION HP GAS AND LIQUID TIE-INS AT BGC DESTRUCT
E - 2 (NORTH) FWKO PROJECT - DS02 DEGASSING STATION PIPING & INSTRUMENTATION DIAGRAM EXISTING D&D PACKAGE DE
RFACE TIE-INS - TRAIN 1 (DESTRUCT)
O - DS02 - PROCESS SIMULATION REPORT
- EQUIPMENT SIZING CALCULATION REPORT
– HYDRAULIC STUDY REPORT (ON-PLOT)
- FLARE & BLOWDOWN STUDY REPORT
DEGASSING STATION OVERALL SHUTDOWN OVERVIEW DIAGRAM PRE FWKO & PWT INSTALLATION TRAIN 1
DEGASSING STATION OVERALL SHUTDOWN OVERVIEW DIAGRAM POST FWKO & PWT INSTALLATION TRAIN 1
HAZARD ASSESSMENT REPORT – DS02
- FLARE RADIATION & DISPERSION STUDY
E 2 (NORTH) FREE WATER KNOCK-OUT (FWKO) PROJECT DS02 FEED PHASE - ELECTRICAL CALCULATIONS AND BOOK
E 2 (NORTH) FREE WATER KNOCK-OUT FEED DS02 FWKO/PWT - KEY SINGLE LINE DIAGRAM
E 2 (NORTH) FREE WATER KNOCK-OUT (FWKO) PROJECT - DS02 FEED PHASE – ELECTRICAL POWER SUPPLY CAPACITY STUDY
RT
- ETAP STUDY REPORT
- HAZARDOUS AREA CLASSIFICATION REPORT
FWKO & PWT PROJECT DS02 DGASSING STATION FEED PHASE CONTROL SYSTEM ARCHITECTURE, BLOCK DIAGRAM
- CAUSE & EFFECT DIAGRAM - ESD
E 2 (NORTH) FWKO PROJECT DS02 FEED PHASE - ALARM AND TRIP SCHEDULE FOR DS02 FWKO & PWT
- INSTRUMENT CONTROL, AUTOMATION AND SAFEGUARDING PHILOSOPHY
2 (NORTH) FWKO PROJECT DS02-CIVIL FOUNDATION DESIGN CALCULATIONS FOR ALL EQUIPMENTS
CIVIL FOUNDATION DESIGN CALCULATIONS- PIPE RACK AND PIPE SUPPORTS
- STRUCTURAL DESIGN CALCULATIONS
8 of 13
Attachment 2_Technical Document Register
XXXX
Document Title
9 of 13
ment Register
Rev: A01
Estimated
Discipline
Manhours
Subtotal
10 of 13
ment Register
Rev: A01
Estimated
Discipline
Manhours
11 of 13
ment Register
Rev: A01
Estimated
Discipline
Manhours
Subtotal
Subtotal
Subtotal
Subtotal
Subtotal
200
250
300
Subtotal
12 of 13
ment Register
Rev: A01
Estimated
Discipline
Manhours
Subtotal
13 of 13