JASA KONTRAKTOR UTAMA FIT-OUT UNTUK PROYEK TRANSFORMASI KANTOR BP BERAU LTD.
THE PRINCIPAL
BP BERAU LTD.
A. Preliminaries
A. - Coordination with Principal, building
management & designer.
- Project management and on site cost , includes
but not limited to:
Final Completion
- Safety, Health and Welfare of Workpeople ( K3 / B. - Coordination with Principal & designer.
HSE )
- Permit and Fees - Maximum use of existing facilities in the field &
checking existing conditions
Overall Function Checking
- Overtime cost - Checking BoQ, specifications & drawings The implementation of work per
stage is in accordance with the
-Samples and Prototypes - Material procurement & Delivery/Shipping plan by coordinating with the
- Maintenance and Protection of Existing Roads, - Work Scheduling owner, building management, Testing & commisioniNg
Footpaths, Fences, etc. designer & all parties related to
this project
- Making Good Defects Submission The Asbuilt Drawing
- Shop Drawings & As Built Drawing, O&M C. -
Manuals (min 2 times training), Handover Coordination with Principal & Building
Document content (2 hardcopy and 1 electronic Management
format)
- General Scaffolding and Staging - Checking specifications & Building Asbuilt Guarantee of Work & Equipment
drawings
-Protection of the work - Work Scheduling
- Daily cleaning & Final cleaning on site first hand - Moving Completion of a step by Defect list
over
completing all aspects &
- Insurances, to cover Workers Insurance, specification
Contractor's All Risk Insurance, Third Party
Liabilities (shall refer to proforma contract )
- Floor Finishes
- Internal Partition And Door
- Custom Furniture
EXECUTION PROCESS
( Harno Bastianto)
Direktur