SPV SUTRISNO
Leader JUNAIDI
F FOTO UNIT Team HERIANSYAH
FOTO UNIT -
-
-
-
-
SPV Team Leader Dokumen workplan berfungsi sebagai rencana dan monitor proses pekerjaan dari shift ke shift. Berikan informasi yang jelas pada kolom yang
Signature : Signature : Instruction
telah disediakan dan catatan apabila diperlukan pada kolom note.
Name SUTRISNO Name :
ID No. :0 ID No. :0
Information D: Day N: Night F: Finish NF : Not Finish
Date Date
Shift Status
No Date Ativities PIC Note
(D/N) (F/NF)
Foto
`
Workbook number of page
JOB SCHEDULE SHEET
BPF220224 CANYCOM S25A PT. TRAKTOR NUSANTARA - SAMARINDA 10 of 17
UTR/GOH/ (plant)/ (years-month) / (no doc)
Actual
No. Job Description Date Lead Time Man Perc. Accum. Date Special Tools Facility
Shift Shift
(DD/MM/YYYY) (Hours) Power (%) (%) Man Power (DD/MM/YYYY)
19 Final Inspection 18-Jun-22 1.0 1 1.28%
18 Painting 17-Jun-22 2.0 1 2.56%
17 Install Roller 15-Jun-22 2.0 2 2.56%
Leadtime
Instruction Berikan progres dan informasi yang jelas pada kolom yang telah disediakan sesuai dengan aktual progres pekerjaan.
Target Actual
71 Day 47 Day A : PR/PO C : Tools E : Component G : Man power I : Holiday K : Hujan
B : Negotiation D : Fabrikasi F : Alat bantu H : Parts J : Surcharge parts L : Others
Progress
100.0%
90.0%
80.0%
70.0%
60.0%
50.0%
40.5%40.5%42.5%
40.0% 36.5%38.5%
30.5%32.5%34.5%34.5%
28.5%
24.3%24.3%24.3%26.5%
30.0%
21.3%22.3%23.3%
16.3%17.3%18.3%18.3%19.3%20.3%
14.3%15.3%15.3%15.3%15.3%15.3%15.3%15.3%
20.0%
11.3%11.3%12.3%13.3%
8.3% 9.3% 10.3%
10.0% 5.2% 5.2% 6.2% 6.2% 7.2% 7.3%
2.8% 3.8% 4.2%
0.0%
Days
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
Date 11-Apr 12-Apr 13-Apr 14-Apr 15-Apr 16-Apr 17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr 23-Apr 24-Apr 25-Apr 26-Apr 27-Apr 28-Apr 29-Apr 30-Apr 01-May 02-May 03-May 04-May 05-May 06-May 07-May 08-May 09-May 10-May 11-May 12-May 13-May 14-May 15-May 16-May 17-May 18-May 19-May 20-May 21-May 22-May 23-May 24-May 25-May 26-May 27-May 28-May 29-May 30-May 31-May 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun
Progress per
2.8% 1.0% 0.4% 1.0% 0.0% 1.0% 0.0% 1.0% 0.1% 1.0% 1.0% 1.0% 1.0% 0.0% 1.0% 1.0% 1.0% 1.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.0% 1.0% 1.0% 0.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0.0% 0.0% 2.2% 2.0% 2.0% 2.0% 2.0% 0.0% 2.0% 2.0% 2.0% 0.0% 2.0% 2.0%
shift
Progress
2.8% 3.8% 4.2% 5.2% 5.2% 6.2% 6.2% 7.2% 7.3% 8.3% 9.3% 10.3% 11.3% 11.3% 12.3% 13.3% 14.3% 15.3% 15.3% 15.3% 15.3% 15.3% 15.3% 15.3% 16.3% 17.3% 18.3% 18.3% 19.3% 20.3% 21.3% 22.3% 23.3% 24.3% 24.3% 24.3% 26.5% 28.5% 30.5% 32.5% 34.5% 34.5% 36.5% 38.5% 40.5% 40.5% 42.5% 2.0%
Accumulative
Progress Plan 2.0% 3.4% 4.8% 6.2% 7.6% 9.0% 10.5% 11.9% 13.3% 14.7% 16.1% 17.5% 18.9% 20.3% 21.7% 23.1% 24.5% 25.9% 27.4% 28.8% 30.2% 31.6% 33.0% 34.4% 35.8% 37.2% 38.6% 40.0% 41.4% 42.8% 44.3% 45.7% 47.1% 48.5% 49.9% 51.3% 52.7% 54.1% 55.5% 56.9% 58.3% 59.7% 61.2% 62.6% 64.0% 65.4% 66.8% 68.2% 69.6% 71.0% 72.4% 90.7% 92.1% 93.5% 95.0% 96.4% 97.8% 99.2% 1.4084507042253500%
Delay Code
Machine Model Serial Number Machine Code Date Planned Service Meter Plant Customer Name Location of Machine
Report of Date : 27 Mei 2022 Effective Hours /day : 8 Hours (L) Other Delay Description
37 17 Mei 2022 D 8 0 8
38 18 Mei 2022 D 8 0 8
39 19 Mei 2022 D 8 0 8
40 20 Mei 2022 D 8 0 8
41 21 Mei 2022 D 8 0 8
42 22 Mei 2022 D 8 8 8 0
43 23 Mei 2022 D 8 0 8
44 24 Mei 2022 D 8 0 8
45 25 Mei 2022 D 8 0 8
46 26 Mei 2022 D 8 8 8 0
47 27 Mei 2022 D 8 0 8
48 - D 0 0 0
49 - D 0 0 0
50 - D 0 0 0
51 - D 0 0 0
52 - D 0 0 0
53 - D 0 0 0
54 - D 0 0 0
55 - D 0 0 0
56 - D 0 0 0
57 - D 0 0 0
58 - D 0 0 0
59 - D 0 0 0
60 - D 0 0 0
61 - D 0 0 0
62 - D 0 0 0
63 - D 0 0 0
64 - D 0 0 0
65 - D 0 0 0
66 - D 0 0 0
67 - D 0 0 0
68 - D 0 0 0
69 - D 0 0 0
70 - D 0 0 0
0 0 0 0 0 0 0 0 80 0 0 0 232 80 152
Days 29 10 19