Chiller Roundtable Q&A for January 2012 (Held on February 6, 7, & 13)

Q1: Are there any plans to work with ARI to certify SPLV vs. NPLV?

A1: .No, there are not. A proposal to change the IPLV metric has not gained traction either.

Q2: Are there any plans to address the lead time issues we are currently seeing?

A2: Yes.

Q3: Is there a metric version of the presentation?

A3: The Lunch N Learn presentation on HVACpartners has metric slides in the back up
section.

Q4: Will this presentation be posted?

A4: This presentation contains pricing information and therefore will not be posted. All the
slides useful for customer presentations are included in the Lunch N Learn presentation on
HVACpartners.

Q5: Is the std. tier drive seismic compliant?

A5: Yes

Q6: Is the case study on HVAC?

A6: Yes

Q7: Is the .299 with the std. tier drive or the LF2?

A7: The 0.299 kW/Ton IPLV is with the std tier VFD only.

Q8: Do you have any data center presentation slides like you do with the (3) chiller plant
staging graph?

A8: We do not.

Q9: Will the Full Load and Part Load compressors be built in Charlotte?

A9: Yes

A10: Are there different sections for screw and centrifugal chillers in ASHRAE 90.1.

A10: Yes, screw and centrifugal chillers have different full load and part load minimum
efficiency requirements. Be sure you use the right values.