Professional Documents
Culture Documents
7 t/m3
Granite Cr 35 %
1 Abr 1398 g/t
BRUNO Process Simulation
PLANT: BRITADOR JM
155.2 t/h
INFO: BR-163/PA - KM 487 - MALICHESKI
VIA BRASIL / JM - MALICHESKI LICENSED USER:
DATE: 20/01/2023 19:10
C100 + HP200 FILE: MALICHESKI Cenario Finos.brn
Bruno v 4.1.3.9, exe v4.0.0.66, DB v8.90, c1.00 s1.00 nn 211
2 ATV09-40 Otimização para Finos com Revestimento atual NOTE! The capacities are maximum capacities in a continuous
155.2 Opening 25 mm
troublefree operation when feed material quality and grading curve
126.8
Load 56.4 % corresponds to the theoretical curve used in this calculation.
28.4 Long term capacities will fluctuate due to the variations in the feed
and operating intensity of the plant.
126.8
28.4 N6x16 TD 7
#19 mm/E95 % 225.9
4
#12.5 mm/E93.8 %
14.2 14.2 #4.75 mm/E87.5 % 110.5
29.1
44.7 8
141
110.5
5 HP200
41.5 std fine
4.64
Pilha Pulmão Stroke 77 mm
14.2
99.9 % Setting 13 mm
Speed 950 rpm
110.5
12
100 %
Escalper
CV-1510
6 41.5 44.7 29.1
115.4
11 10 9
36 % 38.8 % 25.2 %
0/4.75mm 4.75/12.5mm 12.5/19mm