DICCIONARIO INGLES ESPAÑOL ELECTRICO

INGLES
Accessible
Bonding jumper
Branch
Branch circuit
Cable tray
Continuous Load
Cooper bonded earth rods
Current-Carrying conductor
Earth pit
Feeder
Flextray
handhole
Insulated
Load
Manhole
Overcurrnet
Phase
Raceway
Receptacle
solid copper earth rods
SPACE
SPARE
ESPAÑOL
Accesible

Circuito derivado
Circuito Derivado
Charola electrica de aluminio
Carga continua
varilla de tierra fisica
Conductor portador de corriente
Registro para tierras
Alimentador
Charola tipo malla
Registro exterior chico (nom 001, orificio de inspeccion )
Aislado
carga
registro exterior grande (nom 001 registro de inspeccion)
sobrecorriente
Fase
Canalizacion
Toma corriente
varilla solida para tierra fisica
LIBRE
ESPACIO LIBRE (TABLERO ELECTRICO)
A la vista
A prueba de lluvia
A prueba de polvo
A tierra
Alcance
ESPAÑOL INGLES
base de concreto prefabricada precast concrete pole base
concreto prefabricado concrete precast
pyramid style piramidal
round cross section circular
square pyramid pole base base de concreto piramidal
Task Name
LETTER OF CONCENT REQUEST (CARTA ANUENCIA)
FORMAL SERVICE REQUEST TO CFE
ISSUE OF RESOLUTE MOTION BY CFE
RESOLUTE DOCUMENT PAYMENT (BY CLIENT)
PROJECT DELIVERY TO CFE FOR REVIEW AND APPROVAL
PROJECT REVIEW AND APPROVAL PROCESS BY CFE
APPROVAL AND REVISION PAYMENT
INCOMING LINE CONSTRUCTION
WORKS AGREEMENT SIGNATURE BETWEEN CLIENT AND CFE
CFE FIELD SUPERVISION REQUEST
TRANSFORMER NUMBER AND ELECTRICAL BRANCH REQUEST
WORKS DELIVERY TO CFE
CFE CONTRACT DOCUMENT ISSUE
CONTRACT SIGN BY CLIENT
CONNECTING SERVICE (HOOK UP)

Automatic recloser
Group operated fuses
Falult line indicadtor
Carta Anuencia
Solicitud de Servicio
Oficio resolutivo
Pago Oficio Resolutivo
Entraga de proyecto a cfe para revision y aprobacion
Aprobacion de proyecto cfe
Pago de Revision y aprobacion de proyecto
Construccion de linea mt

Requisicion de supervicion cfe


Solicitud de numero transformador
Entrega de obra a cfe
Contrato cfe
Firma contrato cffe
conexion linea

Restaurador
Cuchillas de operacion en grupo
Indicador de falla de fase
Logo

Datos y direccion

I would like to use this letter to inform you of the requirements that the electrical service provider “CFE”
made regarding the connection of the new production building to their system, they required group
operated fuses and fault line indicators be installed at the connection point (please see note on attached
drawing)

The department of “CFE” that is responsible for approving the project for the new production building,
determined that additional equipment was required at the service point, it is not until we reached this point
of the project that we were informed and it was required by them, this equipment to summarize is installed
for the protection of the electrical system of the industrial park and its users, in case of an electrical fault
by one of its users, it ensures that faults don’t reach the system and disrupt service for other users, hence
protecting your plant from other users and vice versa.

This requirements are determined only by “CFE” and on a case by case basis, every time that a new users
connects to the system they have to evaluate how this impacts the whole system, they take in to
consideration certain criteria that could impact the performance of the electrical grid, for example, how
many users are under the same circuit, how much demand does that circuit have and what is the expected
demand in the future, the number of faults they have had in the system, just to name a few.
Additionally, as it has been mentioned in previous meetings and in our proposals, “CFE” will most likely
require that in the future an automatic recloser be installed at the connection point, this from previous
experience will not likely happen until you expand your production and your contract with them to reach
approximately 1500KW of demanded load, again as mentioned above this is determined by them on a case
by case basis, but we have seen that around this demand is when they require this equipment. The price of
the installation of this type of equipment can hover around 50 to 80 thousand dollars, this price depends
on the final specifications of the equipment that “CFE” will solicit.
I sincerely hope this letter clears up any questions that arose from this requirement at such a late stage of
the project

Firma