You are on page 1of 6

TUGAS

PERANCANGAN BERBANTUAN KOMPUTER(T)

NAMA : DIDIN SUFRIADY


NIM : D1022191033
HARI/TANGGAL : (KAMIS, 9 MARET 2023) & (KAMIS, 16 MARET 2023)

1. Data Pemakaian Peralatan Listrik


Peralatan Listrik Jumlah Daya (W) Waktu Pemakaian
Lampu Kamar 3 10 18.00 - 06.00
Lampu Teras 2 10 17.00 - 06.00
Lampu Ruang Tamu 2 10 18.00 - 22.00
Lampu Ruang Tengah 1 10 18.00 - 22.00
Lampu Toilet 1 10 18.00 - 06.00
Rice Cooker 1 300 17.00 - 20.00
Kipas Angin 1 90 01.00 - 24.00
Laptop 2 45 19.00 - 24.00
Kulkas 1 150 01.00 - 24.00
Setrika 1 200 17.00 – 20.00
Total Pemakaian listrik berdasarkan jumlah Daya Total
- Lampu Kamar : 30 Watt
- Lampu Teras : 20 Watt
- Lampu Ruang Tamu : 20 Watt
- Lampu Ruang Tengah : 10 Watt
- Lampu Toilet : 10 Watt
- Rice Cooker : 300 Watt
- Kipas Angin : 90 Watt
- Laptop : 50 Watt
- Kulkas : 150 Watt
- Setrika : 18 Watt
2. Data jumlah pemakaian listrik 24 jam
Waktu Peralatan yang di gunakan Jumlah Konsumsi Energi (Wh)
Lampu Kamar, Lampu Teras, Lampu Ruang
01:00 Tamu, Lampu Ruang Tengah, Lampu Toilet, 398
Kipas Angin, Laptop, Kulkas, Setrika
Lampu Kamar, Lampu Teras, Lampu Toilet,
02:00 Kipas Angin 150

Lampu Kamar, Lampu Teras, Lampu Toilet,


03:00 Kipas Angin 150
Lampu Kamar, Lampu Teras, Lampu Toilet,
04:00 Kipas Angin 150

Lampu Kamar, Lampu Teras, Lampu Toilet,


05:00 Kipas Angin 150

Lampu Kamar, Lampu Teras, Lampu Toilet,


06:00 Kipas Angin 150

Lampu Kamar, Lampu Teras, Lampu


07:00 Toilet 60

08:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150


Kipas Angin
09:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
10:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
11:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
12:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
13:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
14:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
15:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
16:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
17:00 Lampu Kamar, Lampu Teras, Lampu Toilet, 150
Kipas Angin
18:00 Lampu Teras, Rice Cooker, Setrika 338
Lampu Kamar, Lampu Teras, Lampu Ruang
19:00 Tamu, Lampu Ruang Tengah, Lampu Toilet, 698
Rice Cooker,
Kipas Angin, Kulkas, Setrika
Lampu Kamar, Lampu Teras, Lampu Ruang
20:00 Tamu, Lampu Ruang Tengah, Lampu Toilet, 160
Kipas Angin, Kulkas, Setrika
Lampu Kamar, Lampu Teras, Lampu Ruang
21:00 Tamu, Lampu Ruang Tengah, Lampu Toilet, 250
Kipas Angin, Laptop, , Kulkas, Setrika
Lampu Kamar, Lampu Teras, Lampu Ruang
22:00 Tamu, Lampu Ruang Tengah, Lampu Toilet, 250
Kipas Angin,
Laptop, Kulkas, Setrika
Lampu Kamar, Lampu Teras, Lampu Ruang
23:00 Tamu, Lampu Ruang Tengah, Lampu Toilet, 250
Kipas Angin,
Laptop, , Kulkas, Setrika
Lampu Kamar, Lampu Teras, Lampu Ruang
24:00 Tamu, Lampu Ruang Tengah, Lampu Toilet, 250
Kipas Angin, Laptop, , Kulkas, Setrika

PROGRAM MATLAB  

%PERANCANGAN PLTS DAN BEBAN LISTRIK


clc, clear
%DATA INTENSITAS SINAR MATAHARI
IT = [0
0
0
0
0
0
110.4
170.9
358.7
696.9
813.5
876.7
680.9
388.9
279.5
185.1
152.2
49.8
0.9
0
0
0
0
0]/1000; %kW/m2
%DATA SUHU SEKITAR
Ta = [25.2
25.1
25
24.9
24.9
24.2
26.1
26.8
28.9
30.2
31.2
32
31.5
30.3
31.1
29.6
29.1
28
26.5
26.2
26.8
25.6
25.3
25.7]; %Celcius
%DATA BEBAN
PB = [398
150
150
150
150
150
60
150
150
150
150
150
150
150
150
150
150
338
698
160
250
250
250
250]/1000;
%DATA KONSTANTA
ITstc = 1; %kW
TaNOCT = 20; %C
ITNOCT = 0.8; %kW
Tcstc = 25; %C
fPV = 85/100;
%DATA PANEL SURYA
PPVstc = 10*100/100;%kW 10 panel PV
EfMPstc = 15.0/100;
TcNOCT = 47;%C
alfaP = -0.4/100;
for t = 1: 24
fTEMP(t) = (1 + alfaP*(Ta(t) + IT(t)*((TcNOCT-TaNOCT)/ITNOCT)-Tcstc))/(1
+alfaP*IT(t)*((TcNOCT-TaNOCT)/ITNOCT)*(EfMPstc/0.9));
PPV(t) = PPVstc*fPV*fTEMP(t)*IT(t)/ITstc;
dP (t) = PPV(t) - PB(t);
end
waktu = 1:24;
plot (waktu,PB,'.-r','LineWidth',2);
hold on
plot (waktu, PPV,'.-g','LineWidth',2);
hold on
plot (waktu,dP,'.-y','LineWidth',2);
xlabel('Waktu (24 Jam)');
ylabel('Energi Listrik (kwh)');
h2 = legend('PB (Beban Listrik)','PPV (Energi Listrik PLTS)','dP (Kelebihan Energi
Listrik)');
grid 
HASIL
Perancangan di atas adalah Perancangan PLTS dan Beban listrik yang menggunakan 10 buah Panel Surya
yang masing – masing memiliki daya sebesar 100 W, dan ternyata masih terjadi kelebihan energy listrik dan
kekurangan energy listrik pada jam – tertentu.

JAM IT (kWh/m2) PPV (kWh) PB (kWh) Dp (kWh)


01:00 0 0
0.3980 -0.3980
02:00 0 0
0.1500 -0.1500
03:00 0 0
0.1500 -0.1500
04:00 0 0
0.1500 -0.1500
05:00 0 0
0.1500 -0.1500
06:00 0 0
0.1500 -0.1500
07:00 0.1104 1.2002
0.0600 1.1402
08:00 0.1709 1.8403 0.1500 1.6903
09:00 0.3587 3.7487 0.1500 3.5987
10:00 0.6969 6.9593 0.1500 6.8093
11:00 0.8135 7.9713 0.1500 7.8213
12:00 0.8767 8.4907 0.1500 8.3407
13:00 0.6809 6.7719 0.1500 6.6219
14:00 0.3889 4.0255 0.1500 3.8755
15:00 0.2795 2.9192 0.1500 2.7692
16:00 0.1851 1.9666 0.1500 1.8166
17:00 0.1522 1.6264 0.1500 1.4764
18:00 0.0498 0.5406 0.3380 0.2026
19:00 0.0009 0.0090
0.6980 -0.6881
20:00 0 0
0.1600 -0.1600
21:00 0 0
0.2500 -0.2500
22:00 0 0
0.2500 -0.2500
23:00 0 0
0.2500 -0.2500
24:00 0 0
0.2500 -0.2500

 Total energi listrik dibutuhkan dalam satu hari 4,904 kWh.


 Total energi listrik dihasilkan PLTS dalam satu hari 106.2734 kWh.
 Total kelebihan energi listrik 48,0697 kWh.
 Total kekurangan energi listrik 49,1588

You might also like