Use of Air Air compressor/ Hose shall have approved third party
compressor for certificate and shall have KNPC safety passing certificate.
blowing purpose. Proper valid fire extinguisher shall be provided.
Static electricity Air compressor shall be grounded properly.
Hose connectors shall be as per KNPC standard and
Fire.
coupling shall be inspected periodically.
Whipping hazard.
Whip lash arrestor shall be provided for hose connections.
Hoses shall be installed with proper coupling, hose clamp.
Locking pins and whip checks.
2 2 3 Caution 1 1 Care
After each work period the machine shall be switched off,
hoses rolled back, all unwanted materials to be removed
and housekeeping will be maintained
An additional pressure regulator, pressure gauge and shut
down valve be provided on the compressor side.
Drip trays under engine driven equipment shall be provided.
Proper communication while pre-commissioning activity on
going.
Refuelling shall be done while compressor on off condition
3 Poor 2 3 Caution Ensure that person involve in the hydro testing are fully 2 2 Care
communication aware of all emergency response procedure in case of
KUWAIT NATIONAL PETROLEUM COMPANY
WORK PERMIT RISK ASSESSMENT
COLD HOT ENTRY
mishap.
Educate the workforce about emergency procedure daily in
pre- task talk.
Improper access/ In case of any emergency all work will be stopped,
shutdown all running equipment and machineries and
egress
report to muster point.
Safe means of access/ egress to be provided and
maintained for the workers carrying out pre-commissioning
activity.
4 Gross Air leak 3 2 Caution 1. Hoses shall be inspected regularly for fraying and heat 2 1 Care
Test, related damage.
2. Hoses shall be installed with proper coupling, hose clamp.
Locking pins and whip checks.
3. All the flanges shall be torqued after re-instatement, prior to
commencement of gross air leak test activity
4. Proper access shall be made available for checking all the
flanges during leak test
5. Only trained and experienced tradesmen shall be engaged
in pre-commissioning activities.
6. After each work period the machine shall be switched off,
hoses rolled back, all unwanted materials to be removed
and housekeeping will be maintained.
7. In case of any leak detected, the line shall be depressurised
KUWAIT NATIONAL PETROLEUM COMPANY
WORK PERMIT RISK ASSESSMENT
COLD HOT ENTRY
Key: ALARM -Serious or major harm will probably occur, ALERT -Moderate harm probable, major harm unlikely to occur
CAUTION -Minor harm probable, major harm very unlikely to occur, CARE-Minor harm possible, major harm very unlikely to occur
Construction Construction
Sr. Construction PMC HSE Safety Engineer KNPC Safety Engineer HSE Manager
Section Head Engineer PMC Engineer
Engineer KNPC Manager Refinery KNPC-CFP Contractor
Contractor
Signature
Name
Employee
No.
KUWAIT NATIONAL PETROLEUM COMPANY
WORK PERMIT RISK ASSESSMENT
COLD HOT ENTRY
Note:
1. Master Copy (original) shall be retained in file for record and future reference
2. Photo copy shall be attached with work permit
3. Ref. no. guidance:- Example LOCATION – DEPT./DIV. RISK ANALYSIS – YEAR – SERIAL NO.e.g. 1.MAA – XXXXRA – 05-1001, 2. PRJ - XXXXRA – 05-
1001
4. If same Risk Assessment is being used again, it must be reviewed to check relevancy