You are on page 1of 1

*****************************************************************

ALLPILE 6
VERTICAL ANALYSIS SUMMARY OUTPUT
Copyright by CivilTech Software 2005
www.civiltech.com
(425) 453-6488 Fax (425) 453-5848
*****************************************************************
Licensed to
Date: 16/02/2023 File: C:\Users\awefe\OneDrive\Documents\GEDUNG 9 LANTAI.alp

Title 1: GEDUNG DI STADION MADYA SEMPAJA


Title 2: SQUARE PILE 40X40 CM

TOTAL LOADS:
Vertical Load, Q: 2500.0 -kN
Load Factor for Vertical Loads: 1.0
Loads Supported by Pile Cap: 0 %

PILE PROFILE:
Pile Length, L= 48.0 -m
Top Height, H= 0 -m
Slope Angle, As= 0
Batter Angle, Ab= 0.00 Batter Factor, Kbat= 1.00

SINGLE PILE:
Deduction factor due to Group Effect, R= 1.00
Vertical Load= 2500.00 -kN

Single Pile Vertical Analysis:


Results:
Total Ultimate Capacity (Down)= 19702.96-kN, Total Ultimate Capacity (Up)=
2384.93-kN
Total Allowable Capacity (Down)= 10959.46-kN, Total Allowable Capacity
(Up)= 1276.94-kN
At Work Load= 2500.00-kN, Settlement= 3.59179-cm
At Work Load= 2500.00-kN, Secant Stiffness Kqx= 696.03-kN/-cm
At Allowable Settlement= 2.000-cm, Capacity= 1392.07-kN
!!! Work Load, 2500.00-kN, Exceeds the Capacity at Allowable Settlement=
2.00-cm, Capacity (Down)= 1392.07-kN
Work Load, 2500.00-kN, OK with the Allowable Capacity (Down)= 10959.46-kN

____________________________________________
FACTOR OF SAFETY:
FSside FStip FSuplif FSweight
1.0 2.0 2.0 1.0

Note: If program can't find result or the result exceeds the up limits. The result
shows 9999.