You are on page 1of 46

INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

FAILURE SIGNS AND DIAGNOSIS FOR REUSE . . . . . . . . . . . 2


• Inspection points for parts reuse diagnosis
• Standards for reuse of track parts
• Failure signs and diagnosis for reuse
• Seals, bushings, spacers, links and pins

EXAMPLES OF FAILURE ANALYSES


OF SEALED & LUBRICATED TRACK . . . . . . . . . . . . . . . . . . 25

CONSTRUCTION AND FUNCTION . . . . . . . . . . . . . . . . . . . . . 28


• Structure of the sealed & lubricated track
• Materials and heat treatment
• Progress of wear and rebuilding of track

TECHNICAL POINTS REQUIRED


FOR AN "OIL TURN" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
• Functional requirements for lubrication of
pins, bushings, etc.
• Precautions for the sealing mechanism
• Precautions for the track link movement during travel

PREVENTIVE MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . 43
FORM NO. SEBG4091 Printed in Japan

You might also like