LEGENDS

SURVEYING AREA FOR MARKING

WORKING AREA

TEMPORARY SIGNBOARD +
FLASHERS

WORKING AREA

SHOP DRAWING

CLIENT:

MAIN CONTRACTOR:

PROJECT:

AL AIN PROJECT

DRAWING TITLE:
TRENCHING WORK

DRAWN: CHECKED: APPROVED: DATE:


MO YM ME 22-03-2023
DRAWING NO: REV:
YAS--DWG-10032023-001 00
2023-130711
NOTES:

LEGENDS

SURVEYING AREA FOR MARKING

WORKING AREA

TEMPORARY SIGNBOARD +
FLASHERS

CONSTRUCTION
VEHICLES ONLY
DETOUR AHEAD

SLOW DOWN
REDUCE
SPEED

100

TMA
STABILIZATION
ADVANCED WARNING AREA 1000M TRANSITION AREA 240M AREA 500M

SHOP DRAWING

CLIENT:

MAIN CONTRACTOR:

WORKING AREA
SLOW DOWN
DETOUR AHEAD

CONSTRUCTION
VEHICLES ONLY
REDUCE
SPEED

80

END
TMA

STABILIZATION
AREA 500M TRANSITION AREA 240M PROJECT:
STABILIZATION

AL AIN PROJECT
AREA 80M

DRAWING TITLE:

TRENCHING WORK

DRAWN: CHECKED: APPROVED: DATE:


MO YM ME 22-03-2023
DRAWING NO: REV:
YAS--DWG-10032023-001 00
2023-130711