Professional Documents
Culture Documents
# DATE BY DESCRIPTION
ANODE LAYOUT WITH HEADER WIRE ANODE LAYOUT WITH HEADER WIRE
CORROSION PROTECTION
STAGGERED LAYOUT - PLAN VIEW SCHEMATIC ALIGNED LAYOUT - PLAN VIEW SCHEMATIC
FUSION T2 ANODES
SHOP DRAWINGS
LAYOUT & NOTES
ANODE LAYOUT WITH INDIVIDUAL CONNECTION ANODE LAYOUT WITH INDIVIDUAL CONNECTION
GENERAL ANODE
STAGGERED LAYOUT - PLAN VIEW SCHEMATIC ALIGNED LAYOUT - PLAN VIEW SCHEMATIC
VECTOR CORROSION
TECHNOLOGIES
27A UPPER HIGH STREET
CRADLEY HEATH
BIRMINGHAM
WEST MIDLANDS
B64 5HX
PH: 01384 671400
VECTOR-CORROSION.EU
PROJECT NO.
-
DRAWING NO.
CP1.1
DRAWING REVISIONS
# DATE BY DESCRIPTION
2
T2 STANDARD-CP2.1
CORROSION PROTECTION
FUSION T2 ANODES
SHOP DRAWINGS
PLAN VIEW
GALVASHIELD FUSION T2 STANDARD ANODES WITH HEADER WIRE
1 SCALE: 6" = 1'-0"
1 1
CP-500-CP5.1 T2 STANDARD-CP2.2
ANODE INSTALLATION
FUSION T2 STANDARD
T2 STANDARD-
CP2.1
DRAWING REVISIONS
# DATE BY DESCRIPTION
CORROSION PROTECTION
FUSION T2 ANODES
SHOP DRAWINGS
ANODE INSTALLATION
FUSION T2 STANDARD
T2 STANDARD-
CP2.2
DRAWING REVISIONS
# DATE BY DESCRIPTION
CORROSION PROTECTION
FUSION T2 ANODES
SHOP DRAWINGS
2
T2 STANDARD-CP2.3
FUSION T2 STANDARD
DIRECT CONNECTION
INSTALLATION WITH
VECTOR CORROSION
PLAN VIEW SECTION VIEW TECHNOLOGIES
27A UPPER HIGH STREET
GALVASHIELD FUSION T2 STANDARD ANODE - DIRECT CONNECTION GALVASHIELD FUSION T2 STANDARD ANODE - DIRECT CONNECTION CRADLEY HEATH
T2 STANDARD-
CP2.3
DRAWING REVISIONS
# DATE BY DESCRIPTION
CORROSION PROTECTION
FUSION T2 ANODES
SHOP DRAWINGS
WIRE CONNECTION
DRILLED HEADER
SECTION
DRILLED CONNECTION TO REBAR
1 SCALE: 12" = 1'-0"
VECTOR CORROSION
TECHNOLOGIES
27A UPPER HIGH STREET
CRADLEY HEATH
BIRMINGHAM
WEST MIDLANDS
B64 5HX
PH: 01384 671400
VECTOR-CORROSION.EU
PROJECT NO.
-
DRAWING NO.
CP5.1