PT ASTAKA DODOL

2019

Uresources Group
Strictly Private and Confidential
MINE PROFILE

UresourcesGroup
Overview of the Group

 Uresources Group, hold four concession of 3rd generation CCOWs in South Sumatera
one of them is called: PT. Astaka Dodol (“Astaka”)
– Astaka concessions is located on the east coast of Sumatera, +/- 120 km to the north
west of Palembang city, South Sumatera province.
– Astaka concession can be reached by public road approximately 5 hours from
Palembang by car.
– Astaka commenced commercial production in 2018, by the end of 2019 the year-end
production amount is expected to reach 600 Thousand tons. In 2020 the target
production is 1.5 million tons.
– Astaka concession is divided into three Sub-Block (A, B, & C). Sub-Block C is most
suitable to be dedicated to serve Mine Mouth Power Plan projects. Sub-Block C of
Astaka’s coal reserves is sufficient to supply up to 1000 MW Coal fired power plant for
30 years.

 CCOW is a Coal Contract of Work signed with the Government of Republic Indonesia
which give a rights for the company to mine at the concession area for 30 years and
extendable for another 20 years.

UresourcesGroup
Strategic Locations
Located in South Sumatera. Mine site is strategically located to serve China, India,
Malaysia, Vietnam and Philippines market.

UresourcesGroup
Overview of Coal Characteristics

The Quality of the coal was analyzed at the coal chemistry laboratory of the
Directorate of Mineral Resources, Bandung.

In addition by aforesaid government institution, another analysis has also been


done by PT. Sucofindo, Carsurin, Geoservices,CCIC . The analysis employed
ASTM (American Standard for Testing Material) and BS (British Standard)
Methods.

Coal specifications for both concessions are as follows:

Astaka Dodol Astaka Dodol Astaka Dodol


Coal Quality Unit Parameters
Blok A3 Blok A2 Blok C
Calorific Value (Kcal/kg) gar 3,800 - 4,200 4,000 - 4,600 2,800 - 3,000
Total Moisture % ar 36 - 41 32 - 38 51.7
Inherent Moisture % adb 14.1 - 19 11 - 15 16.6
Ash Content % adb 4.1 - 5.1 4.0 - 5.5 6.6
Volatile Matter % adb 34 - 43 34 - 43 35 - 45
Total Sulphur % adb 0.14 - 0.50 0.40 - 0.60 0.19
HGI - 60 - 65 60 - 70 60 - 75

UresourcesGroup
COAL SPECIFICATION CERTIFICATE A2

UresourcesGroup
Large number of Certified Mineable Reserves

PT. Astaka Dodol * Coal Resources

785 Million Tons

PT. Astaka Dodol * Coal Reserves

256 Million Tons

Note:
* The JORC statement for Astaka only covers Block A and Block C. Block B has
not been explored as yet.

UresourcesGroup
CURRENT LOGISTICS OVERVIEW of ASTAKA

Key Improvements with At Musi River


new Connecting Road ASTAKA DODOL 1 20 km
MUSI Port
Privately Owned by Astaka
 With connecting road from
Astaka to “Baturona” (Part
of Ucoal Group Coal Mine), 2 180 km
logistic efficiencies will be
increased tremendously. 3 70 km
 Huge Potential to be a
dedicated Coal Toll Road DAWAS Port
BATURONA Privately Owned by Baturona
for other surrounding Coal (Ucoal Group Coal Mine) 4 30 km At Dawas River
Mine.

No Description Completion Date

1 2018 Completed
20 KM private road
and Operated
2 180 Province Road 2018 Operated

3 70 km planned connecting road to “Baturona” (Part of Ucoal Group Coal Future Investment
Mine concession) Plan
2012 Completed
4 30 km existing “Baturona” private road to Port Dawas and Operated for
“Baturona”

UresourcesGroup
CURRENT LOGISTIC OVERVIEW ASTAKA DODOL
MUSI BANYUASIN REGENCY

LOGISTIC OPTIONS
OVERVIEW

20 KM Private Road to
MUSI PORT at Musi River.

180 KM Province Road to


BATURONA PORT at
Dawas River.

UresourcesGroup
MACANG SAKTI VILLAGE – ASTAKA BLOCK A
Current Operation Pit

UresourcesGroup
INITIAL MINE PLAN – PIT A1 AND A2 for year 2020

Pit A2:
 Area 102 Ha
 SR 6.36
 Reserve 6.2 million ton
 GAR 4200 – 4400 kcal/kg

Pit A1_B:
• Area 41 Ha
• SR 5.8
• Reserve 2.5 million ton
• GAR 4500 – 4600 kcal/kg

Pit A1_A:
• Area 36 Ha
• SR 6.3
• Reserve 2 million ton
• GAR 4500 – 4600 kcal/kg

UresourcesGroup
CURRENT MINING OPERATION at BLOCK A2

UresourcesGroup
HAULING ROAD TO MUSI PORT CONSTRUCTION

UresourcesGroup
LOADING PORT CONSTRUCTION PHASE

UresourcesGroup
Thank You

PT ASTAKA DODOL