This Division came in to existence w.e.f. 1st Jan 1978. Mughalsarai Yard is spread in 12.5 Kms.
The Gaya-Mughalsarai section is the busiest section in the Indian Railways and in fact it is the life
line of the country. The administration is trying with utmost sincerity to improve the passenger
services in this section.
The important stations in this Division are Gaya, Dehri-on-Sone, Sasaram and Mughalsarai. Gaya
is an ancient city and is famous for VISHNU PAD TEMPLE and BUDHHA TEMPLE at BODH
GAYA. It attracts large number of Tourists throughout the year specially during PITRAPAKSH
MELA when the pilgrims visit Gaya from all over the country. Sasaram station is famous for the
TOMB OF SHERSHAH SURI. Mughalsarai is famous for connecting all parts of the country by
Rail Transport and is closer to the oldest and holiest city Varanasi. Thus, this section connects two
cultural cities of India.
More than 25.58 lakhs passengers travel per month from different stations of this division with an
average earning of Rs. 29.73 Cr. per month. Goods earning of the Division per month was Rs. 6.49
Cr.
1.1 Jurisdiction:
Route Track No. of block No. of
Section Route
Kms Kms Station station
(a) MGS - MPO (G. C. Section) ‘A’ 214.53 555.27 32 34
(b) KCA - MGS - VYN ‘B’ 12.86 25.72 - -
(c) SEB - GHD (B. D. Section) ‘D’ Spl. 90.20 180.40 13 13
(d) ARA - SSM Section ‘E’ 96.70 96.70 4 27
A, B, D - 521.20
(e) Loop & Siding
Spl & E
Total 414.29 1375.09 49 74
1
Operating at a glance up to August’2017.
1.5 Mughalsarai Division –Nature Of Operation:
Of all divisions on Indian Railways, Mughalsarai Division deals the most intense train operations –
both Goods and Coaching. It is the bridge between Eastern part and Northern part of India. It
closes the distance between pit head coal and power house, finished steel product to user, food
grain and fertilizer to eastern part of the country and other raw material to industries. The
operational efficiency of the Division plays a pivotal role in determining the efficiency of the East
Central Railway and any setback or inefficiency in operations on this Division is a sensitive matter
which affects the overall operations of the Railways. Because of its crucial importance, the
Railway Board keeps a special watch on Mughalsarai division’s operations.
Operationally, Mughalsarai Division can be divided into five important sectors-
Operation over Grand Chord section.
Operation in Sonnagar - Garwa Road Section (Commonly known as BD Section)
Operation in Mughalsarai Complex.
Operation in Gaya Complex.
Operation in Sasaram – Ara Section.
2
Operating at a glance up to August’2017.
Unloading of coal in the coal siding and oil in BPCL siding-
Av. No. of inward Coal/Clinker/Iron 16 rakes per month.
Av. No. of inward POL 25 rakes per month.
3
Operating at a glance up to August’2017.
Class of Stations No. of stations Station Names
GAQ, CDMR, SYJ, KMS, DGO, MTGE, PSE,
SSG, KMGE, KWD, PES, JHN, IMGE, PRY,
E 29 KSTA, MPO, BCJ, ANH, BSYA, KYF, HDN,
KVQ, SZF, URD, KRTA, SQS, GNK, BKJ, PIRO
& GQN.
F 31 -
1.5.13 Hospitals:
128 beds Hospital with ICU and OT at MGS.
46 beds Hospital with OT at GYA.
6 Health Units.
37 Untari Road URD 335.31 6.21 "B" & III Palamau Jharkhand
38 Sat Bahini SZF 340.24 4.93 "B" & III Palamau Jharkhand
43 Kajrat Nawadih KYF 373.46 7.45 "B" & III Palamau Jharkhand
44 Nabinagar Road NBG 381.84 8.38 "B" & III Aurangabad Bihar
45 Barki Salaiya BSYA 389.23 7.39 "B" & III Aurangabad Bihar
46 Ankorah ANH 395.91 6.68 "C" & III Aurangabad Bihar
47 Bagaha Bishnupur BCJ 403.97 8.06 "B" & III Aurangabad Bihar
Tunnel: SZF - MDJ (UP direction) 109 Mtrs. and MDJ - SZF (DN direction) 152 Mtrs.
SSM-ARA Section-
Sl. Station Distance Inter station Class & Std. Civil
Name of station State
No. Code from ARA distance of interlocking Districts
48 Udwant Nagar Halt UWNR 6.03 6.03 D Bhojpur Bihar
49 Garahani GQN 18.75 9.05 D Bhojpur Bihar
6
Operating at a glance up to August’2017.
50 Samram Halt SRMN 24.01 5.26 D Bhojpur Bihar
51 Charpokhari Halt CRQ 29.60 5.59 D Bhojpur Bihar
52 Nagari Halt NGIM 33.07 3.47 D Bhojpur Bihar
53 Piro PIRO 38.65 5.58 "B" & III Bhojpur Bihar
Jharkhand Mahadeo
54 JKMH 41.96 3.31 D Bhojpur Bihar
Halt
55 Nonar Halt NON 43.36 1.40 D Bhojpur Bihar
56 Hasan Bazar HSB 44.96 1.60 D Bhojpur Bihar
57 Hasan Bazar Stn Halt HBSH 47.25 2.29 D Bhojpur Bihar
Bhojpur-Rohtash
58 BRBH 49.40 2.15 D Rohtash Bihar
Border Halt
59 Shiv Pur Halt SVPH 51.59 2.19 D Rohtash Bihar
60 Bikram Ganj BKJ 56.32 4.73 "B" & III Rohtash Bihar
61 Shahid Baba Parav Halt SBPS 58.60 2.28 D Rohtash Bihar
62 Ghosia Halt GAHJ 59.90 1.30 D Rohtash Bihar
63 Ghosia Kalan Halt GSK 61.70 1.80 D Rohtash Bihar
64 Mani Halt MANI 64.45 2.75 D Rohtash Bihar
65 Bairi Halt BRIH 65.55 1.10 D Rohtash Bihar
66 Sanjhauli Halt SJV 68.75 3.20 D Rohtash Bihar
67 Samhauta Halt SAHT 73.10 4.35 D Rohtash Bihar
68 Garh Nokha GNK 77.52 4.42 "B" & III Rohtash Bihar
69 Chanka Halt CKHT 83.60 6.08 D Rohtash Bihar
70 Baraw More Halt BNHT 85.42 1.82 D Rohtash Bihar
71 Khairadih Halt KADH 87.09 1.67 D Rohtash Bihar
72 Agrer Halt AERH 89.71 2.62 D Rohtash Bihar
73 Mokar Halt MKHS 91.86 2.15 D Rohtash Bihar
Sasaram SSM 97.20 5.34
7
Operating at a glance up to August’2017.
2 576 2 508 2 305 2 353
3 569 3 508 3 305 3
4 518 4 555 4 300 4
5 393 1 234 1 366 1 350
14 KMGE
6 393 2 236 28 GRRU 2 363 2 350
34 ANH
7 1 268 3 363 3 350
8 2 544 1 300 4
15 SSM
1 443 3 544 2 464 1 350
29 PRY
2 351 4 544 3 464 2 352
35 BSYA
2 GAQ 3 245 1 250 4 300 3 350
4 245 2 462 1 304 4
16 KWD
5 351 3 462 2 304 1 432
30 KSTA
1 472 4 250 3 304 36 NBG 2 400
2 437 1 277 4 304 3 432
17 PHE
3 CDMR 3 590 2 242 1 725 1 348
4 590 1 274 2 692 2 348
37 KYF
5 437 2 588 3 684 3 348
1 484 3 570 4 500 4
18 DOS
2 385 4 570 31 GYA 5 385 1 310
4 SYJ 3 545 5 588 6 252 38 JPL 2 400
4 545 6 265 7 250 3 310
5 385 1 400 8 394 1 400
1 448 2 400 9 484 2 400
19 SEB 39 HDN
2 401 3 400 1 395 3 400
5 KMS
3 401 4 400 32 MPO 2 305 4
4 448 1 280 3 305 1 351
20 CPBH
1 275 2 330 2 361
6 DCX 40 KVQ
2 305 1 598 3 351
1 246 2 580 4
21 AUBR
2 416 3 580 1 400
7 DGO
3 416 4 598 41 MDJ 2 400
4 246 1 300 3 400
1 592 2 300 1 352
22 PES
2 585 3 300 2 352
8 BBU 42 SZF
3 585 4 300 3 352
4 592 1 245 4
1 301 23 BHKH 2 245 1 352
9 MTGE
2 294 3 2 352
43 URD
1 307 1 340 3 352
2 395 2 300 4
10 PSE 24 JHN
3 395 3 300 1 350
4 307 4 2 350
44 KRTA
1 377 1 200 3 350
25 DRD
2 385 2 200 ARA-SSM Section 4 350
11 KTQ
3 385 1 560 46 GNK 1 300 1 350
4 377 2 560 47 BKJ 1 300 2 350
26 RFJ 45 SQS
1 303 3 560 48 PIRO 1 300 3 350
12 KVD
2 318 4 560 49 GQN 1 300 4
1.5.19 Level Crossing Gate:
1.5.20 Bridges:
(b)Class of Bridge-
Line Important Major Minor Fly Over
GC (UP & DN) 3 40 420 16 (MGS – East & West)
III Nil 12 156 ~
BD Nil 26 188 12 (SEB)
ARA-SSM Nil 12 169 ~
Total 3 90 933 28
1.5.21 Curves:
Sl.
Description of Curve GC Section BD Section Ara – Sasaram
No
1 Curve < 0.5o 21 1 1
2 ≥ 0.5o Curve < 1o 69 25 3
3 Curve ≥ 1o 23 33 36
9
Operating at a glance up to August’2017.
Total 113 59 40
10
Operating at a glance up to August’2017.
2005-06 150.9 2.79 20.82 183.6 -0.49 12.85 334.5 0.97 16.31
2006-07 153.1 1.46 22.58 184.3 0.38 13.28 337.4 0.87 17.32
2007-08 161.6 5.55 29.38 185.5 0.65 14.01 347.1 2.87 20.69
2008-09 167.8 3.84 34.35 195.8 5.55 20.34 363.6 4.75 26.43
2009-10 176.6 5.24 41.39 206.1 5.26 26.67 382.7 5.25 33.07
2010-11 184.0 4.19 47.32 215.8 4.71 32.64 399.8 4.47 39.01
2011-12 195.3 6.14 56.37 226.4 4.91 39.15 421.7 5.48 46.63
2012-13 203.0 3.94 62.53 230.9 1.99 41.92 433.9 2.89 50.87
2013-14 210.7 3.79 68.69 235.8 2.12 44.93 446.5 2.90 55.25
2014-15 210.0 -0.33 68.13 233.0 -1.19 43.21 443.0 -0.78 54.03
2015-16 207.6 -1.14 66.21 239.6 2.83 47.26 447.2 0.95 55.49
2016-17 209.5 0.92 67.73 222.1 -7.30 36.51 431.6 -3.49 50.07
2017-18
2.1.1 Originating Loading: Wagon (in EWU) & Weight (in MT)--
Division has achieved 10.96% unprecedented improvement in originating loading during 2017-18
(April–August). Loading was 0.506 MT (7946 wagons) as compared to 0.456 MT (7146 wagons) in
same period of previous year, which includes Cement loading 0.319 MT (5014 wagons) as compared
11
Operating at a glance up to August’2017.
to 0.313 MT (4891 wagons) in same period of previous year i.e. 1.92% improvement. Details are
tabulated below-
2013-14 2014-15 2015-16 2016-17 2017-18 %age Imp.
Commodity
(Apr-Aug) (Apr-Aug) (Apr-Aug) (Apr-Aug) (Apr-Aug) over LY
Wagon 0 334 3327 4891 5014 2.51
Cement
Weight 0.000 0.021 0.208 0.313 0.319 1.92
Food Wagon 2065 250 2139 1637 1086 -33.66
Grains Weight 0.129 0.016 0.132 0.103 0.066 -35.92
Others incl. Wagon 2218 1036 786 618 1846 198.71
RMC Weight 0.142 0.066 0.051 0.040 0.121 202.50
Wagon 4283 1620 6252 7146 7946 11.20
Total
Weight 0.271 0.103 0.391 0.456 0.506 10.96
(Originating loading of the Division was deteriorated in month of July’17 and August’17 mainly on
account of poor indent placed by parties due to heavy flood and incessant rain in north Bihar areas.)
12
Operating at a glance up to August’2017.
Lost in nos. 10561 10027 3258 3699 13.54
Mail/Exp trains
Punc. %age 77.17 78.48 83.66 80.81 -3.40
In wagons 17034 19935 7146 7946 11.20
Freight Loading:
Weight in MT 1.067 1.265 0.456 0.506 10.96
Freight Operation:
Wagon turn-round In Day 0.95 0.92 0.86 0.98 13.95
All wagons holding Wagons/Day 4612 4065 3742 4584 22.50
BOX’N holding In Rake/Day 37.7 34.6 30.0 39.5 31.67
JUMBO holding In Rake/Day 15.2 16.2 14.7 15.4 4.76
BOBR holding In Rake/Day 3.4 2.2 1.9 3.1 63.16
Interchange with Adjacent Railways / Divisions:
Wagons/Day 4074 3764 3875 3779 -2.48
North Central
Trains/Day 78.3 73.2 75.1 73.2 -2.53
Wagons/Day 2170 1808 1607 1755 9.21
Northern
Trains/Day 38.4 32.0 28.7 31.3 9.06
North Central + Wagons/Day 6244 5572 5482 5534 0.95
Northern Trains/Day 116.7 105.2 103.8 104.5 0.67
Wagons/Day 3005 2715 2666 2528 -5.18
DHN Divn at MPO
Trains/Day 58.4 53.7 53.1 49.6 -6.59
Wagons/Day 3009 2687 2608 2971 13.92
DHN Divn at GHD
Trains/Day 51.9 46.3 45.3 51.3 13.25
DHN Divn at MPO + Wagons/Day 6014 5402 5274 5499 4.27
GHD Trains/Day 110.3 100.0 98.4 100.9 2.54
DNR Divn via --- Wagons/Day 554 762 650 1028 58.15
ML+KG+PG+AS Trains/Day 12.5 16.9 14.7 21.2 44.22
Wagons/Day 12812 11736 11406 12061 5.74
Throughput
Trains/Day 239.5 222.1 216.9 226.6 4.47
UP receipts at MGS Wagons/Day 2818 2443 2379 2552 7.27
(Ex GC) Trains/Day 54.2 48.0 47.7 48.4 1.47
DN dispatches from Wagons/Day 2951 2625 2621 2626 0.19
MGS (To GC) Trains/Day 55.3 49.3 49.4 48.2 -2.43
Engine Utilization:
Electric engine kms Kms 481 497 496 499 0.60
Electric engine holding Nos. 78.50 71.41 69.01 70.63 2.35
Diesel engine kms Kms 377 371 376 356 -5.32
Diesel engine holding Nos. 13.76 13.19 12.84 15.46 20.40
14
Operating at a glance up to August’2017.
8 Gateman 130 71 59
9 Porter 397 680 +283
Total 2675 2061 614
4.0 Performance:
4.1.1 Punctuality of Mail/Exp trains: (As per COIS and new concept of one minute punctuality loss)
Punctuality of Mail/Exp trains was 80.81% during 2017-18 up to August as compared to 83.66% in
corresponding period of previous year. Details are-
15
Operating at a glance up to August’2017.
2016-17 2017-18 % Var.
Mail/Exp trains 2015-16 2016-17
(Apr-Aug) (Apr-Aug) over LY
Mail/Express run (Nos.) 46268 46603 19936 19278 -3.30
Lost punctuality (Nos.) 10561 10027 3258 3699 13.54
Punctuality (%age) 77.17 78.48 83.66 80.81 -3.40
4.2.1 Commodity wise Originating Freight Loading: (Wagon in EWU and Weight in MT)
2016-17 2017-18
2015-16 2016-17 % Var. over LY
Commodity (Apr-Aug) (Apr-Aug)
Wagon Weight Wagon Weight Wagon Weight Wagon Weight Wagon Weight
Cement 6696 0.417 10900 0.700 4891 0.313 5014 0.319 2.51 1.92
Grains &
8675 0.543 6630 0.409 1637 0.103 1086 0.066 -33.66 -35.92
Pulses
17
Operating at a glance up to August’2017.
Sand - - 175 0.012 - - 931 0.061 100.00 100.00
Others 42 0.003 527 0.035 58 0.004 18 0.001 -68.97 -75.00
RMC 1621 0.104 1703 0.109 560 0.036 897 0.059 60.18 63.89
Total 17034 1.067 19935 1.265 7146 0.456 7946 0.506 11.20 10.96
4.2.2 Month wise Freight Loading: (Wagon in 8Wh and Weight in MT)
2016-17 2017-18
Month
2015-16 2016-17 % Var. over LY
(Apr-Aug) (Apr-Aug)
Wagon Weight Wagon Weight Wagon Weight Wagon Weight Wagon Weight
Apr 1485 0.094 998 0.063 998 0.063 1622 0.105 62.53 66.67
May 934 0.058 1514 0.095 1514 0.095 2125 0.134 40.26 41.05
Jun 1389 0.086 1663 0.106 1663 0.106 1911 0.123 14.91 19.04
Jul 1342 0.084 1580 0.103 1580 0.103 1616 0.102 2.28 -0.97
Aug 1102 0.069 1391 0.088 1391 0.088 672 0.042 -51.69 -52.27
Sep 1344 0.083 1066 0.067
Oct 1078 0.067 1383 0.088
Nov 785 0.049 1152 0.076
Dec 2328 0.147 1438 0.089
Jan 2117 0.133 3436 0.216
Feb 2064 0.130 2281 0.144
Mar 1067 0.067 2033 0.129
Total 17034 1.067 19935 1.265 7146 0.456 7946 0.506 11.20 10.96
4.2.4 Rail coefficient in Cement loading by Shri Cement AUBR: (In MT)
2015-16 2016-17 2017-18
Month Productio Productio Productio
By Rail By Rail By Rail By Rail By Rail By Rail
n n n
(in MT) (in %age) (in MT) (in %age) (in MT) (in %age)
(in MT) (in MT) (in MT)
Apr. 0.134767 0.045002 33.39 0.192529 0.030681 15.94 0.290257 0.058358 20.11
May 0.136511 0.044269 32.43 0.215093 0.065557 30.48 0.292126 0.094229 32.26
Jun. 0.145557 0.043505 29.89 0.241394 0.065551 27.16 0.282046 0.068390 24.24
Jul. 0.115633 0.036041 31.17 0.218469 0.080823 37.00 0.221915 0.052993 23.87
Aug. 0.118230 0.033062 27.96 0.211719 0.070390 33.25 0.134849 0.016925 12.55
18
Operating at a glance up to August’2017.
Sep. 0.138536 0.030388 21.94 0.122578 0.045405 37.04
Oct. 0.140081 0.032585 23.26 0.225317 0.076113 33.78
Nov. 0.109883 0.017707 16.11 0.190769 0.062321 32.67
Dec. 0.172656 0.031440 18.21 0.185059 0.042554 22.99
Jan. 0.199886 0.030695 15.36 0.223258 0.049942 22.37
Feb. 0.187758 0.021018 11.19 0.112311 0.029231 26.03
Mar. 0.165089 0.022342 13.53 0.266801 0.085630 32.10
Total 1.764587 0.388054 21.99 2.405297 0.704198 29.28 1.221193 0.290895 23.82
4.2.5 Terminal wise Average Time Taken of Inward Rake: (Per rake in Hrs. - Min.)-
GYA GYA AUBR MGS MGS
Year MPO SEB DOS SSM BBU Total
(GS) (FCI) (GS) (POL)
2015-16
No. of Rake 2 249 63 0 216 181 239 67 92 197 1306
No. of wgn 83 7317 2472 0 12247 7412 9251 3084 5002 9695 56563
Arr. – Place 5:53 9:45 7:36 0:00 5:48 1:13 3:39 2:15 0:19 6:20 5:08
Place - Rel. 31:15 13:51 13:50 0:00 14:42 15:26 14:21 22:07 20:16 12:41 15:01
Rel. -Disp. 6:38 23:59 16:47 0:00 6:39 11:29 3:54 5:33 2:53 1:58 9:35
Arr. – Disp. 43:46 47:35 38:13 0:00 27:09 28:08 21:54 29:55 23:28 20:59 29:44
2016-17
No. of Rake 3 277 69 0 192 166 302 54 92 230 1385
No. of wgn 63 6795 2565 0 10653 5632 10808 2061 5248 11349 55174
Arr. – Place 2:15 7:49 11:22 0:00 8:45 1:02 2:38 2:14 1:29 6:30 5:19
Place - Rel. 18:23 12:08 12:05 0:00 14:56 15:16 14:23 17:45 25:06 12:11 14:29
Rel. -Disp. 2:58 16:51 17:02 0:00 4:48 6:31 2:41 7:18 3:23 2:00 7:06
Arr. – Disp. 23:36 36:48 40:29 0:00 28:29 22:49 19:42 27:17 29:58 20:41 26:54
2016-17
(Apr-Aug)
No. of Rake 1 123 31 0 46 82 115 30 34 96 558
No. of wgn 21 2753 999 0 2551 2686 4073 1128 1909 4713 20833
Arr. – Place 1:52 7:07 8:51 0:00 6:36 1:01 2:49 2:35 0:53 6:31 4:39
Place - Rel. 17:30 11:52 13:05 0:00 15:16 15:23 14:44 19:29 34:41 12:48 15:18
Rel. -Disp. 2:45 20:24 20:40 0:00 4:40 7:08 2:46 7:47 2:37 1:50 8:33
Arr. – Disp. 22:07 39:23 42:36 0:00 26:32 23:32 20:19 29:51 38:11 21:09 28:30
2017-18
(Apr-Aug)
No. of Rake 0 84 27 8 100 54 106 8 72 123 582
No. of wgn 0 3033 1274 399 5523 2226 4317 360 4184 6125 27441
Arr. – Place 0:00 8:08 8:12 4:06 6:16 0:47 1:37 4:13 1:09 6:50 4:42
Place - Rel. 0:00 17:57 14:05 25:58 13:49 15:05 15:49 16:58 30:46 11:27 16:43
Rel. -Disp. 0:00 10:33 16:06 3:41 3:33 5:58 2:31 3:57 3:34 1:51 4:50
Arr. – Disp. 0:00 36:38 38:23 33:45 23:38 21:50 19:57 25:08 35:29 20:08 26:15
4.2.6 Wagon holding (Wagon in EWU/Day) & Wagon turn round (In Day):
2015-16 2016-17 2016-17 2017-18 % Var. over LY
Month
WB WTR WB WTR WB WTR WB WTR WB WTR
Apr. 4774 1.03 3905 0.80 3905 0.80 4139 0.90 5.99 12.50
May 4982 1.20 3296 0.79 3296 0.79 4320 0.92 31.07 16.46
Jun. 4948 1.09 3787 0.90 3787 0.90 4698 0.99 24.06 10.00
Jul. 4682 0.97 3781 0.87 3781 0.87 4698 1.05 24.25 20.69
Aug. 4310 0.88 3939 0.92 3939 0.92 4884 1.05 23.99 14.13
19
Operating at a glance up to August’2017.
Sep. 4629 0.95 3405 0.83
Oct. 4656 0.92 3814 0.93
Nov 4726 0.90 4512 1.02
Dec. 4552 0.93 4250 0.98
Jan. 4171 0.84 5093 1.05
Feb. 4282 0.77 4619 1.00
Mar. 4631 0.91 4377 0.90
Avg. 4612 0.95 4065 0.92 3742 0.86 4548 0.98 21.54 13.95
21
Operating at a glance up to August’2017.
Oct. 29.5 29.7 27.0 27.4
Nov 30.1 27.7 25.4 27.8
Dec. 26.9 27.4 23.7 24.8
Jan. 27.0 29.1 28.5 28.0
Feb. 28.8 30.2 27.1 30.5
Mar. 30.4 32.5 27.2 29.5
Avg. 29.0 29.4 25.6 28.1 24.8 28.3 24.9 24.7 0.40 -12.72
22
Operating at a glance up to August’2017.
Oct. 0.7 2.4 2.2 3.4
Nov 0.5 1.9 2.6 2.7
Dec. 0.8 2.3 2.8 2.9
Jan. 0.9 2.9 4.7 2.7
Feb. 1.8 2.8 4.3 3.3
Mar. 1.8 2.6 4.1 4.0
Avg. 1.0 2.1 3.0 3.1 2.5 3.1 2.7 2.7 8.00 -12.90
4.3.10 Up receipts & Down dispatch at/from MGS through GC section: (Trains/day)-
Month
2015-16 2016-17 2016-17 2017-18 % Var. over LY
Ex GC To GC Ex GC To GC Ex GC To GC Ex GC To GC Ex GC To GC
Apr. 57.7 56.2 46.1 50.6 46.1 50.6 46.3 46.4 0.43 -8.30
May 49.8 52.3 46.0 47.8 46.0 47.8 46.9 45.1 1.96 -5.65
Jun. 53.7 55.9 49.3 48.1 49.3 48.1 50.8 50.4 3.04 4.78
Jul. 56.3 58.2 50.0 50.4 50.0 50.4 48.4 48.8 -3.20 -3.17
Aug. 55.2 56.4 47.0 50.0 47.0 50.0 49.5 50.1 5.32 0.20
Sep. 56.2 56.7 45.8 47.1
23
Operating at a glance up to August’2017.
Oct. 55.5 55.8 49.5 47.7
Nov 55.7 54.1 50.4 51.8
Dec. 50.9 52.3 44.4 44.3
Jan. 51.3 54.6 50.1 48.4
Feb. 52.3 53.2 49.6 51.8
Mar. 55.7 57.8 50.9 54.1
Avg. 54.2 55.3 48.3 49.3 47.7 49.4 48.4 48.2 1.47 -2.43
4.3.12 Formation of Long Haul at MGS and made over to NCR, MPO & BRWD):
Month 2015-16 2016-17 2017-18
NCR MPO BRWD Total NCR MPO BRWD Total NCR MPO BRWD Total
Apr. 0 0 126 126 0 0 102 102 15 0 16 31
May 32 0 60 92 0 0 114 114 11 0 11 22
Jun. 8 0 36 44 3 0 134 137 31 1 35 67
Jul. 31 0 60 91 1 0 79 80 31 0 74 105
Aug. 46 1 45 92 0 0 100 100 6 0 40 46
Sep. 50 3 115 168 0 0 96 96
Oct. 42 7 61 110 11 0 56 67
Nov. 43 4 85 132 0 0 3 3
Dec. 16 1 66 83 0 0 26 26
Jan. 5 2 90 97 0 0 12 12
Feb. 0 0 110 110 13 0 16 28
Mar. 0 0 103 103 13 0 23 36
Total 273 18 957 1248 41 0 761 802 91 1 176 271
4.3.13 Running of Freight Trains by Electric Traction: Freight trains run by electric traction
started since 24.01.2013 between MGS-LKO-MGS via SLN-
Taken over per day Made over per day Total per day
Month All T/G By Elec. Traction All T/G By Elec. Traction All T/G By Elec. Traction
Nos. Nos. %age Nos. Nos. %age Nos. Nos. %age
2015-16
Apr 20.0 2.1 10.50 20.5 4.2 20.33 40.5 6.3 15.47
May 18.8 2.3 12.01 18.8 3.4 18.02 37.6 5.6 15.01
Jun 20.0 2.7 13.50 19.6 3.8 19.39 39.6 6.5 16.41
Jul 19.8 3.0 15.31 19.7 4.2 21.12 39.5 7.2 18.21
24
Operating at a glance up to August’2017.
Aug 18.5 3.2 17.44 18.8 4.5 23.85 37.3 7.7 20.67
Sep 20.3 3.5 17.43 20.2 5.3 26.19 40.5 8.8 21.81
Oct 20.2 3.5 17.33 19.5 5.0 25.64 39.7 8.5 21.41
Nov 19.9 2.8 14.07 20.7 4.7 22.70 40.6 7.5 18.47
Dec 18.9 2.0 10.76 18.1 3.0 16.78 36.9 5.1 13.70
Jan 18.5 4.4 23.51 16.4 4.5 27.13 34.9 8.8 25.21
Feb 18.2 4.9 26.92 17.0 5.6 32.94 35.2 10.5 29.83
Mar 19.3 4.3 22.28 19.2 4.8 25.00 38.5 9.1 23.64
Total 19.4 3.2 16.65 19.0 4.4 23.14 38.4 7.6 19.87
2016-17
April 15.0 3.6 24.00 13.3 3.5 26.32 28.3 7.1 25.09
May 12.5 0.8 6.40 12.0 1.2 10.00 24.5 2.0 8.16
Jun 13.9 3.6 25.90 15.4 5.1 33.12 29.3 8.7 29.69
July 15.1 4.5 29.67 16.2 6.3 38.85 31.3 10.8 34.42
Aug 15.4 5.1 32.96 14.7 6.5 44.23 30.1 11.6 38.48
Sep 14.1 6.0 42.86 13.9 8.1 58.15 28.0 14.1 50.46
Oct 14.6 5.9 40.82 14.1 7.9 56.19 28.7 13.9 48.40
Nov 18.3 6.1 33.44 17.5 7.8 44.48 35.8 13.9 38.83
Dec 16.3 5.2 31.80 15.5 7.0 45.11 31.8 12.2 38.28
Jan 18.6 6.6 35.36 18.6 8.6 46.27 37.2 15.2 40.81
Feb 20.1 6.6 33.08 19.0 7.8 41.09 39.0 14.4 36.97
Mar 21.7 7.4 34.10 19.1 8.3 43.46 40.8 15.7 38.48
Total 16.3 5.1 31.43 15.8 6.5 41.26 32.1 11.6 36.26
2017-18
April 16.7 3.8 22.93 14.9 5.3 35.77 31.6 9.2 28.99
May 13.5 3.1 22.96 15.0 6.1 40.67 28.5 9.2 32.28
Jun 15.6 4.5 28.85 16.1 7.0 43.48 31.7 11.5 36.28
July 15.1 3.9 26.10 14.7 4.9 33.58 29.8 8.9 29.80
Aug 18.6 5.3 28.22 16.8 5.6 33.45 35.4 10.9 30.70
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Total 15.90 4.12 25.94 15.50 5.80 37.40 31.40 9.92 31.60
4.3.14 Freight Train Run via Platform Line at MGS (Nos. Per Day):
Ex ALD To ALD To LKO
2015-16 % Via % Via % Via
Total Via PF Total Via PF Total Via PF
PF PF PF
Apr 39.9 15.2 38.10 39.9 5.8 14.54 20.0 3.4 17.00
May 36.7 15.2 41.42 33.7 3.4 10.09 18.8 4.0 21.28
Jun 39.7 17.2 43.32 37.0 4.3 11.62 20.0 4.9 24.50
Jul 41.8 21.0 50.24 39.9 7.2 18.05 19.8 5.1 25.76
Aug 41.5 22.5 54.22 38.5 7.0 18.18 18.5 5.8 31.35
Sep 40.8 18.2 44.61 38.9 4.1 10.54 20.2 6.3 31.19
25
Operating at a glance up to August’2017.
Oct 39.8 17.8 44.72 38.6 3.9 10.10 19.5 6.1 31.28
Nov 38.6 18.5 47.92 37.4 2.9 7.75 20.7 6.4 30.92
Dec 38.3 18.3 47.78 36.9 2.8 7.59 18.1 6.2 34.25
Jan 41.5 21.4 51.57 38.9 7.2 18.51 16.4 7.9 48.17
Feb 38.8 22.7 58.51 39.9 3.8 9.52 17.0 9.8 57.65
Mar 43.2 21.4 49.54 39.5 3.7 9.37 19.3 5.5 28.50
Average 40.1 19.1 47.73 38.3 4.7 12.22 19.0 6.0 31.26
2016-17
Apr 39.7 21.8 54.91 35.7 4.1 11.48 13.3 6.2 46.62
May 38.4 21.0 54.69 36.8 6.0 16.30 12.0 6.0 50.00
Jun 38.3 18.8 49.01 36.6 2.9 7.84 15.4 5.9 38.51
Jul 39.3 21.0 53.44 37.0 2.4 6.49 15.9 4.6 28.93
Aug 38.4 21.1 54.95 35.1 2.2 6.24 14.7 4.5 30.75
Sep 37.4 21.0 56.23 34.3 2.0 5.74 13.9 3.6 25.90
Oct 36.7 19.8 53.87 37.5 1.5 4.05 14.1 3.1 21.66
Nov 36.8 20.0 54.43 35.8 1.4 3.91 17.5 3.0 17.14
Dec 32.5 16.3 50.15 32.1 1.1 3.43 15.5 3.0 19.35
Jan 35.5 17.0 47.95 34.9 3.3 9.34 18.6 2.7 14.40
Feb 38.6 21.7 56.24 35.2 3.8 10.65 19.0 5.0 26.53
Mar 39.2 22.7 57.91 37.0 2.1 5.68 19.1 4.6 24.08
Average 37.6 20.2 53.73 35.7 2.7 7.63 15.8 4.4 27.63
2017-18
Apr 36.3 20.5 56.47 36.2 2.1 5.80 14.9 3.7 24.83
May 37.4 19.0 50.80 36.3 0.9 2.48 15.0 2.5 16.67
Jun 37.8 19.8 52.38 38.2 2.1 5.50 16.1 2.2 13.66
Jul 37.4 17.4 46.50 36.5 3.4 9.37 14.7 2.1 14.01
Aug 34.9 18.5 53.01 34.9 4.5 12.89 16.8 0.9 5.36
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Average 36.8 19.0 51.79 36.4 2.6 7.15 15.5 2.8 18.32
26
Operating at a glance up to August’2017.
Sep 607 95 15.65 34 5.60 129 21.25
Oct 603 90 14.93 35 5.80 125 20.73
Nov 621 102 16.43 47 7.57 149 23.99
Dec 560 55 9.82 38 6.79 93 16.61
Jan 508 62 12.20 10 1.97 72 14.17
Feb 493 97 19.68 23 4.67 120 24.34
Mar 597 106 17.76 42 7.04 148 24.79
Total 6968 996 14.29 369 5.30 1365 19.59
2016-17
April 399 72 18.05 8 2.01 80 20.05
May 372 8 2.15 35 9.41 43 11.56
Jun 461 88 19.09 22 4.77 110 23.86
Jul 502 113 22.51 28 5.58 141 28.09
Aug 457 142 31.07 13 2.84 155 33.92
Sep 418 177 42.34 13 3.11 190 45.45
Oct 438 186 42.47 13 2.97 199 45.43
Nov 524 186 35.50 11 2.10 197 37.60
Dec 479 155 32.36 14 2.92 169 35.28
Jan 577 164 28.42 12 2.08 176 30.50
Feb 531 125 23.54 12 2.26 137 25.80
Mar 592 123 20.78 14 2.36 137 23.14
Total 5750 1539 26.77 195 3.39 1734 30.16
2017-18
April 447 70 15.66 6 1.34 76 17.00
May 465 78 16.77 12 2.58 90 19.35
Jun 482 92 19.09 17 3.53 109 22.61
Jul 456 57 12.50 13 2.85 70 15.35
Aug 520 83 15.96 22 4.23 105 20.19
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Total 2370 380 16.03 70 2.95 450 18.99
5.1 Engine Holding Per Day & Engine KMs per Engine Per Day:
28
Operating at a glance up to August’2017.
Sep. 85.50 63.43 456 512
Oct. 80.84 61.29 486 565
Nov 79.04 79.57 489 467
Dec. 71.43 78.46 481 475
Jan. 66.91 76.28 515 521
Feb. 72.87 79.20 498 481
Mar. 85.59 73.65 461 486
Avg. 78.50 71.41 70.63 482 497 502
6.0 Detention:
6.2 Detention to Through Goods Trains (Transit Time of SPSL) at MGS & GAYA:
6.2.1 GAQ-JEP:
2015-16 2016-17 2017-18
Month
Av. load Av. Detn Av. load Av. Detn Av. load Av. Detn
Apr. 31.9 5:03 25.5 4:18 24.6 6:08
May 27.4 4:44 27.6 3:27 26.2 5:32
Jun. 29.0 4:05 28.0 5:05 27.6 5:07
Jul. 31.8 3:31 28.9 5:29 26.6 4:26
Aug. 31.2 3:31 26.9 4:03 26.5 5:04
32
Operating at a glance up to August’2017.
Sep. 31.3 4:13 25.5 3:57
Oct. 30.8 4:18 26.9 5:37
Nov 29.5 5:06 25.2 6:49
Dec. 27.7 4:31 22.0 6:43
Jan. 30.1 3:25 22.5 7:13
Feb. 29.5 4:52 23.4 5:23
Mar. 31.2 5:38 25.5 5:17
Avg. 30.1 4:24 25.7 5:16 26.3 5:15
6.2.2 JEP-GAQ:
2015-16 2016-17 2017-18
Month
Av. load Av. Detn Av. load Av. Detn Av. load Av. Detn
Apr. 25.5 1:27 24.4 1:19 20.8 1:18
May 23.7 1:33 24.8 1:17 21.8 1:16
Jun. 26.1 1:38 23.4 1:18 23.1 1:16
Jul. 28.7 1:24 25.0 1:18 21.3 1:38
Aug. 28.3 1:18 24.6 1:17 21.8 1:39
Sep. 25.4 1:27 24.0 1:20
Oct. 25.2 1:28 22.4 1:20
Nov 23.8 1:24 22.2 1:18
Dec. 22.8 1:19 18.3 1:30
Jan. 26.2 1:24 18.4 1:19
Feb. 24.7 1:23 22.0 1:26
Mar. 26.1 1:26 22.1 1:19
Avg. 25.5 1:25 22.6 1:20 21.8 1:25
6.2.3 MPO-KSTA:
2015-16 2016-17 2017-18
Month
Av. load Av. Detn Av. load Av. Detn Av. load Av. Detn
Apr. 27.7 0:41 22.3 0:37 19.4 0:37
May 26.1 0:42 21.5 0:36 20.8 0:37
Jun. 28.0 0:44 21.8 0:39 22.6 0:37
Jul. 28.4 0:40 25.5 0:37 23.3 0:38
Aug. 28.0 0:40 22.4 0:37 23.9 0:37
Sep. 29.9 0:39 21.8 0:36
Oct. 28.7 0:39 24.8 0:34
Nov 29.0 0:37 23.2 0:35
Dec. 25.2 0:36 21.1 0:37
Jan. 25.1 0:40 25.8 0:38
Feb. 26.9 0:36 23.9 0:36
Mar. 28.7 0:38 22.5 0:43
Avg. 27.6 0:39 23.1 0:37 22.0 0:37
6.2.4 KSTA-MPO
2015-16 2016-17 2017-18
Month
Av. load Av. Detn Av. load Av. Detn Av. load Av. Detn
Apr. 25.2 0:46 26.6 0:43 19.1 0:38
May 24.4 0:58 26.5 0:45 19.7 0:35
Jun. 28.1 1:00 25.1 0:44 21.4 0:37
Jul. 29.8 0:56 26.6 0:40 24.8 0:37
Aug. 28.9 0:49 27.9 0:39 24.4 0:36
Sep. 30.6 0:49 26.5 0:39
Oct. 28.7 0:45 25.9 0:36
Nov 27.4 0:43 26.4 0:36
33
Operating at a glance up to August’2017.
Dec. 26.4 0:45 22.5 0:38
Jan. 27.5 0:46 23.3 0:37
Feb. 27.6 0:45 23.9 0:36
Mar. 30.7 0:46 24.2 0:40
Avg. 27.9 0:49 25.5 0:39 21.9 0:36
POH Dispatched to
POH Dispatched to
received for exam
U/L Dispatched to
U/L Dispatched to
U/L Dispatched to
received for exam
BOX'N rakes
BOX'N rakes
POH)
POH)
POH)
Shop
Shop
Shop
Shop
Shop
Shop
line
line
line
Apr. 378 1717 446 207 2370 343 1656 544 288 2488 388 1837 301 414 2552
May 357 1506 404 245 2155 363 2017 287 252 2556 402 2185 156 281 2622
Jun. 349 1422 384 150 1956 378 1612 470 239 2321 414 2171 323 385 2879
Jul. 359 2100 401 240 2741 356 1824 174 123 2121 438 2233 341 302 2876
Aug. 366 2033 184 214 2431 344 2183 155 202 2540 454 2389 201 439 3029
Sep. 333 1793 308 168 2269 284 1562 176 165 1903
Oct. 385 1838 401 305 2544 382 1816 127 196 2139
Nov. 364 1474 254 222 1950 437 2073 221 222 2516
Dec. 367 1929 426 285 2640 405 1764 294 239 2297
Jan. 368 1623 292 298 2213 417 2081 165 221 2478
Feb. 401 2003 560 205 2768 393 1696 364 109 2191
Mar. 433 1952 462 188 2602 408 2223 418 46 2701
Total 4460 21390 4522 2727 28639 4510 22507 3395 2302 28251 2096 10815 1322 1821 13958
Per Rake 4.80 1.01 0.61 6.42 4.99 0.75 0.51 6.26 5.16 0.63 0.87 6.66
37
Operating at a glance up to August’2017.
Jan 0 1 1 0 6 6
Feb 0 1 1 0 1 1
Mar 0 5 5 0 0 0
Total 0 27 27 0 25 25 0 3 3
Per month 0 2.3 2.3 0.0 2.1 2.1 0 0.6 0.6
6.8 Wagon Repaired in Wagon Care Center (Sick Line) at Mughalsarai (in EWU Nos.)
2015-16 2016-17 2017-18
Month
Total Average Total Average Total Average
Apr. 2081 69.4 1808 60.27 1506 50.20
May 1910 61.6 1774 57.23 1762 56.84
Jun. 1918 66.0 1737 57.90 1725 57.50
Jul. 2020 65.2 1783 57.52 1558 50.26
Aug. 2098 67.7 1969 63.52 1719 55.45
Sep. 1950 65.0 1751 58.34
Oct. 1962 63.3 1950 62.90
Nov. 1543 50.5 2018 67.27
Dec. 1984 64.0 1779 57.39
Jan. 1599 51.6 1740 56.13
Feb. 1926 66.4 1565 55.89
Mar. 1874 60.5 1840 59.35
Total 22865 62.47 21714 59.49 8270 54.05
7.0 Factors Affecting Operation:
Construction Signal
Month
2015-16 2016-17 2016-17 2017-18 2015-16 2016-17 2016-17 2017-18
Apr. 28.28 19.02 19.02 47.22 32.00 18.20 18.20 22.39
May 30.24 32.55 32.55 20.55 30.22 10.23 10.23 19.00
Jun. 31.21 18.51 18.51 48.52 12.27 22.29 22.29 5.30
Jul. 0.00 22.03 22.03 31.42 15.07 15.07
Aug. 39.35 0.00 0.00 86.50 85.27 38.51 38.51 19.21
Sep. 12.36 0.00 185.11 45.41
Oct. 14.34 35.06 44.38 12.56
Nov 14.14 53.14 14.23 12.24
Dec. 21.57 81.23 43.32 3.54
Jan. 14.09 10.39 13.45 16.13
Feb. 12.37 30.17 32.01 52.14
Mar. 0.00 55.38 5.53 45.01
Total 217.95 357.48 92.11 529.21 291.33 104.30
7.3.1 General mobility affected of the Division on A/c of naxal outfits and others activities-
Month
Bandh Rail Roko Dharna & others Total
2015-16 2016-17 2017-18 2015-16 2016-17 2017-18 2015-16 2016-17 2017-18 2015-16 2016-17 2017-18
Apr. 4 - 2 - - - 1 - - 5 - 2
May 7 1 2 3 - - - - - 10 1 2
Jun. 4 1 2 - - - - - - 4 1 2
Jul. 23 1 - - - 1 - - - 23 1 1
Aug. 5 2 3 - - 2 - - - 5 2 5
Sep 2 4 2 - - - 4 4
Oct. 2 9 1 - - - 3 9
Nov. 2 3 - - - 1 2 4
Dec. 2 2 - 1 - - 2 3
Jan. 1 1 - - 3 - 4 1
Feb. 3 2 3 1 2 - 8 3
Mar 9 2 - - - - 9 2
Total 64 28 9 9 2 3 6 1 0 79 31 12
On 23.06.17, 53611 UP (21391/MGS base) out from SEB at 09:55 hrs, stopped on point no. 71/A
(HWH end facing point) at 10:10 hrs due to all wheel of DLI end trolley of engine/21391 derailed.
Causing UP train movement blocked. Point clear by derailed loco at 15:45 hrs and power received
in L/No. 14 at DOS. PWI gave track fit at 17:20 hrs, with emergency caution at speed of 10 kmph
at 17:30 hrs of L/No. 13. Operations restored at 17:30 hrs. First train PPGS/3148/4428 departed
from SEB at 17:55 hrs and passed DOS at 18:22 hrs. Rep: 53363, 53601, 12801, 12353 & 12397
detained in up line. 12372, 12320, 12818, 12802 & 12988 detained in DN line and UP GC
bunching created.
40
Operating at a glance up to August’2017.
On 10.07.17, All UP & DN train movement between PHE-KWD-PHE stations over GC
section were stopped from 15:00 hrs due to flood. Down line start with stop dead & 10 kmph
caution from 15:45 hrs in between km 564/6-564/4 at bridge No. 548, UP line start with stop dead
& 10 kmph caution from 16:00 hrs in between km 564/3A-564/5A at bridge No. 548 and
Reversible line start with 15 kmph caution from 18:45 hrs. Rep: 53525 UP Pass detained at PHE
from 15:06 to 16:03 hrs. 12801 UP detained at DOS from 15:25 to 16:10 hrs. 12397 UP detained
at SEB from 15:40 to 16:15 hrs. 05 UP & 1 DN goods trains detained and bunching created in DN
GC. Note: Stop dead caution removed in DN line at 16:30 hrs and in UP line at 16:35 hrs. UP &
DN caution raised 10 to 30 kmph from 19:20 hrs. Reversible line caution raised 10 to 30 kmph
since 21:45 hrs.
On 12.07.17, 12876 Dn arrived MGS Platform No. 02 at 23:58 hrs. Incoming diesel loco No.
11162-WDM3D (LKO based) detached & moved and stopped at Track Circuit No. 836/T at 00:02
hrs. Then outgoing electric engine No. 30218-WAP7 (GZB based) of 12876 moved to attach in
12876 Dn signal lower at 00:02 hrs and moved in the same time diesel of 12876 DN also moved
and side collision at Point No. 840 near road over bridge at about 00:04 hrs and diesel loco
derailed by DLI/END trolley all wheels. Platform No. 02 blocked.
Diesel loco No. 11162/LKO (WDM3D) re-railed at 06:50 hrs. Derailed Diesel loco No. 11162 fit
for movement at 07:50 hrs with 05 kmph speed and attached in DLI/END of ART/MGS.
ART/MGS moved from site 08:12 hrs. Hence site cleared at 08:14 hrs. P way work started since
08:14 hrs. ART with Diesel loco No. 11162 crossed for loco at 08:55 hrs. P way and S&T both
gave track fit at 10:35 hrs. Normal movement resumed on Dn line at 10:40 hrs.
On 21.07.17, All lines train movements over GC section at SSM were stopped and OHE off from
09:57 to 17:55 hrs due to girder of ROB of DFCCIL slipped on pillar from jack which was unsafe for
train operation at 09:57 hrs. DFCCIL gave ready at 17:30 hrs all three lines OHE charged at 17:32 hrs.
PWI/SSM imposed caution 10 kmph speed at SSM incidental place on UP 3rd line, R/L & DN M/L
SSM S/L at 17:48 hrs. Rep: - All lines movement blocked from 10:00 to 17:55 hrs. 12988, 18104,
12802, 12801, 12397, 53521 & 53525 detained.
On 02.08.17, All UP & DN train movement over GC section stopped from 04:05 hrs due to 15 nos. of
wagons (R/22nd to R/36th) of DN BOXN/E/31265 got derailed in between KMS-DCX at km 637/08
near Gate No. 66. Normal train operations resumed at 23:23 hrs with speed restrictions.
8.1 OMS data has been sent to HQ vide Sr. DEN (Cord)’s letter no. W/PW/OMS dt. 30.03.17 CRS
sanction for up gradation of speed of DOS-MGS up line on GC from 110 Kmph to 130 Kmph
needs to be obtained at the earliest.
8.2 6 nos. coaching trains i.e. 12397/12398, 12389/12391, 12801/12802, 12381/12382, 12273/12274
and 12281/12282 having LHB rakes are running below 130 kmph in between MPO-MGS stations
over GC section, but the same is running in MGS-ALD section (NCR) @ 130 kmph. Needs to be
raised speed @130 kmph in MPO-MGS section. Application may be sent to CRS on priority for
requisite sanction.
41
Operating at a glance up to August’2017.
8.3 Expediting progress and early is urgently required. Commissioning of panel interlocking at SEB
& 3rd line on Sone Bridge between SEB & DOS.
8.4 Conversion of 13 nos. end panel on GC to central panel will release a total of 52 ASMs and this
becomes all the more important in view of acute crisis of ASMs on the division.
8.5 As on 01.09.17, 137 posts (22.72% of SS-603) in ASM cadre are lying vacant in this Division.
Division is facing lot of problems in day to day train operations.
9.2 Engineering:
(i) SEB Bridge 3rd line, PI of SEB –planning from construction yet not received, target is
March’2016 (committed to CRB).
(ii) ARA-SSM section speed enhancement.
9.3 Mechanical:
42
Operating at a glance up to August’2017.
(i) Restoration or separate sanction of all Weather Examinations Lines at MGS in Smart Yard
Plan.
(ii) Examination facility at DOS/RIL/Dalmiyan Nagar to be sanctioned including a yard
connection from DFCCIL.
(iii) Improvement in outsourced repairs from current- 15 wagons/day to planned 45 nos.
9.4 Operating:
(i) Sanction of SEB bypass.
(ii) Sanction of PF on Reversible line at BBU & SSM to improve punctuality of M/Express &
Passenger trains.
(iii) Sanction of MGS bypass: ‘B’ route flyover.
(iv) Sanction of Gaya bypass & additional island PF for PF return trains and trains to DN GC
for punctuality improvement and decongestion of Gaya yard.
(v) UFSBI connection with N. Rly at BH ‘B’ for smooth operation.
(vi) Operational Constraints of Newly Introduced MEMU & other Passenger Trains:
(a) Vide notification no. ECR/OPT/TT/DHN/510 Pt IV dt., 15.07.16 a new MEMU train
(63238 ALD-MGS) has been extended to MGS. Its arrival time is 23.00 hrs and the
same rake departed at 05.10 hrs Ex MGS to PNBE as 63264 (MGS-PNBE MEMU).
Similarly train no. 63231 (PNBE-MGS) arrived at 03.30 hrs and departed as 63237
MEMU (MGS-CAR-ALD) at 04.30 hrs. Holding time of one rake is 06.10 hrs and 2 nd
one having holding time of 01.00 hrs. As MGS station having no coaching yard,
hence the both rakes are being kept on platform no. 7 & 8 by cut & cross movement.
Further it is being started to their destination after cut-cross movement. It is an
operational constraint at MGS and affecting the other movement of trains also.
Keeping in view of above constraints the holding time of above trains i.e.
63238/63264 and 63231/63237 to be minimize up-to 30 min. only.
(b) Besides this following trains having holding at MGS more than 30 min. Which are as
under-
Sl. Terminating Originating Holding
No. Train no. Arrl. time Train no. Dep. time time
01. 64596 (Ex ALD) 11.10 64595 (To ALD) 16.00 04.50
02. 54110 (Ex FD) 10.10 54109 (To FD) 16.25 06.15
03. 63233 (Ex BXR) 12.00 63229 (To BXR) 14.40 02.40
04. 53609 (Ex Gaya) 12.50 53610 (To Gaya) 15.35 02.45
The above holding of coaching rakes creating congestion to coaching complex at MGS and
affecting berthing of other coaching trains also. In the light of the above, it is requested that
holding time to minimize up-to 30 min. Only for MEMU and Passenger services by extend
the services on reviewing upcoming time table.
(vii) Sanction of Fly over at ANH for transfer of empties ex BRBCL & NPGC to down line
without surface working. Also, inter connectivity of exchange yards of NPGC & BRBCL.
(viii) Palamu Exp route change ex SEB to avoid moments to & fro on SEB Bridge.
43