You are on page 1of 12

Contents

1 Dam Control System


-1 Telemetry Subsystem
-32 Dam Data Processing Subsystem
-3 Gate Control Subsystem
-4 Dam Discharge Warning Subsystem

2 Appendix

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 15


2. Dam Data Processing Subsystem Processing

Function Block Diagram of Dam Control System

PLC PC / WS

PLC
PLC PC / WS

PLC

PLC
PC / WS PC / WS

PLC

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 16


2. Dam Data Processing Subsystem (Cont’d) Processing

Major functions of Dam Control System


 Arithmetic (Calculation) Function
 Control Function

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 17


2. Dam Data Processing Subsystem (Cont’d) Processing

Arithmetic Function - Providing Data

 Providing the operators with arithmetic data necessary


to the Dam operation in an easy-to-understand way
 Organizing and displaying data by using graphic charts
on PCs and big screens

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 18


2. Dam Data Processing Subsystem (Cont’d) Processing

Arithmetic Function - Sample Screen: Condition Diagram

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 19


2. Dam Data Processing Subsystem (Cont’d) Processing

Arithmetic Function - Sample Screen: Condition Diagram (enlarged)

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 20


2. Dam Data Processing Subsystem (Cont’d) Processing

Arithmetic Function - Sample Screen: Trend Data Display (summary)

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 21


2. Dam Data Processing Subsystem (Cont’d) Processing

Arithmetic Function - Sample Screen: Trend Data Display (details)

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 22


2. Dam Data Processing Subsystem (Cont’d) Processing

Arithmetic Function - Sample Screen: Inflow Volume Prediction

Input “target
opening”

Calculate “target
No.1 Discharge Gate 123
123| 456.78 discharge”
No.2 Discharge Gate
No.3 Discharge Gate 77 123.45|
123.45 Input “target
No.1 Flap Gate discharge”
No.2 Flap Gate
No.3 Flap Gate Calculate “target
opening”

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 23


2. Dam Data Processing Subsystem (Cont’d) Processing

Arithmetic Function - Sample Screen: Inflow Volume Prediction

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 24


2. Dam Data Processing Subsystem (Cont’d) Processing

Arithmetic Function - Sample Screen: Time-series Display

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 25


2. Dam Data Processing Subsystem (Cont’d) Processing

Sample Screen: Graph Display

Copyright © 2020 Japan Radio Co., Ltd. All rights reserved. 26

You might also like