You are on page 1of 1

System Architecture SIEMENS SCADA

Item : River Water Treatment Station / Binh Duong Chenglong Paper CLVP
Designed : Eratech Enviromental Technology.JSC
MCC CENTER CONT ROL ROOM

CENTER CONTROL ROOM

ES OS1 OS2

ETHERNET CABLE
HARDWIRE IP1 192.168.0.15
IP1 192.168.1.4
IP2 192.168.1.5
IP1 192.168.0.26 SW02
IP2 192.168.1.3

MCC0-2 MCC0 IT CABINET


CABINET PHASE2 CABINET PHASE1

IP1 192.168.0.12 CPU S71500 CPU S71500

IP1 192.168.0.1

SW01
.
.

Phase #1
Phase #2 Phase #2 Phase #1 Phase #1
Phase #2 Phase #2 : Location: TREATED PUMPING STATION
Location
Location RAW WATER PUMPING STATION Location : RAW WATER PUMPING STATION Location:SAND FILTER TANK
Location:SAND FILTER TANK Location:CHEMICAL PANEL Location TREATED PUMPING STATION
MCC3
MCC1.1 MCC
MCC1 MCC
MCC2 I/O
MCC2 1 MCC3.1 I CABINET
I/O CABINET MCC2 2 I/O CABINET II/O CABINET Existing
New I/O CABINET I/O CABINET I/O CABINET Existing
New Existing
New New IP1 192.168.0.6 IP1 192.168.0.11
IP1 192.168.0.14
IP1 192.168.0.17 IP1 192.168.0.19 IP1 192.168.0.3
IP1 192.168.0.13 IP1 192.168.0.4
IP1 192.168.0.16

IP1 192.168.0.5

PROJECT NUMBER CUSTOMER


2021-04-15 CLVP
OBJECT
BINH DUONG Province
DOC TYPE CUSTOMER DWG NR
System Layout
DATE NAME APPD COMMENTS REV.NBR TITLE
Siemens SCADA WinCC_ CLVP water supply System
DESIGN. TRẦN MINH CHÍNH CHKD HỒ CHÍ THANH APPD HỒ HỒNG QUY DCC DRAWING ID/REV PAGE NBR

FILE CLVP water supply system_SCADA layout PAGE


Layout PROCESS AREA As-build 1 1

You might also like