ITEM NO DESCRIPTION UOM QUANTITY


1 SITE ESTABLISHMENT Sum 1

2 Block 1- Open Training Room Sum 1

3 Block 2- Electrical Training Centre Sum 1

4 Block 3-Trade Superintendent Office Sum 1

5 Block 4 -Fitter Training Room Sum 1

6 Block 5&6 : Diesel and Boilermaking Workshop Sum 1

7 Block 7 : Rigging & piping Worksjhop Sum 1

8 Ablution Block Sum 1

9 Fencing Sum 1

Subtotal total amount

Contigencies (Allowed 10%)

Subtotal Amount

VAT @ 16%

Total Amount

Project & Title:

BOQ: New Training Center & Fenc


ng Center
RATE AMOUNT
$ - $ -

$ - $ -

$ - $ -

$ - $ -

$ - $ -

$ - $ -

$ - $ -

$ - $ -

$ - $ -

$ -

encies (Allowed 10%) $ -

Subtotal Amount $ -

VAT @ 16% $ -

Total Amount $ -

Training Center & Fence


ITEM NO PAY REF

2
3
4

5
6
7
8
9

9
BILL OF QUANTITIES FOR MUMI TRAINING CENT

DESCRIPTION
BILL NO. 1
PRELIMINARY & GENERAL ITEMS
VALUE RELATED ITEMS / TIME RELATED ITEMS
Site Establishment
Contractual requirements

Offices and storage sheds-Tools and equipment Including PPE - Electric power - plant Water supplies & Food Removal of Site
Establishment and Camp on Completion -Safety, Induction and Medicals - Barricade - Supervision for duration of construction
-Other fixed charge -Living accommodation and Work permit/Visa/Flighs return for Expats if required obligations

Block 1- Open Training Room


BILL NO 2
FLOOR TILING
Tiles floors with A grade ceramic - tile with adhesive 3mm spacers, grouted with waterproof no-shrink grout in the
Kitchen (Floor tiles non-slip ceramic tile 600mm) - glazed floor tiles fixed with adhesive to bedding (bedding elsewhere)
and flush pointed with epoxy mortar
On floor
BILL NO 3
PAINTWORK
PREPARATORY WORK TO EXISTING WORK
Previously painted plastered surfaces -Previously painted wood surfaces - Previously painted metal surfaces
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered
or peeling paint shall be completely removed and cracks shall be opened, filled with a suitable filler and finished
smooth
Surfaces shall be thoroughly cleaned down. Blistered or
peeling paint shall be completely removed and cracks and crevices shall be primed, filled with suitable fillerand finished
smooth
Surfaces shall be thoroughly rubbed and cleaned down. Blistered or peeling paint shall be completely removed down to bare
metal
PAINTWORK ETC TO NEW WORK
One coat primer and two coats interior quality PVA emulsion paint -One coat alkyd based zinc phosphate primer and
two coats premium quality polyurethane enamel paint, on steel
Training Room - Internal Paint ( enamal Paint walls with Dulux weather guard 3 coats & (Inside wall (broken white) & Outside
walls (white grey) to be advised by MUMI )
One coat bonding liquid and two coats exterior quality PVA emulsion paint
Training Room - External Paint (enamal Paint walls with Dulux weather guard 3 coats Outside walls (white grey) to be
advised by MUMI )
BILL NO 4
CEILINGS, PARTITIONS AND ACCESS FLOORING
SUPPLEMENTARY PREAMBLES
Descriptions:
Items described as "nailed" shall be deemed to be fixed with hardened steel nails or pins or shot pinned to brickwork or concrete

Items described as "plugged" shall be deemed to include screwing to fibre, plastic or metal plugs at not exceeding 600mm
centres, and where described as "bolted" the bolts have been given elsewhere
CEILINGS ETC
Ceiling complete with all accessories as per previous specification to be supllied and installed (install all materials for ceiling,
fascia board and other superstructure items: Metallic Suspended Ceiling -1200*600 mm )
Aerolite insulation
30mm Insulation closely fitted and laid on top of brandering between roof timbers etc ( Glass Wool Insulation 30mm -size :
1mtr*21 mtr one roll) Heat and sound Insulator With Heat Resitance )
BILL NO 5
MISCELLANEOUS ITEMS
Install Aircon Unit 24000 BTU
Lighting and lighting controls (Supply and Installation of Internal LED Light & fitting 2*18W IP65 T8-18WPTA - include all
accessories& Light Switches
Install Plug Points: include all accessories & cable line
Wall Extension Work : 0,5mm thick IBR Roof Sheeting steel sheets
BRICK WORK
Brickwork: 200 mm thick block work filled with 10Mpa
concrete outside face: face brick standard
Face for foundations/plinth under floor slab engineering bricks for building
PLASTER WORK
Internal 20 mm thick, wood-float finish for building - Smooth finishing with wood float on identified areas to engineering specs
Supply and Installation of Windows and Doors (*(Mesh for mosquito) windows and frames including glazing, sills,
locks, and hinges)
Door : Double D1 - 1700*2100 mm
Door : Single D2 - 900*2000 mm
Block 2- Electrical Training Centre
BILL NO 5
PAINTWORK
PREPARATORY WORK TO EXISTING WORK
Previously painted plastered surfaces -Previously painted wood surfaces - Previously painted metal surfaces
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered
or peeling paint shall be completely removed and cracks shall be opened, filled with a suitable filler and finished
smooth
Surfaces shall be thoroughly cleaned down. Blistered or
peeling paint shall be completely removed and cracks and crevices shall be primed, filled with suitable fillerand finished
smooth
Surfaces shall be thoroughly rubbed and cleaned down. Blistered or peeling paint shall be completely removed down to bare
metal
PAINTWORK ETC TO NEW WORK
One coat primer and two coats interior quality PVA emulsion paint -One coat alkyd based zinc phosphate primer and
two coats premium quality polyurethane enamel paint, on steel
Internal Paint ( enamal Paint walls with Dulux weather guard 3 coats & (Inside wall (broken white) & Outside walls (white
grey) to be advised by MUMI )
One coat bonding liquid and two coats exterior quality PVA emulsion paint
External Paint (enamal Paint walls with Dulux weather guard 3 coats Outside walls (white grey) to be advised by MUMI )
PARTITIONS ETC
" Hammered Glass partition walls (Free Issue)/Prefeab " partition systems
Wall Partitioning 2000 mm high with bottom and top tracks plugged as Bellow
• Partition Walling for 4 Offices
• Partition Walling for kitchen
• Partition walling for HV Switching & Testing Bay
• Partition walling for Electrical Workstations x 4
• Partition walling Electrical Supervisors office
Wall Partitioning 2800 mm high up the ceiling with bottom and top tracks plugged ( Partition walling Electrical Supervisors
office)
BILL NO 6
MISCELLANEOUS ITEMS
kitchen : double hand bassin wash Knee operated ss304 c/w 470*415*890mm to include all accessories to be connected to
water supply and waste outlets and to refurbish the water Pipeline from kitchen up to the lost Pit sinkhole
Install Aircon Unit 24000 BTU
Lighting and lighting controls (Supply and Installation of Internal LED Light & fitting 2*18W IP65 T8-18WPTA - include all
accessories& Light Switches
Install Plug Points: include all accessories & cable line
Supply and Installation of Windows and Doors (*(Mesh for mosquito) windows and frames including glazing, sills,
locks, and hinges)
Doors : Single D1 - 900*2100 mm
Block 3-Trade Superintendent Office
BILL NO 7
PAINTWORK
PREPARATORY WORK TO EXISTING WORK
Previously painted plastered surfaces -Previously painted wood surfaces - Previously painted metal surfaces
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered
or peeling paint shall be completely removed and cracks shall be opened, filled with a suitable filler and finished
smooth
Surfaces shall be thoroughly cleaned down. Blistered or
peeling paint shall be completely removed and cracks and crevices shall be primed, filled with suitable fillerand finished
smooth
Surfaces shall be thoroughly rubbed and cleaned down. Blistered or peeling paint shall be completely removed down to bare
metal
PAINTWORK ETC TO NEW WORK
One coat primer and two coats interior quality PVA emulsion paint -One coat alkyd based zinc phosphate primer and
two coats premium quality polyurethane enamel paint, on steel
Internal Paint ( enamal Paint walls with Dulux weather guard 3 coats & (Inside wall (broken white) & Outside walls (white
grey) to be advised by MUMI )
One coat bonding liquid and two coats exterior quality PVA emulsion paint
External Paint (enamal Paint walls with Dulux weather guard 3 coats Outside walls (white grey) to be advised by MUMI )
BILL NO 8
MISCELLANEOUS ITEMS
Install Aircon Unit 24000 BTU
Doors : Single Doorway D1 - 900*2100 mm
Block 4 -Fitter Training Room
BILL NO 9
FLOOR TILING
Tiles floors with A grade ceramic - tile with adhesive 3mm spacers, grouted with waterproof no-shrink grout in the
Kitchen (Floor tiles non-slip ceramic tile 600mm) - glazed floor tiles fixed with adhesive to bedding (bedding elsewhere)
and flush pointed with epoxy mortar
On floor
BILL NO 10
PAINTWORK
PREPARATORY WORK TO EXISTING WORK
Previously painted plastered surfaces -Previously painted wood surfaces - Previously painted metal surfaces
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered
or peeling paint shall be completely removed and cracks shall be opened, filled with a suitable filler and finished
smooth
Surfaces shall be thoroughly cleaned down. Blistered or
peeling paint shall be completely removed and cracks and crevices shall be primed, filled with suitable fillerand finished
smooth
Surfaces shall be thoroughly rubbed and cleaned down. Blistered or peeling paint shall be completely removed down to bare
metal
PAINTWORK ETC TO NEW WORK
One coat primer and two coats interior quality PVA emulsion paint -One coat alkyd based zinc phosphate primer and
two coats premium quality polyurethane enamel paint, on steel
Internal Paint ( enamal Paint walls with Dulux weather guard 3 coats & (Inside wall (broken white) & Outside walls (white
grey) to be advised by MUMI )
One coat bonding liquid and two coats exterior quality PVA emulsion paint
External Paint (enamal Paint walls with Dulux weather guard 3 coats Outside walls (white grey) to be advised by MUMI )
BILL NO 11
MISCELLANEOUS ITEMS
Install Aircon Unit 24000 BTU
Doors : Single Doorway D1 - 900*2100 mm
Window Repairing with puttying and Frame varnishing
Lighting and lighting controls (Supply and Installation of Internal LED Light & fitting 2*18W IP65 T8-18WPTA - include all
accessories& Light Switches
Install Plug Points: include all accessories & cable line
PARTITIONS ETC
" Hammered Glass partition walls (Free Issue)/Prefeab " partition systems
Wall Partitioning 2000 mm high with bottom and top tracks plugged as Bellow
• Partition Walling forFilter workstation
Block 5&6 : Diesel and Boilermaking Workshop
BILL NO 12
PAINTWORK
PREPARATORY WORK TO EXISTING WORK
Previously painted plastered surfaces -Previously painted wood surfaces - Previously painted metal surfaces
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered
or peeling paint shall be completely removed and cracks shall be opened, filled with a suitable filler and finished
smooth
Surfaces shall be thoroughly cleaned down. Blistered or
peeling paint shall be completely removed and cracks and crevices shall be primed, filled with suitable fillerand finished
smooth
Surfaces shall be thoroughly rubbed and cleaned down. Blistered or peeling paint shall be completely removed down to bare
metal
PAINTWORK ETC TO NEW WORK
One coat primer and two coats interior quality PVA emulsion paint -One coat alkyd based zinc phosphate primer and
two coats premium quality polyurethane enamel paint, on steel
On stell Beam & structures inlude Brick walls
BILL NO 13
MISCELLANEOUS ITEMS
Typical characteristics of 20ft equivalent customized container modules used as Office blocks for larger structures. The
details may slightly vary between manufacturers and requiremnt , the fundamental parameters however like
dimensions and structural characteristics (frames) of 1-TEU and 2-TUEs Customized Container Houses as below :
1. Structure: Galvanized Steel (GI)/Powder Coated
2. Frame: 100 x 100 x 2.5mm (3.9 x 3.9 x.0.1”) steel or 160 x 160 x 3mm (6.3 x 6.3 x .12”) steel
a. Walls (2): 50/75/100 mm (2/3/4”) thick sandwich panel 0.5mm (20 mils) steel sheets int/ext
3. Roof
b. Purlin (beam): 30 x 40 x 3mm (1.2 x 1.6 x 0.12 inch) steel
c. Metal sheets (3): 0.3 to 0.5mm (12 to 20 mils) PPGI steel
d. Insulation: 50/75/100 mm (2/3/4”) thick sandwich panel
e. Ceiling: 3mm (0.12 inch) PVC
4. Floor
f. Purlin (beam): 30 x 80 x 3mm (1.2 x 3.15 x 0.12inch) steel
g. Bottom protection (3): 1mm (40 mils) steel sheet
h. Insulation: 18-20 mm (0.7 inch)
i. Base: 15 – 18mm (0.6-0.75”) MgO/Cement-fiber boards
j. Finish: Tiles floors with A grade ceramic - tile with adhesive 3mm spacers, grouted with waterproof no-shrink
grout in the Kitchen (Floor tiles non-slip ceramic tile 300x300mm)
5. Doors: Steel (GI), insulated (2000x900mm)
6. Windows: PVC/Aluminum alloy (dual pane options- 1200x900 mm)
7. Color: (broken white) & Outside walls (white grey) to be advised by MUMI
8. Electrical (4): International standards (SANS, American, European, Australian….)
9. Plumbing (5): As required and Mumi standard and request
10. Grid/water/sewer connections: Exterior hookups (as needed)
11. Life Span: 20+ years
12. Certificates: ISO 9001, CE
13. Bolts and screws: International standards
14. Seismic Resistance (6): Eurocode 8
15. Wind Resistance (7): 120 to 200km/h (75 to 125 miles/h)
16. Fireproof: Yes (Typically A-grade)
17. Interior design Interior Design: To be specified by the Project owner

Install Office Container (Free Issue)as above


CONCRETE
FORMWORK
Scheduled formwork :
Plinth Foundation footing 2500*500*500mm Thick
Strength concrete - Class 30 MPa/ 19 mm concrete :
Plinth Foundation footing 2500*500*500mm Thick
Install Aircon Unit 24000 BTU
Lighting and lighting controls (Supply and Installation of Internal LED Light & fitting 2*18W IP65 T8-18WPTA - include all
accessories& Light Switches
Install Plug Points: include all accessories & cable line
BRICK WORK
Brickwork: 200 mm thick block work filled with 10Mpa
concrete outside face: face brick standard
Face for foundations/plinth under floor slab engineering bricks for building
PLASTER WORK
Internal 20 mm thick, wood-float finish for building - Smooth finishing with wood float on identified areas to engineering specs
PARTITIONS ETC
" Hammered Glass partition walls (Free Issue)/Prefeab " partition systems
Wall Partitioning 2000 mm high with bottom and top tracks plugged as Bellow
• Partition Walling for Boiler Maker workshop
Supply and install gates, doors, windows and frames including glazing, sills, locks and hinges:
Gate Steel door frames 2100mm x 2000mm
Install sheeting on side walls of workshop
Block 7 : Rigging & piping Worksjhop
BILL NO 12
PAINTWORK
PREPARATORY WORK TO EXISTING WORK
Previously painted plastered surfaces -Previously painted wood surfaces - Previously painted metal surfaces
Surfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered
or peeling paint shall be completely removed and cracks shall be opened, filled with a suitable filler and finished
smooth
Surfaces shall be thoroughly cleaned down. Blistered or
peeling paint shall be completely removed and cracks and crevices shall be primed, filled with suitable fillerand finished
smooth
Surfaces shall be thoroughly rubbed and cleaned down. Blistered or peeling paint shall be completely removed down to bare
metal
PAINTWORK ETC TO NEW WORK
One coat primer and two coats interior quality PVA emulsion paint -One coat alkyd based zinc phosphate primer and
two coats premium quality polyurethane enamel paint, on steel
On stell Beam & structures inlude Brick walls
BILL NO 13
MISCELLANEOUS ITEMS
Typical characteristics of 20ft equivalent customized container modules used as Office blocks for larger structures. The
details may slightly vary between manufacturers and requiremnt , the fundamental parameters however like
dimensions and structural characteristics (frames) of 1-TEU and 2-TUEs Customized Container Houses as below :
1. Structure: Galvanized Steel (GI)/Powder Coated
2. Frame: 100 x 100 x 2.5mm (3.9 x 3.9 x.0.1”) steel or 160 x 160 x 3mm (6.3 x 6.3 x .12”) steel
a. Walls (2): 50/75/100 mm (2/3/4”) thick sandwich panel 0.5mm (20 mils) steel sheets int/ext
3. Roof
b. Purlin (beam): 30 x 40 x 3mm (1.2 x 1.6 x 0.12 inch) steel
c. Metal sheets (3): 0.3 to 0.5mm (12 to 20 mils) PPGI steel
d. Insulation: 50/75/100 mm (2/3/4”) thick sandwich panel
e. Ceiling: 3mm (0.12 inch) PVC
4. Floor
f. Purlin (beam): 30 x 80 x 3mm (1.2 x 3.15 x 0.12inch) steel
g. Bottom protection (3): 1mm (40 mils) steel sheet
h. Insulation: 18-20 mm (0.7 inch)
i. Base: 15 – 18mm (0.6-0.75”) MgO/Cement-fiber boards
j. Finish: Tiles floors with A grade ceramic - tile with adhesive 3mm spacers, grouted with waterproof no-shrink
grout in the Kitchen (Floor tiles non-slip ceramic tile 300x300mm)
5. Doors: Steel (GI), insulated (2000x900mm)
6. Windows: PVC/Aluminum alloy (dual pane options- 1200x900 mm)
7. Color: (broken white) & Outside walls (white grey) to be advised by MUMI
8. Electrical (4): International standards (SANS, American, European, Australian….)
9. Plumbing (5): As required and Mumi standard and request
10. Grid/water/sewer connections: Exterior hookups (as needed)
11. Life Span: 20+ years
12. Certificates: ISO 9001, CE
13. Bolts and screws: International standards
14. Seismic Resistance (6): Eurocode 8
15. Wind Resistance (7): 120 to 200km/h (75 to 125 miles/h)
16. Fireproof: Yes (Typically A-grade)
17. Interior design Interior Design: To be specified by the Project owner

Install Office Container (Free Issue)as above


CONCRETE
FORMWORK
Scheduled formwork :
Plinth Foundation footing 2500*500*500mm Thick
Strength concrete - Class 30 MPa/ 19 mm concrete :
Plinth Foundation footing 2500*500*500mm Thick
Install Aircon Unit 24000 BTU
Lighting and lighting controls (Supply and Installation of Internal LED Light & fitting 2*18W IP65 T8-18WPTA - include all
accessories& Light Switches
Install Plug Points: include all accessories & cable line
BRICK WORK
Brickwork: 200 mm thick block work filled with 10Mpa
concrete outside face: face brick standard
Face for foundations/plinth under floor slab engineering bricks for building
PLASTER WORK
Internal 20 mm thick, wood-float finish for building - Smooth finishing with wood float on identified areas to engineering specs
PARTITIONS ETC
" Hammered Glass partition walls (Free Issue)/Prefeab " partition systems
Wall Partitioning 2000 mm high with bottom and top tracks plugged as Bellow
• Partition Walling for Boiler Maker workshop
Supply and install gates, doors, windows and frames including glazing, sills, locks and hinges:
Gate Steel door frames 2100mm x 2000mm
Install sheeting on side walls of workshop
ELECTRICAL WORKS (Board Room lighting _supply and installation/Outside/ablution lighting _supply and installation
/Socket outlet supply and installation/Earthing system (all materials included)/Distribution Box EL and Breakers supply and
installation
Ablution Block
BILL NO 13
MISCELLANEOUS ITEMS
Typical characteristics of 20ft equivalent customized container modules used as Office blocks for larger structures. The
details may slightly vary between manufacturers and requiremnt , the fundamental parameters however like
dimensions and structural characteristics (frames) of 1-TEU and 2-TUEs Customized Container Houses as below :
1. Structure: Galvanized Steel (GI)/Powder Coated
2. Frame: 100 x 100 x 2.5mm (3.9 x 3.9 x.0.1”) steel or 160 x 160 x 3mm (6.3 x 6.3 x .12”) steel
a. Walls (2): 50/75/100 mm (2/3/4”) thick sandwich panel 0.5mm (20 mils) steel sheets int/ext
3. Roof
b. Purlin (beam): 30 x 40 x 3mm (1.2 x 1.6 x 0.12 inch) steel
c. Metal sheets (3): 0.3 to 0.5mm (12 to 20 mils) PPGI steel
d. Insulation: 50/75/100 mm (2/3/4”) thick sandwich panel
e. Ceiling: 3mm (0.12 inch) PVC
4. Floor
f. Purlin (beam): 30 x 80 x 3mm (1.2 x 3.15 x 0.12inch) steel
g. Bottom protection (3): 1mm (40 mils) steel sheet
h. Insulation: 18-20 mm (0.7 inch)
i. Base: 15 – 18mm (0.6-0.75”) MgO/Cement-fiber boards
j. Finish: Tiles floors with A grade ceramic - tile with adhesive 3mm spacers, grouted with waterproof no-shrink
grout in the Kitchen (Floor tiles non-slip ceramic tile 300x300mm)
5. Doors: Steel (GI), insulated (2000x900mm)
6. Windows: PVC/Aluminum alloy (dual pane options- 1200x900 mm)
7. Color: (broken white) & Outside walls (white grey) to be advised by MUMI
8. Electrical (4): International standards (SANS, American, European, Australian….)
9. Plumbing (5): As required and Mumi standard and request
10. Grid/water/sewer connections: Exterior hookups (as needed)
11. Life Span: 20+ years
12. Certificates: ISO 9001, CE
13. Bolts and screws: International standards
14. Seismic Resistance (6): Eurocode 8
15. Wind Resistance (7): 120 to 200km/h (75 to 125 miles/h)
16. Fireproof: Yes (Typically A-grade)
17. Interior design Interior Design: To be specified by the Project owner
Femal & mal Ablution Bock - 2 Toilets /1 Changing Room /Shower ( Tile with adhesive 3mm spacers, grouted with waterproof
no-shrink grout - (Floor tiles non-slip ceramic tile 300 mm) : - - one urinals in the mal Toilet - Gyser 200L include all
accessories to be connected to water supply and waste outlets and to refurbish the water Pipeline from inside up to the lost Pit
sinkhole
CONCRETE
FORMWORK
Scheduled formwork :
Plinth Foundation footing 2500*500*500mm Thick
Strength concrete - Class 30 MPa/ 19 mm concrete :
Plinth Foundation footing 2500*500*500mm Thick
Fencing
BILL NO 13
FENCE
Supply and Install fence around at entrance to include Gate
Complete Installation of fence to include corner posts, stay, intermediate post, mesh: 1.8m x 50mm x 2.5mm lightly galvanized
diamond mesh, Barbed wire (3 strands), 2.0mm lightly Galvanized wire : Tie wire and a boom gate all inclusive with concrete
plinths 300mm high for corner posts
Install Double Vehicle Gates (galvanised double vehicle access chain wire security gates Fencing Materials applications.
pening widths in 3000mm standard mesh height plus 3 runs hi-tensile barb wire - total height = 2100mm
Car Parking Spot Dimension 2.5meter wide by 5 meter long ( with kerb or Bordure )

SITE ESTABLISHMENT

Block 1- Open Training Room

Block 2- Electrical Training Centre

Block 3-Trade Superintendent Office

Block 4 -Fitter Training Room

Block 5&6 : Diesel and Boilermaking Workshop

Block 7 : Rigging & piping Worksjhop

Ablution Block

Fencing

Subtotal total amount


TRAINING CENTER

UOM QUANTITY RATE AMOUNT


H1
H1
H1

H2

SUM 1.00 15% $ -

H1
H1
H2

H3

m2 104.86 $ -
H1
H2
H3
H4

SUM 1.00 $ -

H4

m2 245.20 $ -

m2 143.50 $ -

H1

H2
H3
m2 104.86 $ -

m2 104.86 $ -
H1
H2
No 3.00 $ -
No 6.00 $ -
No 9.00 $ -
m2 24.60 $ -
H3

m 20.50 $ -

H3
m2 123.00 $ -

No 2.00 $ -
No 2.00 $ -
H1
H1
H2
H3
H4

SUM 1.00 $ -

H4

m2 154.70 $ -

m2 154.70 $ -
H3
H4

m 15.20 $ -

m 5.50 $ -
H1
H2
No 1.00 $ -
No 5.00 $ -
No 9.00 $ -
No 14.00 $ -
No 1.00 $ -
H1
H1
H2
H3
H4

SUM 1.00 $ -

H4

m2 84.00 $ -

m2 84.00 $ -
H1
H2
No 2.00 $ -
No 1.00 $ -
H1
H1
H2

H3

m2 76.60 $ -
H1
H2
H3
H4

SUM 1.00 $ -

H4

m2 424.10 $ -

m2 321.90 $ -

H2
No 4.00 $ -
No 3.00 $ -
No 7.00 $ -
No 6.00 $ -
No 12.00 $ -

m 4.80 $ -

H1
H2
H3
H4

SUM 1.00 $ -

H4

Sum 1.00 $ -
SUM 2.00 $ -

No 4.00 $ -
H3
No 4.00 $ -
No 2.00 $ -
No 6.00 $ -
No 8.00 $ -
H3

m 40.12 $ -

H3
m2 240.72 $ -

m2 9.60 $ -

No 2.00 $ -
m2 51.00 $ -
H1
H2
H3
H4

SUM 1.00 $ -

H4

Sum 1.00 $ -

H4

SUM 2.00 $ -

No 4.00 $ -
H3
No 4.00 $ -
No 2.00 $ -
No 6.00 $ -
No 8.00 $ -
H3

m 40.62 $ -

H3
m2 243.72 $ -

m2 9.60 $ -

No 2.00 $ -
m2 103.20 $ -

SUM 1.00 $ -

H4
SUM 2.00 $ -

No 4.00 $ -
H3
No 4.00 $ -

m 150.00 $ -

No 1.00 $ -
No 10.00 $ -

$ -

$ -

$ -

$ -

$ -

$ -

$ -

$ -

$ -

$ -
Training Center Activities

Block 1- Open Training Room


Work Details Nos L W Area Unit
Floor Tiling 1 9.8 10.7 104.86 M²
2 9.8 3.5 68.6 M²
External Paint
2 10.7 3.5 74.9 M²
2 9.8 3.5 68.6 M²
Internal Paint
2 10.7 3.5 74.9 M²
Install Insulation 1 9.8 10.7 104.86 M²
False Ceiling 1 9.8 10.7 104.86 M²
Install Aircon Unit 1 2 2 Nos
Install Lights & Light Switches 6 Ea
Install Plug Points 3 Ea
2 10.7 0.6 12.84 M²
Wall Extension Work
2 9.8 0.6 11.76 M²

Block 2- Office space & Kitchen


Work Details Nos L W Area Unit
2 10.5 3.5 73.5 M²
Internal Paint
2 11.6 3.5 81.2 M²
2 10.5 3.5 73.5 M²
External Paint
2 11.6 3.5 81.2 M²
4 11.6 46.4 m
Partition wall
4 10.5 42 m
kitchen 1 1 Nos
Install Aircon Unit 5 5 Nos

Block 3-Office space (2XOffices)


Work Details Nos L W Area Unit
2 8.2 3.5 57.4 M²
Internal Paint
2 3.8 3.5 26.6 M²
2 8.2 3.5 57.4 M²
External Paint
2 3.8 3.5 26.6 M²
Install Aircon Unit 2 2 Nos

Block 4 -Open Training Room -15 People,1X Office, Filing Room


Work Details Nos L W Area Unit
Floor Tiling 1 76.6 76.6 M²
External Paint 2 43.5 3.7 321.9 M²
2 43.5 3.7 321.9 M²
1 9.6 5.5 52.8 M²
Internal Paint
1 6.8 5.5 37.4 M²
1 2 6 12 M²
1 2 2 Nos
Install Aircon Unit
1 2 2 Nos
Door Repairing 1 3 3 Nos
Window Repairing 1 7 7 Nos

Block 5- Open Workshop Training Room


Work Details Nos L W Area Unit
2 17 3.5 119 M²
2 15.6 3.5 109.2 M²
External Paint
2 8.8 3.5 61.6 M²
2 12.7 3.5 88.9 M²
2 17 3.5 119 M²
2 15.6 3.5 109.2 M²
Internal Paint
2 8.8 3.5 61.6 M²
2 12.7 3.5 88.9 M²
Install Office Container 1 Ea
Install Toilet Containers 2 Ea
Electrical Connection Ea
Plumbing Connections Ea
Parking bay for 6 vehicles 6 6 Ea
ELECTRICAL WORKS (Board Room lighting _supply and
installation/Outside/ablution lighting _supply and installation /Socket outlet
1 1 Sum
supply and installation/Earthing system (all materials included)/Distribution
Box EL and Breakers supply and installation
Install 4m High Diamond Mesh Fencing 150 150 M²