Professional Documents
Culture Documents
YADAH INOVATION
ARCHITECTURE
SCHEDULE OF AREAS
Mr THEOPHILUS MBEKWA
BEDROOM 5
AREA OF STAND 240sqm
Cell1: 065 865 5645
Plaster and Paint COVERAGE 45.75%
WhatsApp: 078 314 6810
EXISTING HOUSE A 42sqm Email: yadahprojectsexperts@yahoo.com
WASTE WATER: 50Ø uPVC AT MIN FALL 1:60 UNDERGROUND: 110Ø DAMP-PROOF COURSE Lufhereng
uPVC AT MIN FALL 1:60 DIRT WATER: 110Ø uPVC AT MIN FALL 1:60 The horizintal and vertical damp-proof course shall be of ALL NEW PROPOSED ALT B 67.81sqm Roodepoort
black polyethylene sheeting comply withSABS specification
952 Type B having embossed surfaces,0, 38mm thick (375 TOTAL GROUND FLOOR A+B = 109.81sqm 1724
Microns)in widths of less than 1000 mm. TOTAL GROUND COVERAGE 45.75%
North Elevation 1:100 GENERAL NOTES
TIES, SPACERS, ADDITIONAL BARS AND THE CONTRACTOR SHALL BE HELD RESPONSIBLE
STIRRUPS SHALL BE PROVIDED BY THE
1 700
FOE ENSURING THE STRUCTURAL STABILITY OF
DINNING ROOM ALL COMPONENTS OF THE WORK AND MUST
Plaster and Paint CONTRACTOR TO FURNISH SUPPORT FOR ASCERTAIN THAT THE STRUCTURE IS CAPABLE OF
SUPPORTING ALL LOADS APPLIED THERETO.
ALL REINFORCEMENT.
DAMP-PROOF COURSE 2. CONSTRUCTION JOINTS SHALL BE THE CONTRACTOR MUST CHECK AND CONFIRM
ALL LEVELS AND DIMENSIONS WITHIN THOSE
The horizintal and vertical damp-proof course shall be of
black polyethylene sheeting comply withSABS specification DOWELED, KEYED AND THOROUGHLY PLANS BEFORE PREPARING THE SITE
LAYOUT,AND REPORT ANY DISCREPANCIES TO
952 Type B having embossed surfaces,0, 38mm thick (375
South Elevation CONCRETE ROOF TILES @ 20.0degree ANGLE ON MARLEY HIGH−QUALITY 1:100 CLEANED. AMOS.T FOR WRITTEN CONFIRMATION AND
Microns)in widths of less than 1000 mm.
UNDERTILE MEMBRANE (2 PLY 400 MICRON POLYPROPYLENE LAMINATE)
ON 38x38mm SA PINE PURLINS @ 345mm c/c ON ROOF TRUSSES @ 760mm
3. MINIMUM LAP OF WELDED WIRE CHANGES BEFORE ANY WORK COMMENCES.
1 136
0,5mm THICK, KLIP LOK 700 GALVANISED STEEL ROOF COVERING (DRSTBR) TILE NAILS : 75mm x 3,35mm PITCH : 20.0.degree (75mm HEADLAP)
SIZE OF TILE : 420mm x 332mm
WITH CHROMADEK COATING Z200 SPELTER ISQ550 FINISH TOP COAT
AND GREY BACKING COAT, FIXED TO STEEL CHANNEL PURLINS @ 1 321 4. COORDINATE AND INSTALL ALL WORK TO STRICTLY ADHERE TO RELEVENT SABS
REQUIREMENTS.
MAX 1700mm CENTRES. (COLOUR: TRAFFIC GREEN) REQUIRED EMBEDDED ITEMS, INSETS
AMOS.T RESERVES COPYRIGHT OF THIS DESIGN
SLEEVES, POCKETS, ETC. AS REQUIRED AND DRAWIGS.WRITTEN PERMISSION MUST BE
PRIOR TO PLACEMENT OF CONCRETE. OBTAINED FROM AMOS.T BEFORE ANY
CCOPYRIGHT OR USE (OTHER THAN FOR THIS
5. EPOXY COATED BARS MAY BE SPECIFIED STAND) IS MADE OF THIS DRAWING OR
THE INHERENT INFORMATION CONTAINED HERE-
SUBSTITUTED FOR GALVANIZED REBAR. IN.
FOUNDATION NOTES
THEORETICAL ANNUL ENERGY CONSUMPTION CALCULATION 30mm SCREED ON 85mm CONCRETE SURFACE
BED ON WELL COMPACTED FILL. DAMP PROOF
MEMBRANE WHERE REQUIRED.
LIGHTING:50 LIGHTS
East Elevation 1:100 ENERGY COMMAND (OCCUPANCY= H4) WALL NOTES
CONCRETE ROOF TILES @ 20.0degree ANGLE ON MARLEY HIGH−QUALITY MAXIMUM ALLOWED :5W/SQM
UNDERTILE MEMBRANE (2 PLY 400 MICRON POLYPROPYLENE LAMINATE) TOTAL FLOOR AREA : UNLESS OTHERWISE SPECIFICALLY MENTIONED,
ON 38x38mm SA PINE PURLINS @ 345mm c/c ON ROOF TRUSSES @ 760mm PERMISSIBLE ON THIS HOUSE: ALL SCREEN WALLS,BOUNDARY WALLS AND
c/c MAX ON 114x38mm TIMBER WALLPLATES PROPERLY SECURED WITH GARDEN WALLS TO BE 220mm WALLS WITH MAX.
ROOF WIRES TILE : DOUBLE ROMAN ’MARLEY’−STANDARD BROWN ACTUAL USAGE :
EXTERNAL WALL CALCULATION HEIGHT OF 1800mm WITH EXPANSION JOINTS AT
(DRSTBR) TILE NAILS : 75mm x 3,35mm PITCH : 20.0.degree (75mm HEADLAP)
3500mm.NO FOUNDATIONS TO ENCROACH
SIZE OF TILE : 420mm x 332mm 0,5mm THICK, KLIP LOK 700 GALVANISED STEEL ROOF COVERING REQUIRED CR-VALUE: 8 CR/h
WITH CHROMADEK COATING Z200 SPELTER ISQ550 FINISH TOP COAT
BOUNDARIES.THE FINISH IS TO BE RENDERED IN 1
DOUBLE SKIN MASONRY : 40 CR/h COAT WOOD FLOATED PLASTER, PAINT AS
BEDROOM 5
AND GREY BACKING COAT, FIXED TO STEEL CHANNEL PURLINS @ PLASTERED AND RENDERED INTERNALLY: 20 CR/h
MAX 1700mm CENTRES. (COLOUR: TRAFFIC GREEN) SPECIFIED.
PLASTERED AND RENDERED EXTERNALLY : 20
CR/h TOTAL: :80 CR/h
PASSAGE
Ceilling lights 21 (5W LIGHTS) 105 WATTS
Revision History
OF THE AVERAGE HOT WATER HEATING RevID ChID Change Name Date
0,268
STRUCTURAL TIMBER
TRUSS BY SPECIALIST
REQUIREMENTS SHALL BE PROVIDED BY
0,090
MEANS OTHER THAN ELECTRICITY
1,810
for
IES-02 Window Schedule Site 1:177,79 FOLLOWING IN ORDER TO ARCHIVE MRS MASULUKE
Quantity 1 1 1 1 6 7 9 20
Floor construction to provide floor finish on 25mm screed on 85mm
surface bed on gunplas usb green dpc on well compacted fill
Sill height 0 400 1 600 2 500 400 1 200 400 400
COMPLIANCE: -INTEGRATED SOLAR AND on
sparayed with insect poison before dpc is layed and to be confirmed
Head height 2 100 2 100 2 100 4 000 2 100 2 100 2 100 2 100 ERF GIYANI
HEAT TANK SYSTEM TO SPECIFICATION.
by the engineer
CONCRETE ROOF TILES @ 20.0degree ANGLE ON MARLEY HIGH−QUALITY UNDERTILE MEMBRANE (2 PLY 400
MICRON POLYPROPYLENE LAMINATE) ON 38x38mm SA PINE PURLINS @ 345mm c/c ON ROOF TRUSSES @ 760mm c/c