You are on page 1of 1

SAUDIARAMCO.

MARL (NOTE-11)
NOTES: (SEE BELOW)

CLASS
CLASS 1
LOCATION
LEGEND:
DESIGN
0.72
FACTOR PIPELINE CENTERLINE

PRESSURE MAOP 2000 PSIG


8
PIPELINE CENTERLINE (PROPOSED)

T
EXISTING PIPELINE - BELOW GROUND

OF
P
P

EXISTING PIPELINE - ABOVE GROUND

CONSENT
P
K
TRANSITION POINT 8
K
STA 3+728.44 P POWERLINE AND POLES

T
P

T
8
P - 8 END
-
PI-5 K
T 0F1
C C UNDERGROUND CABLE
8
8 STA 3+733.21
N 2706672.692 K T
P N 2705783.145
E 308679.987
T T TELEPHONE LINE
LE E 309114.568

P
PI

TTEN
0F1

R=105.00m RT
0F1

PC-5 DI PAVED ROAD

ANCHOR
POI
NOTE-7)
TT
P

NT
D=29°29'32.64"
STA 2+546.78

WRI
L=54.05m K 8
N 2706690.258 DIRT ROAD

ANCHOR
POI
8

NOTE-7)
NT
T=27.64m
0F1

P
E 308658.651 0F1

8
TRAIL

0
8
THRUST ANCHOR
0F1

PT-5

1577
(
NOTE- 7)
POINT

THE
ANCHOR

80

T
STA 2+600.83 P STA 3+716.21

T
-
K PC-6 - RAILROAD TRACK
N 2706646.899

6
STA 3+009.74 C/L
8

70
E 308689.912
P/L

THOUT
8 8
P N 2706265.261
8
E GUARD RAIL
T T T
U/G
88
T

(
200

30

NOTE-7)
2 m - 9 T 9
E 308836.755 RH-CK 20
8 8 8 8 8 8
T T)
( 8 0 RETAINING WALL
8
E
BL
8
T
N

T T T T T T T T P
T
K
T 8 T CA
8
T T
T U/G

WI
3+700 BURN PIT

T
PT-6 DIKE, SAND WALL
P STA 3+036.78
13 T 8
3.

NG
T
' N 2706239.067
8
FENCE LINE
°26 74 8

74 50 2+ PK 84

DRAWI
46
T
1
6. 3. 3. E 308843.125
79
8

63 65
TREE LINE

T
2+ 2+ 2+ 158°57'17" ROW

T
8
PT-7

T
P U/ BUSH, HEDGE, BRUSH AS NOTED

2+600

2+700

2+800

2+900

3+000
PLAN

408.91m G
" P/ 8
STA 3+645.03
'45 L
C/
FO

27

S
K
L
100

5
SABKHAH

THI
N 2705747.379
9° 1m C/

3
100
P

9.4
12

+6
7

T
R

9. L E 309035.888

T
0 P/ L PI-6

3+
0

8 76

55T
.
C/ 3+201

11 97
8
STREAMS
80

3
50

NE
0

G NOTE-2
CO

N 2706252.576 3+

+
U/ P LI
50

MARL ROAD

.7
L 8
60

0
P/

FROM
2+

ER

3+
49 0
3+226.

20

1 39 7
E 308841.635
2+

3
8
POND
NT

K W G
60

+
PO A/

3+

5
P T

.
R=105.00m
M

8
T
42 T
8
H
2000

IN

2
O/

0
AT

D=14°45'02.49" WADI

.2
173

30
40

T
°

76
U

42
1:

L=27.03m T

NED
'
40 '20

64
CH

3+
AT

P 3. "

4.

66.
3+

0
T=13.59m 03 WELL OIL WELL OR WELL SITE
m 56

°2

86.
8
SCALE

20

0
K

55

T
1.

OBTAI
IO

40
20 T

19
8" HRDH-611 F/L

3+5
LI EE

60

T
00
P TOWER

3+
N

3+

3+5
8
NE

3+5
0

T
T
6
S

8 U/G E TRANSMISSION TOWER


P/L 30
70

T
8
T C/L 9
PC-7
ST

8 00

BE
T 0

T
8 m BUILDING
2

U
STA 3+446.85 U/G T

/
A
DW

CAB
LE

G
T
N

N 2705831.462 (
T) 8
SIGNPOST

PART,SHALL
U

P
T
2+ A-8
G

E 308888.085

/
T

L
T
SURVEY MONUMENT/STATION
50

U
T

C
PT-7

/
G

L
STA 3+591.73 8
0

L
AD

P
FULL THRUST ANCHOR

E
/
RO

/
T
N 2705687.456

(T
43

T)
L

T
m

C/L
AR E 308903.970

)
C

C
SCRAPER PASSAGE INDICATOR

T
8

(
8 SPI

/
M
60

L
R=105.00m

L
0

0
LE

T
E
40

20

00

80
D=108°05'47.3"

60

40
KILOMETER MARKER
3.

P/L

(T
CAB

N
L=198.18m

I
T
00

)
6

5
T=144.88m
T KILOMETER MARKER WITH TEST STATION
70

70

70

70

70

70

FULL,OR
U/G
3

T
U/G

T
8

E E
W WARNING SIGN
2

2
T
30 30
8 8
N

N
60 80
0 8 0 8 EXISTING UNDERGROUND PIPELINE

T
EXISTING UNDERGROUND TELECOM CABLE

FLANGE

N
I
W
00

ANCHOR
DATA

CAMEL CROSSING (PLAN)


2+500.

ON
21
86
00

21

REPRODUCTI
3+716.
STA.3+704.
3+000.
CAMEL CROSSING (PROFILE)

3+733.
A/G
AL

:NONE
MATERI

THRUST
BERM AT PLAN
STA

AT
FENCE

STA
SCALE

STA

STA
END
REVISION CLOUD
NE
LI
&

8" HRDH-611 F/L


RH-CK
PE

SAUDIARAMCO.NO
REVISION MARKER
MATCH

XXX
PI

8.625" ODx0.344" WTH API 5L GR X65 SMLS


PIPE, EXT FBE COATED

REFERENCE DRAWINGS

NT
PC-5

PT-5

C/L

C/L

P/L

PC-6

PT-6
NE

ROAD

ROAD

T)

T)

T)

ANCHOR
PC-7

C/L

C/L

C/L

PT-7

FENCE

END
POI
POWERLI

(
C/L
ELEV ELEV ELEV ELEV
DWG. CONTROL FOR J.O.10-02029-0003 TD-896993

CABLE

CABLE

CABLE
m m m m
P/L

P/L

A/G

P/L

P/L

P/L
G

ON
RI

RI
100

P/L
8" HRDH-611 F/L 0F1

TI
THRUST
ZONTAL

U/G

U/G

TRANSI
U/G

U/G

U/G
O/H

U/G

U/G

U/G

U/G
80

OF
HORI

60

EXISTING GROUND PROFILE

PROPERTY
2000

62m

48m

74m
78

83

74

46

84

74

78

49

85

42

45

76

27

64

39

03

86

44

21
NOTE-2
17m

31m

12m

69m

98m

85m

94m

86m

38m

78m

56m

27m

03m

03m

03m
13

76

21
15m

13m

12m

10m

16m
71
STA.2+546.

STA.2+600.

STA.2+636.

STA.2+653.

STA.2+743.

STA.2+793.

STA.3+009.

STA.3+036.

STA.3+226.

STA.3+446.

STA.3+554.

STA.3+559.

STA.3+566.

STA.3+582.

STA.3+586.

STA.3+597.

STA.3+645.

STA.3+704.

STA.3+728.

STA.3+733.
STA.3+201.

STA.3+716.
40

STA.3+611.
ELEV.305.

ELEV.306.

ELEV.308.

ELEV.308.

ELEV.308.

ELEV.308.

ELEV.310.

ELEV.310.

ELEV.313.

ELEV.313.

ELEV.315.

ELEV.315.

ELEV.315.

ELEV.315.

ELEV.315.

ELEV.315.

ELEV.315.

ELEV.314.

ELEV.314.

ELEV.316.

ELEV.316.

ELEV.316.

ELEV.316.
1:

TOP OF BERM
900mm FROM TOP OF PIPE
SCALE

20

TOP OF PIPE PROFILE


0

SOLE
315 315 320 320
LE
PROFI

THE
310 310 315 315
10

ARE
CAL

8
VERTI

N
HEREI
6

305 305 310 310


200

4
1:

1.2m (TYP.) 1.0m (TYP.) 0.6m (TYP.)


SCALE

NED
SCALE: AS SHOWN

CONTAI
300 300 305 305
0

2+500

2+600

2+700

2+800

2+900

2+900

3+000

3+100

3+200

3+300

3+400

3+500

3+600

3+700

3+800

3+900
REVISION VALIDATION

THIS REVISION NO. 0F1 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
10-02029-0003-000

NFORMATI
MATERIAL DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
SURVEY NOTES: (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
GENERAL NOTES:
ITEM QUANTITY0F1 DESCRIPTION 1. COORDINATES ARE UTM (ZONE 39) INTERNATIONAL (1924) 8. PROFILE WAS EXTRACTED FROM PHOTOGRAMMETRIC MAPPING
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

MMB VKP
1 1233m 8.625" OD x 0.344" WTH API-5L GR X65 SMLS PIPE, EXT FBE COATED ELLIPSOID, AIN AL ABD 1970 DATUM IN METERS WITH A PROBABLE VERTICAL ACCURACY OF +/- 1M. 1. SEE NOTES IN DWG NO TA-843603.001 04/15/18 04/15/18

2 2 KILOMETER MARKER W/O TEST STATION PER STD DWG AD-036973 AND AB-036907 (1994 HORIZONTAL ADJUSTMENT). REV.NO. DATE REVISION DESCRIPTION
9. THE EXACT LOCATION OF ALL UNDERGROUND FEATURE ARE APPROXIMATE

I
2. CONSTRUCTION CONTRACTOR SHALL VERIFY THE ELEVATION AND EXISTING 0F1 04/15/18 ISSUED FOR CONSTRUCTION
0F1
3 1 WARNING SIGN PER STD DWG AB-036891 2. ELEVATION DATUM IS SAUDI ARAMCO VERTICAL DATUM AS PER GSD. IT IS STRONGLY RECOMMENDED THAT THE EXACT LOCATION FACILITIES OF STATION APPROACH PRIOR TO CONSTRUCTION, AS GSD DATA

THE
OF 1978 (SAVD78) 1994 ADJUSTMENT. & ELEVATION OF THESE FEATURES BE VERIFIED PRIOR TO ANY FOR APPROACH LOCATION IS NOT AVAILABLE. JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION IN THE RELATIVE AREAS. 10-02029-0003 CONSTRUCTION UNTIL CERTIFIED AND DATED
3. DATE OF SURVEY: 0000 AERIAL PHOTOGRAPHY 3. THE KM MARKER WITH TEST POST ARE INDICATIVE ONLY, THE ACTUAL
10. ALL BURIED PIPELINES NOT FIELD LOCATED. LOCATION
SAUDI ARABIAN OIL COMPANY

AND
4. STATIONING IS GROUND DISTANCE IN METERS, CP DETAILS SHALL BE CAPTURED FROM CP DOCUMENTS / DRAWINGS.
SHOWN IS BASED ON CENTERLINE OF BERM. DRAWING TYPE
DIRECTIONS AND DISTANCES ARE GRID.
11. SOIL TYPES SHOWN ON THIS DRAWING ARE A GENERAL(1924) 4. CONSTRUCTION CONTRACTOR NEED TO FOLLOW THE COORDINATES
PIPELINE ALIGNMENT PRF

NG
5. GROUND DISTANCE X COMBINED FACTOR = UTM GRID DISTANCE.
DESCRIPTION OF SURFACE MATERIALS ONLY, PROVIDED IN THIS ALIGNMENT SHEET. COORDINATES OF FLOWLINE A/G
0F1 8" HRDH-611 F/L

DRAWI
6. COMBINED FACTOR = 1.000005936 DETERMINED BY VISUAL INSPECTION FLANGE IN THIS DRAWING ARE BASED ON SAUDI ARAMCO PROVIDED

7. ALL PLANIMETRIC FEATURES SHOWN IN LOW TONE WERE


WELL HEAD CENTER COORDINATES.THIS COORDINATE SHALL BE FOLLOWED GAS GATHERING MANFS. F/LINES
FOR CIVIL WORK, INCLUDING THRUST ANCHOR BLOCK AND PIPING DRAWINGS.
EXTRACTED FROM PHOTOGRAMMETRIC MAPPING WITH HARADH SAUDI ARABIA
A PROBABLE HORIZONTAL ACCURACY OF +/- 5M.

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
DATE OF PHOTOGRAPHY: 0000
H91 A TA-843603 004 0F1
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05