Single Cell: 2x1.5mm Span Road Width in (m) 10.00
Total Unit
Decsriptions Diameter Spacing M2 Length No. of Total Weight-
SN Bar Shape M1 (mm) Length Weight Remarks
of Items (D-mm) (mm) (mm) (mm) Bars kg
(TL)-m (Kg/m)
A RCC Box Culvert
M1
M1
3 Rebar-3 - - 1,400 - 1,400 - - -
M2
0.2m
M2
M2
6 M1 M1 Rebar-6 16 250 300 2,500 3,036 41 124.48 1.58 196.70
M1
7 Rebar-7 - - 1,400 2,800 - - - -
M2
8 M1 M1
Rebar-8 10 250 750 2,500 3,960 41 162.36 0.62 100.22
M1
M2
9 Rebar-9 10 250 200 919 1,279 82 104.90 0.62 64.75
M1
M1
M2
11 M1 M1 Rebar-11 10 250 175 9,900 10,210 16 163.36 0.62 100.84
M2
12 M1 M1 Rebar-12 10 250 190 9,900 10,240 16 163.84 0.62 101.14
M2
M2
M1 M1
15 Rebar-15 10 250 190 9,900 10,240 12 122.88 0.62 75.85
Approach
M1
16 Rebar-16 Not Used Rest part of
Box cell
M1
Approach
17 Rebar-17 Not Used Rest part of
M2
Box cell
M1 M1
18 Rebar-18 10 - 180 9,900 10,220 4 40.88 0.62 25.23
M2
M1
50mm
20 M2 Rebar-20 10 200 200 1,030 2,660 19 50.54 0.62 31.20 Cut off US
M2
M1
M1 M1 Cut off
21 Rebar-21 10 200 150 3,500 3,760 28 105.28 0.62 64.99
M2 Distribution
M2 Abutment
22 M1 M1 Rebar-22 10 250 150 9,900 10,160 12 121.92 0.62 75.26 wall
Distribution
M1
50mm
23 M2 Rebar-23 10 200 200 1,780 4,160 19 79.04 0.62 48.79 Cut off DS
M2
M1
e
d 50mm
24 a Rebar-24 10 200 - - 1,974 28 55.28 0.62 34.12 Kerb
c
Total 2,485.40 Kg